Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹19.9 L+₹2.4 L (13.8%)Accepted-Finance | L2 | Accepted-Finance Accepted |
Tender Value
Refer Docs
EMD Value
₹15,900
Closing Date
12 Feb 2024, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AMC 24 25 BM Dn Unit I II III ESP Attending breakdown works in ESP for a period of one year from 01 04 2024 to 31 03 2025 or completion of quantity whichever comes earlier from the date of taken over of site
2024_EB_408941_1
CE SE MI NCTPS I 209 23 24
Open Tender
Power/Energy Projects/Products
Works
365 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,900
Yes
15 Mar 2024
12 Jan 2024
13 Feb 2024
12 Jan 2024
12 Feb 2024
12 Jan 2024
Amount
Rectification of field short: Work involves opening of inspection doors, through inspection of field collecting and emitting electrodes. Renewal of emitting electrodes and aligning gap between collecting electrode by U guide welding / plate bend removing. Opening of hopper doors for removing ash. Test charge for field normalizing to the satisfactory operation. Including consumables and T&P’s.
Manual opening and closing of Guillotine gates of ESP inlet and outlet. The work involves arrangement of tools and plants for closing electrically inoperative gate manually to isolate the pass to facilitate to attend the field short. Opening and normalising after completion of work. Including consumable and T&P’s.
Upkeepment of equipments and area, attending minor oil and ash leaks in all the fans and ESP area. Including consumables and T&P’s.
Disconnecting and removal of defective CERM Gear box from its position at 15 Mtrs height and removal of coupling. Fixing of coupling in the spare gear box lifting positioning, fixing in its position and normalising for smooth operation. Including drawl, devolution, consumables and T&P’s etc.(Required material will be supplied by TANGEDCO)
Disconnecting and removal of defective EERM Gear box from its position at 32Mtr height and removal of coupling. Fixing of coupling in the spare gear box lifting positioning, fixing in its position and normalising for smooth operation. Including drawl, devolution, consumables and T&P’s etc.(Required material will be supplied by TANGEDCO)
Welding of eroded welding joints in structures inside the ESP. Works involves inspection of welding joints in collecting & emitting electrode structures, ESP inside casing, welding of eroded weakened joints (metal filling by welding).Including consumables and T&P’s.
Complete cleaning of flue gas duct, SA & PA delivery duct and hot air ducts completely. Including consumables and T&P’s.
Tightening of bolts and nuts of rapping mechanism inner arm, outer arm and tack welding. Including cost of consumables and T&P's.
LOKESH ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .