| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-Finance GORAKHPUR UTTAR PRADESH 273006 INDIA UDYAM UP 32 0070581 | GORAKHPUR | UTTAR PRADESH | 273006 | ₹19.6 L | L1 | Accepted-Finance Quoted rate is lowest |
| 2 | L2₹21.9 LRejected-Finance | ₹21.9 L | L2 | Rejected-Finance Quoted rate is on higher side |
| 3 | L3₹22.7 LRejected-Finance | ₹22.7 L | L3 | Rejected-Finance Quoted rate is on higher side |
| Sl No | Description | Qty | Unit | M/S SHEKHAR ENGINEERING WORKS L3 | MS RK ERACTORS L2 | M/S V P ASSOCIATES WORKS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00Part (A)- Supply | ||||||
| 1.01Tower Accessories. | ||||||
| 1.02 | Number Plate | 2 | Nos. | 315 ₹630 | 300 ₹600 | 290 ₹580 |
| 1.03 | Danger Plate | 2 | Nos. | 315 ₹630 | 300 ₹600 | 290 ₹580 |
| 1.04 | Phase Plate Set of red blue and yellow | 2 | Sets | 320 ₹640 | 300 ₹600 | 270 ₹540 |
| 1.05 | Earthing Material | 4 | Nos. | 3,150 ₹12,600 | 3,000 ₹12,000 | 2,990 ₹11,960 |
| 2.00Conductor Accessories Suitable for ACSR Panther. | ||||||
| 2.01 | Vibration Damper | 18 | Nos. | 535 ₹9,630 | 520 ₹9,360 | 503 ₹9,054 |
| 2.02 | M.S. Joints. | 4 | Nos. | 575 ₹2,300 | 550 ₹2,200 | 546 ₹2,184 |
| 2.03 | Repair Sleeve & others items | 4 | Nos. | 215 ₹860 | 190 ₹760 | 180 ₹720 |
Tender Value
Refer Docs
EMD Value
₹23,500
Closing Date
4 Feb 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SUPERINTENDING ENGINEER, ELECTRICITY TRANSMISSION CIRCLE, 220KV S/S, GIDAHI, BASTI
Diversion of 132KV Bansi-Rudhauli S/C Transmission Line Between Location No. 04 to 05 on DC Tower under Electricity Transmission Division-II, Basti, H.Q. at Siddharthnagar
2026_UPTCL_1106981_1
SHORT TERM E-TENDER NO. 49/ETC(B)/2025-26
Open Tender
Miscellaneous Works
90 days
220 KV Sub-station Gidahi Basti
AS PER TENDER
2 documents required · 2 mandatory
₹590
Yes
UPSEB ELECTRICITY TRANSMISSION DIVN
₹23,500
9 Feb 2026
17 Jan 2026
5 Feb 2026
17 Jan 2026
4 Feb 2026
17 Jan 2026
Part (A)- Supply
Tower Accessories.
Number Plate
Danger Plate
Phase Plate Set of red blue and yellow
Earthing Material
Conductor Accessories Suitable for ACSR Panther.
Vibration Damper
M.S. Joints.
Repair Sleeve & others items
P.A. Rod
Hardwares & Insulator Accessories for Conductor.
Single Suspn FTTG.
Single Tension FTTG.
Double Tension FTTG.
70 KN Poreelain Insulator.
120 KN Porelain Insulator.
OPGW Accessories
Joint Box 48F
Supply of OPGW
48 Fibre (DWSM) OPGW Fiber Optic Cable
Supply of Hardware Set for 48 Fibre OPGW
Part (B)- Erection Work
Survey including preparation of schedule of materials, marking of locations (Router Length). GPS Survey of line with co-ordinates of each tower (The length of line shall be authenticated by GPS Survey).
Check Survey
Soil Investigation (all kind of soil)
Cost of excavation of 132 KV tower foundation pits including all earth work backfilling levelling etc.
Setting of Nuts including all foundation work but encluding the cost of concerting excavation (Rate per Location) for following towers.
132 KV DC Panther
Cost of concreting of all type of tower foundation including cost of cement, dewatering , shoring and shuttering, forming, curring cube test but excluding cost of reinforcement bars.
1:2:4 concreting.
Erection of superstructure of 132 KV DC Tower and anchor tower and their extension wherever required including all work above ground level excluding hosting in insulators hardware & Accessories,but including fitting of danger number, phase plates, bird guard and fixing & punching for 132 KV SC/DC lines.
Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200 seperation of minimum 10 mm thickness with 10mm/12mm electrode & application of zine rich alluminium paint of the affected surface including cost of all material including tack welding of river crossing tower & Anchor Towers.
Installation of steel reinforcement bars m RCC Foundation including cost of steel reinforcement bars with cutting bending placing dinding etc.
Laying, Stringing tensioning, clamping jointing etc. of ACSR Panther conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fitting armor rods vibration dampers etc. on all three phase of 132 KV SC Lines.
Laying, Stringing, tensioning, clamping, jointing including fitting of all necessary Hardware and accessories including Joint Box of OPGW Fiber Optic Cable & testing etc on 132 KV & 220 KV Lines.
Grounding work including earthwork etc. pipe type grounding including cost of cake & salt.
Dismantalling work.
De-Stringing of conductor, disc insulator, rolling of Dismantle conductor and all associated work of all Three conductor
Dismantling of existing OPGW necessary hardware, Rerolling of earthwire on empty drum & safety transportation of all removed materials to store of 132 KV Sub-Station, Rudhauli.
Dismantling of Towers, stacking of tower part and all associated work . Including measurement of tower weight on nearest dharmkata and providing of its measurement report.
Anchoring by providing of back stay on cross arm of 132 kv bast-Rudhauli line at tower location No-67 and 68 before removal of old conductor including suitable fixing of stay rod by making CC foundation and removal there of after completion of work (01 job per stay)
Transportation of dismantaled material like tower parts, conductor, fitting etc. including shifting up to loading point, loading into vehicle, transportation, and unloading at Store of 132 KV Rudhauli substation.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
TECHNICAL49.pdf
Tender Documents • 5.43 MB
BOQ_2042593.xls
BOQ • 0.27 MB