Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.4 CrAccepted-AOC KACHEHRI AMBEDAKARNAGAR CHAUK DISTRICT GORAKHPUR | ₹32.4 Cr | L1 | Accepted-AOC R |
| 2 | L2₹33.1 CrRejected-Finance GORAKHPUR | UTTAR PRADESH | 273001 | ₹33.1 Cr | L2 | Rejected-Finance RBCM |
| 3 | L3₹33.3 CrRejected-Finance | ₹33.3 Cr | L3 | Rejected-Finance RBCM |
| 4 | L4₹33.4 CrRejected-Finance | ₹33.4 Cr | L4 | Rejected-Finance RBCM |
| 5 | Rejected-Technical 907 NEW DELHI HOUSE 27 BARAKHAMBA ROAD NEW DELHI 110001 | NEW DELHI | NEW DELHI | DELHI | 110001 | - | - | Rejected-Technical RBMC |
| Sl No | Description | Qty | Unit | M/s VIJENDRA PRATAP SINGH L2 | R.K.TRADERS & CONSTRUCTION PRIVATE LIMITED L1 | Prabha Construction Infra Private Limited L4 | AMBE INFRAPROJECTS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres. .Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per MORTH Sr. No. 3.06 & Technical Specification Clause 301 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | 18,005.52 | Cum | 60 ₹10.8 L | 25 ₹4.5 L | 61 ₹11.0 L | 62 ₹11.2 L |
| 2.00 | Construction of Embankment with Material Deposited from Roadway Cutting .Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted density not less than 97% of designed density of JMF to meet requirement of table 300-2.as per MORTH Sr. No. 3.017 & Technical Specification Clause 305 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | 18,005.52 | Cum | 65 ₹11.7 L | 30 ₹5.4 L | 64 ₹11.5 L | 63 ₹11.3 L |
| 3.00 | Construction of Embankment with Material obtained from Borrowpits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting density not less than 97% of designed density of JMF to meet requirement of table 300-2.as per MORTH Sr. No. 3.16 & Technical Specification Clause 305 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. (Carted Earth work in Abadi Portion upto Not Less then 2km) | 16,975.48 | Cum | 116 ₹19.7 L | 100 ₹17.0 L | 118 ₹20.0 L | 120 ₹20.4 L |
| 4.00 | Construction of Embankment with Material obtained from Borrowpits Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading with 2% lime, grading to required slope and compacted density not less than 97% of designed density of JMF to meet requirement of table No. 300-2 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | 3,522.75 | Cum | 410 ₹14.4 L | 400 ₹14.1 L | 420 ₹14.8 L | 400 ₹14.1 L |
| 5.00 | Construction of granular sub-base (Grade-1) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 as per designed density of JMF per MORTH Sr. No. 4.01 & Technical Specification Clause 401 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | 9,030.46 | Cum | 4,570 ₹4.1 Cr | 4,579 ₹4.1 Cr | 4,600 ₹4.2 Cr | 4,580 ₹4.1 Cr |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical 100 tonne mix plant carriage of mixed Material by 10 cum capacity tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.complete as per MoRTH clause 406 With Design Job Mix formula Approved By Competent Authority complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | 3,189.45 | Cum | 5,155 ₹1.6 Cr | 5,145 ₹1.6 Cr | 5,200 ₹1.7 Cr | 5,160 ₹1.6 Cr |
| 7.00 | Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, OPC of approved brand cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | 1,056.83 | Cum | 6,520 ₹68.9 L | 6,500 ₹68.7 L | 6,400 ₹67.6 L | 6,500 ₹68.7 L |
| 8.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-35 over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing .with porper water curing as per MORTH Sr. No. 6.02 & Technical Specification Clause 402.With Design Job Mix Approved By Competent Authoritycomplete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | 1,857.45 | Cum | 9,000 ₹1.7 Cr | 8,865 ₹1.6 Cr | 9,060 ₹1.7 Cr | 9,050 ₹1.7 Cr |
| 9.00 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | 28,995 | Sqm. | 40 ₹11.6 L | 35 ₹10.1 L | 45 ₹13.0 L | 50 ₹14.5 L |
| 10.00 | Providing and laying dense graded bituminous macadam Grade-1 thickness 80mm with Bitumen VG-40 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. as per MORTH Sr. No. 5.4 With Design Job Mix Approved By Competent Authority complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. | 2,319.6 | Cum | 12,000 ₹2.8 Cr | 11,940 ₹2.8 Cr | 12,200 ₹2.8 Cr | 12,100 ₹2.8 Cr |
Updated dates
Tender Value
₹34.4 Cr
EMD Value
₹50 L
Closing Date
16 Jan 2026, 12:00 pmClosed
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
WIDENING AND STRENGTHENING WORK OF BASTI MAHSO MAHULI ALINAGAR (STATE HIGHWAY 161) FROM CHAINAGE 27.000 TO 38.800 IN 2 LANES WITH PAVED SHOULDER UNDER DHANGHATA ASSEMBLY CONSTITUENCY OF SANT KABIR NAGAR (P.D.) DISTRICT (LENGTH 11.800 KM)
2025_CEUBZ_1103136_1
7481/4E-NIVIDA-BASTI CIRCLE/25-26 DATED-19-12-2025
Open Tender
Civil Works
365 days
BASTI
AS PER SBD
2 documents required · 2 mandatory
₹6,254
Yes
₹50 L
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
27 Feb 2026
1 Jan 2026
16 Jan 2026
1 Jan 2026
16 Jan 2026
1 Jan 2026
1 Jan 2026 - 7 Jan 2026
2 Jan 2026
Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres. .Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per MORTH Sr. No. 3.06 & Technical Specification Clause 301 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Construction of Embankment with Material Deposited from Roadway Cutting .Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted density not less than 97% of designed density of JMF to meet requirement of table 300-2.as per MORTH Sr. No. 3.017 & Technical Specification Clause 305 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Construction of Embankment with Material obtained from Borrowpits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting density not less than 97% of designed density of JMF to meet requirement of table 300-2.as per MORTH Sr. No. 3.16 & Technical Specification Clause 305 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P. (Carted Earth work in Abadi Portion upto Not Less then 2km)
Construction of Embankment with Material obtained from Borrowpits Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading with 2% lime, grading to required slope and compacted density not less than 97% of designed density of JMF to meet requirement of table No. 300-2 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Construction of granular sub-base (Grade-1) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 as per designed density of JMF per MORTH Sr. No. 4.01 & Technical Specification Clause 401 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical 100 tonne mix plant carriage of mixed Material by 10 cum capacity tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.complete as per MoRTH clause 406 With Design Job Mix formula Approved By Competent Authority complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, OPC of approved brand cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-35 over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing .with porper water curing as per MORTH Sr. No. 6.02 & Technical Specification Clause 402.With Design Job Mix Approved By Competent Authoritycomplete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Providing and laying dense graded bituminous macadam Grade-1 thickness 80mm with Bitumen VG-40 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. as per MORTH Sr. No. 5.4 With Design Job Mix Approved By Competent Authority complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Providing and applying Tack coat with bitumenVg10 emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.as per MORTH Sr. No. 5.02 & Technical Specification Clause 503 complete in all aspects.Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Providing and laying dense graded bituminous macadam-2 thickness 60mm with bitumen VG-40 with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. as per MORTH Sr. No. 5.4 With Design Job Mix Approved By Competent Authority complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Providing and applying Tack coat with bitumenVg10 emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.as per MORTH Sr. No. 5.02 & Technical Specification Clause 503 complete in all aspects.Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Providing and laying bituminous concrete Grade-II thinkess 40mm with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG 40 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects as per MORTH Sr. No. 5.05 & Technical Specification Clause 507 B With Design Job Mix Approved By Competent Authority complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted density not less than 97% of designed density of JMF to meet requirement of table No. 300-2 as per MORTH Sr. No. 3.18 & Technical Specification Clause 305 complete in all aspects. Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Earth work in excavation of foundation of structures Construction of Deep drain 500x500 m /Construction of Hume Pipe Culvert 900/600 mm Dia as per drawing and technical specification, including setting out construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. as per MORT&H specification clause No. 304 complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Concrete foundation in Construction of Deep drain 500x500 m /Construction of Hume Pipe Culvert 900/600 mmDia with 40mm gauge stone ballast with approve coarse sand and cement in proportion of 1:3:6 including all materials, Labour T & P etc As Per S.I No 280 work With Proper Curing complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Brick masonary work for Construction of Hume Pipe Culvert 900/600 mm Dia in 1:3 sub-structure complete excluding pointing and plastering as per drawing and technical specification. work With Proper Curing complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Reinforced cement concrete work for Construction of Deep drain 500x500 m in sub-structure complete as per drawing and Technical Specifications RCC Grade (M-20) as per MoRTH 13.05 (A) 1500,1700 & 2200 with curing complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Supplying, fitting and placing work for Construction of Deep drain 500x500 m with govt. Approved HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications with approved test report as per MoRTH 13.06 1600 & 2200 with curing complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Struck cement pointing on brick work for Construction of Hume Pipe Culvert 900/600 mm Dia with cement mortar consisting of 1 Part of cement and 2 parts of fine sand of 1.25 FM includingh Supply of all material, labour and T &P etc. work With Proper Curing complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Supply of NP - 3 Class 900 mm Dia RCC Hume pipe as per direction of Engineer in Charge. complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Supply of NP - 3 Class 600 mm Dia RCC Hume pipe as per direction of Engineer in Charge. complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Laying and jointing of R.C.C hume pipe dia 900mm with Cement morter 1:2 at ang giving proper slope & alignment as required for proper completion of work. complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Laying and jointing of R.C.C hume pipe dia 600mm with Cement morter 1:2 at ang giving proper slope & alignment as required for proper completion of work. complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
BRIDGE WORK Providing and Constructing Temporary Island 7 m diameter for Construction of Well Foundation for 4.50 m dia. Well including placing of cutting age under water portion providing 40 cm. above platform from water lavel and its protection by suitable mean and also making plateform for Machinaries including etc. reqd for proper completion of the work. and also including all type of taxes but excluding cess as per specification 12.9A (Morth Specification 1200) of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Providing and constructing one span service road to reach island location from one pier location to another pier location for span length 30 m, width of service road 10m and depth of water 1m including cost of material, all labour, T&P etc required for proper completion of the work as per E./I. and also including all type of taxes but excluding cess (12.9C) of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification and including cost of material, all labour, T&P etc required for proper completion of the work as per E./I. and also including all type of taxes but excluding cess (12.10 ) of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, clayed soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 16.00 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (12.12A+12.12B) (i) Up to 3.0m depth below bed level of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, clayed soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 16.00 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (12.12A+12.12B) (ii) From depth of 3.0m to 10.0m below bed level of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Sinking of 4.50 m external diameter well (other than pneumatic method of sinking) through all type of Strata namely sandy Soil, clayed soil as shown againts each case complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level upto 16.00 m depth including required all machinary, other devices, all labour, T&P etc reqd. for proper completion of the work.. and also including all type of taxes but excluding cess (12.12A+12.12B) (iii) From depth of 10.0m to 16.10m below bed level of the work with proper curing as per Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Reinforced Cement Concrete, in Well curb /Bottom Plug of M25 Grade complete as per Drawing and Technical Specification. including cost of grit, coarse sand from approved quarry, all labour, T&P etc reqd. for proper completion of the work..and also including all type of taxes but excluding cess (12.11A) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Reinforced Cement Concrete, in Well steining /Well cap /ub structure Abutment/Pier shaft and Cap /dirt wall hanging wall and haunches of M30 Grade complete as per Drawing and Technical Specification. including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess .(12.11B) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Plain Cement Concrete, in Intermediate Plug /Top Plug PCC Grade M15 complete including cost grit and coarse sand from Dala quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specification. (12.11D) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Sand Filling in Wells complete including cost Sand from approved quarry all labour, T&P etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess as per Drawing and Technical Specifications. 12.21 of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation including cost Steel etc reqd. for proper completion of the work, and also including all type of taxes but excluding cesscomplete as per Drawing and Technical Specifications. (14.2) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Back filling with Granular Material behind abutment, wing wall and return wall complete as per drawing and Technical Specification of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Furnishing and Placing Reinforced cement concrete in super structure (slab /Kerb) /R.C.C. railing /approach slab /wearing coat of RCC Grade M35 including cost of grit, Sand from approved Quarry all material etc reqd. for proper completion of the work, and also including all type of taxes but excluding cess complete as per drawing and Technical Specification (14.1C) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Drainage Spouts complete and also including all type of taxes but excluding cess as per drawing and Technical specification(14.9) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer /supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and also including all type of taxes but excluding cess complete (14.22) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Providing and Fixing of Neoporin alosmatric bearing including its fixing as per drawing and technical specification as directed by engineer-incharge required for proper completion of the work. of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.43 ltr/ 10 sqm. over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sum).As per SL No 28 CPWD No 13.47.1 for railing of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Protection Work Construction of embankment with approved material obtained borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 as per technical specification clause 301.5 of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Excavation in foundation in ordinary (loam clay or sand including lift upto 1.50m and lead upto 30.0m and including filling watering and ramming excavated earth into the space between the building nd sides of foundation chetion trenches or plinth and removal and disposal of surplus earth up to distance of 30m from the foundation trenches inluding all T&P all complete as directed by Engineer-in-charge (MORD 11.1) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Providing and Laying of stone boulders in Apron/Toe wall and packed) and Top finished to grade required including cost of all material labour and T&P atc. Required for proper completion oif the work. of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Providing and Laying of over burnt Brick ballast dully consolidated by hand remmers including leveling, dressing surface including all labour and T&P atc. Required for proper completion oif the work. of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Providing and Laying of stone boulders slope pitching including cost of all material labour and T&P atc. Required for proper completion oif the work. of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Construction of KC Drain of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Construction of Chute Drain of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Dismantling Work Dismantling of brick work including stacking of material as directed by the Engineer in charge within a distance of 60 m(200 ft.) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Dismantling rainforced cement concrete or reinforced brick work including stacking of dismantled material as directed by the Engineer in charge within a distance of 60 m(200 ft.) of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Dewatering with pumping set including etc all completion. of the work with proper curing Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Construction of Diversion Earthwork in embankment for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.( 30 Mt Lead and 150 M Lift) S.I. No 251 Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Laying brick soling on prepared sub-grade with brick on end edging according to lines,graded and cross-section shown on the drawing filling joints with sand and earth,spreading 25 mm thick layer of earth over brick soling,watering and rolling.Technical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Providing and laying of 1200 mm dia Hume PipeTechnical Specification Complete in all aspects or as per direction of E/I (Rates are Excluding G.S.T but Including All Taxes Royalty, Labour cess, Material & T&P).
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Executing work of Maintenance Cost [email protected]%including complete in all aspects Excluding G.S.T but Including All Taxes Labour Cess, Royalty, Labour, Material & T&P.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
SBD.pdf
Tender Documents • 2.95 MB
BOQ_2034245.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid