ENVIRONMENT ENGINEER
NAGAR NIGAM AGRA
Setting up facilities for Cremation Design, Supply, Installation, Testing and Commissioning of Cow-Dung Based Incineration at Kabir Samshan Ghat Agra
2023_DOLBU_834301_1
02-09-2023/NAGAR NIGAM GC/11-09-2023/01
Open Tender
Miscellaneous Works
180 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
NAGAR NIGAM
₹10 L
Yes
21 Sept 2023
2 Sept 2023
11 Sept 2023
2 Sept 2023
11 Sept 2023
2 Sept 2023
Amount
Design, supply, installation, testing and commissioning of 2 Nos. of Cow Dung Cremation Furnace) with 01 Year of Free Operation and Maintenance of the Crematorium at designated location as per details below and Technical Specification
CNG Cremation Furnace casing:- The Cremation furnace designed, supply, installation, testing and commissioning with following technical specification : (a) each furnace would take 6 to 8 bodies in a day.(b) maximum temperature of 700⁰ C to 900 C can be brought . (e)Overall Size :- 11.5 feet (L) x 6 feet (H) x 6 feet (W) Frame make with MS Steel Structural with U channel :- 100 mm x 5 mm (g)Foundation of the furnace make with red bricks and RCC bottom to plinth level:-
Front Doors sliding door system for easy opeartion The front doors made of MS in front side duly fabricate the frame of MS angel/channel fill with high complete insulation material with fiber insulation and SS rod 5 mm inside for hold the insulation door operation material
Refractory lining of the furnace and insulation. Hot face insulation bricks, Ceramic fibre, dead body support will be for furnace with Highly efficient insulation to maintain the temperature with 6 step in be used of 70% fire brick, 40% fire bricks good quality, light weight insulation bricks, 1” fibber insulation board quality, red bricks with plaster and frame work with fibber insulation
Electrical Control Panel for Furnace for auto ignition Control panel with 3 Phase Over load MCB , individual 3 Phase MCB, Control MCB, I.D. Fan Contractor & amp ; Over load Relay, Water Feeding motor , Temperature Controller 0-120 deg. Centrigrade, Thermocouple and Compensating lead , Out Put Warring etc as required
Track and Trolley Made by section of size 100 mm x 50 m x 5 mm channel provided with complete arrangements for carrying the body completely made up of SS 304 3 MM THICK SHEET
SITC of Chimney Foundation for Chimney Size :- 8000 mm (W) x 8000 mm (L) x 1650 mm (H) for 2 units. Foundation Bolts L –type:- 36 mm (dia) x 950 MM (L)) with double nuts and washer x 150 mm long thread. Cone MS Cone 1200 mm bottom dia x 8 mm thickness x 3000 mm height Base plate:- 1800 mm x 1800 mm x 25 mm thick Top size of cone weided with 25 mm thick flange suitable for fixing with pipe. Service window 600 mm x 600 mm. Ribs :- 15 Nos: 600 mm x 200 mm x 10 mm Pipe 300 mm dia x 6 mm thick with 18 mm flange Welded Both Sides, having 20 mm dia holes suitable for fixing 18 mm dia high tensile bolts. Having 15 Nos. of ribs 125 mm x 100 mm x 10 mm thick. Ladder with Safety cage Monkeys type ladder with 50x 6 MS angle. Plate Form 02 Nos. for Smoke testing. Base made of 4mm wire mesh having spring std 1000 mm (H) x 1400 mm (W) etc. as required HEIGHT OF CHIMNEY WILL BE 12000 MM
SS Wet Scrubber for Gases and Pollution control size 900 MM total 3787 mm (L) with SS 304 horizontal round shape. Wet scrubber will be provided for gases and pollution control size of based dia 900 mm x 3 mm thick x 3787 mm (L) Outlet pipe lines, valves and necessary pumping unit fitted on water tank, minimum 1000 Lt capacity PVC over head tank for each unit furnace.
Design and Development of area of about 180 sq metres with an open truss shed of 120 sq metres an open space of 40 sq metres for installation of chimney and foundation and 20 sq metres for greenery and other beauutifications like Large God Statue, CCTv Cameras, Dead Body waiting platform, Television, Computer, Texture Painting for Superior design, Big Hoarding Banners for advertisement, Speakers, Furniture, Small Fountain, Fire extinguishers to establish 02 Nos of Cow Dung Cremation Furnaces and Equipments inside the Cremation Hall. The Hall will be having a truss at an appropiate height from the ground. Extra space for Chimney will be provided at the back of hall 40 sqmetre and also greenery should be done across the hall for beautification