Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
15 Aug 2026, 5:30 pm
EXECUTIVE ENGINEER
PANDAVNAGAR SHAHDOL
Strengthening of Sakhi to to Puraniha Road Total Length 2.00 K.M. Working Length 1.50 k.m.
2026_PWDRB_524065_1
NIT NO-06/2026-27/24-07-2026
Open Tender
Civil Works - Roads
Percentage
90 days
SHAHDOL
Please refer Tender documents.
8 documents required · 8 mandatory
₹12,500
₹1.5 L
24 Jul 2026
24 Jul 2026
17 Aug 2026
24 Jul 2026
15 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees having girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material up to a lead of 1000 meters including removal and disposal of top organic soil not exceeding 150 mm in thickness.
A- In area of light jungle | 0.6 | Hec | 29,409 | ₹17,645.4 |
| 2 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m) | 540 | Cum | 79 | ₹42,660 |
| 3 | Construction of Embankment with Material Deposited from Roadway Cutting Construction of embankment with approved materials CBR>7 deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300 | 162 | Cum | 60 | ₹9,720 |
| 4 | Embankment Construction with Material Obtained from Borrow Pits Construction of embankment with approved material having CBR>7 obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1, 300-2 and as per relevent clauses of section-300. | 4,461.14 | Cum | 298 | ₹13,29,419.72 |
| 5 | Crusher Run Macadam Sub Base/Base Course Providing crushed stone aggregate, depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller to clause 410 to form a layer of sub-base/Base in accordance to Table No. 400-14, 400-15 and as per clause of section 407 of specifications. | 1,708.1 | Cum | 1,198 | ₹20,46,303.8 |
| 6 | Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density in accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications. | 695.25 | Cum | 1,451 | ₹10,08,807.75 |
| 7 | Prime Coat Over WMM/WBM
(i) Providing and applying primer coat with catonic bitumen emulsion on prepared surface of granular Base including cleaning of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means as per clause 502 of specifications | 3,090 | Sqm | 44 | ₹1,35,960 |
| 8 | Providing and applying tack coat with catonic bitumen emulsion using emulsion pressure distributor on the prepared bituminous/granular surface cleaned with mechanical broom and as per relevant clauses of section-503 of specifications.
(i) @0.30 kg per sqm (dry & hungry bituminous surfaces /granular surfaces treated with primer) | 3,090 | Sqm | 17 | ₹52,530 |
| 9 | Dense Graded Bituminous Macadam
Providing and laying dense bituminous macadam using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a Electronic Sensor paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause
505 of specification complete in all respects.
b) Using Drum Mix Plant of appropriate capacity
(iv) for GradingII(26.5 mm nominal size) Bitumen content minimum 4.5% with bitumen 60/70 (VG 30) | 154.5 | Cum | 7,759 | ₹11,98,765.5 |
| 10 | Bituminous Concrete
Providing and laying bituminous concrete using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % by weight of total mix of mix and filler, transporting the hot mix to work site, laying with an Electronic Sensor paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory tandem and pneumatic tyre rollers to achieve the desired compaction as per clause 507 of specification
b) Using Drum Mix Plant of appropriate capacity
(v) for Grading-II (30-40 mm thickness) Bitumen Content minimum 5.4% with 60/70 bitumen (VG-30) | 92.7 | Sqm | 9,260 | ₹8,58,402 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.03 MB
NITDOCUMENTS.pdf
Tender Documents • 0.56 MB
BOQ_631129.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].