Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.8 LAccepted-Finance | L1 | Accepted-Finance Lowest Bid Amount | |
| 2 | L2₹39.9 L+₹6.1 L (18.1%)Rejected-Finance | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹41.6 L+₹7.9 L (23.3%)Rejected-Finance | L3 | Rejected-Finance Not L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical Technical Bid is not found ok |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
21 May 2024, 2:00 pmClosed
SE, EDC-II, Mathura
Near Kali Mata Mandir, Cant, Mathura
33 KV Substations/line erection/strengthening works under business plan 2024-25 in the area of EDC II, Mathura on semi turnkey basis
2024_DVVNL_922131_4
99/EDC-II(M)/2023-24
Open Tender
Electrical Works
Turn-key
90 days
Mathura
Please see tender documents
2 documents required · 2 mandatory
₹4,720
DVVNL, Agra
₹40,000
22 Jun 2024
16 May 2024
21 May 2024
16 May 2024
21 May 2024
16 May 2024
Amount
Supply of following material against various proposed works as per RESPO Drawings/approved GTP/standard technical specifications
Control Cable 4*2.5 Sqmm.
Control Cable 2*2.5 Sqmm.
33 KV Vaccum Interrupter
33 KV Breaker amp Meter
33 KV Breaker Volt Meter
33 KV Triping Coil
33 KV Fuse Set
33 KV PG Clamp
Stone Pad
"F" Bracket
Holding Clamp for above (Cross arm & "F" Bracket)
Pole Earthing set Complete
M.S. Nut, Bolt and Washer's
Gurading Angle
I Bolt 12x15 mm
Aluminium Binding wire
G.I. Wire 6 & 10 Swg
PP and Clamp with nut and bolt
Fixing, erection and commissioning work of following material for installation / augmentation of Power Transformers/strengthening or erection of 33 kv line / 33 kv S.S. protection as per RESPO Drawings/Estimates. Work includes all cartage/carriage, T&P, and any other work which is required for completion of above said work as per satisfaction of supervisory engineer.
PT 33 KV/110V
Control Cable 4*2.5 Sqmm.
Control Cable 2*2.5 Sqmm.
33 kv Control Pannel For double T/F
33 KV Vaccum Circuit Breaker 1250 amp
33 KV Control Pannel Relay
33 KV Vaccum Interrupter
33 KV Breaker amp Meter
33 KV Breaker Volt Meter
33 KV Triping Coil
33 KV Bus Isolator with structure
33 KV Pin Insulator With GI Pin
33 KV Post Insulator
33 KV Lightening Arrestor
33 KV Fuse Set
ACSR Dog Conductor
33 KV PG Clamp
STP-70 11 Mtr. Long.
Stone Pad
M.S. Cross Arm "V" Type
"F" Bracket
Holding Clamp for above (Cross arm & "F" Bracket)
Pole Earthing set Complete
M.S. Nut, Bolt and Washer's
Gurading Angle
I Bolt 12x15 mm
Aluminium Binding wire
G.I. Wire 6 & 10 Swg
PP and Clamp with nut and bolt
33/11 KV Transformer 10 MVA
completion of following work with all material, cartage/carriage, T&P, and any other required work for installation / augmentation of Power Transformers/strengthening or erection of 33 kv line / 33 kv S.S. protection, as per RESPO Drawings/standard specifications/Estimates/as per satisfaction of supervisory engineer.
Steel Structures with paintnig etc. complete
Plinth & Foundation of VCB
Earthing Complete (Chemical Type)
Over Hauling of 33 KV Out Door Breaker
Sundary expenses
Concreting of Poles
33 kv Guarding per Span up to 50 Mtr.
Dismantling Charges for old Dog Conductor
Reasgging of old and constructed Line
M/s Shri Balaji Traders
M/S S.P. & CO
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .