Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.9 LAdmitted-Finance | ₹35.9 L | L1 | Admitted-Finance |
| 2 | L2₹38.5 LAdmitted-Finance | ₹38.5 L | L2 | Admitted-Finance |
| 3 | L3₹39.9 LAdmitted-Finance | ₹39.9 L | L3 | Admitted-Finance |
| 4 | L4₹40 LAdmitted-Finance | ₹40 L | L4 | Admitted-Finance |
| 5 | L5₹41.8 LAdmitted-Finance | ₹41.8 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S GHULAM MOHAMMAD AND CO. L6 | M/S SA INFRATECH L1 | M/S MAHIR MUNEER L3 | M/S FAROOQ AND SONS L5 | M/S GHULAM HASSAN AND SONS L2 | MEGA CONCRETE CONSTRUCTION ENGINEERS AND CONTRACTORS L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Sch 'A' Part-I (Building Works)
Construction of office accn with sanitation ancillaries with permanent specification all as per drawing and directed by Engineer-in-Charge
Note: Not Prepriced at par with SSR Part-II (2020) at Serial Page No 20 and contractor has to quote the estimated amount under Col 6 | 1 | Lumpsum | 36,00,000 ₹36,00,000 | 27,77,511 ₹27,77,511 | 18,00,000 ₹18,00,000 | 31,50,000 ₹31,50,000 | 27,50,000 ₹27,50,000 | 30,00,000 ₹30,00,000 |
| 2.00 | Sch 'A' Part-II (Sec-I) (Internal Water Supply Works)
Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 22 and contractor has to quote the estimated amount under Col 06 | 1 | Lumpsum | 15,000 ₹15,000 | 14,700 ₹14,700 | 45,000 ₹45,000 | 18,000 ₹18,000 | 19,100 ₹19,100 | 20,000 ₹20,000 |
| 3.00 | Sch 'A' Part-III ( Plumbing Works)
Note:- Prepriced at par with SSR Part-II (2020) at Serial Page No 24 and contractor has to quote the estimated amount under Col 06 | 1 | Lumpsum | 7,000 ₹7,000 | 6,451 ₹6,451 | 20,000 ₹20,000 | 9,000 ₹9,000 | 9,200 ₹9,200 | 15,000 ₹15,000 |
| 4.00 | Sch 'A' Part-IV, Sec-I (Internal Electrification Works)
Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 30 and contractor has to quote the estimated amount under Col 6 | 1 | Lumpsum | 2,00,000 ₹2,00,000 | 1,97,511 ₹1,97,511 | 5,00,000 ₹5,00,000 | 1,85,000 ₹1,85,000 | 2,60,000 ₹2,60,000 | 2,54,934 ₹2,54,934 |
| 5.00Sch 'A' Part-IV Sec-II (Internal Electrification Works) Note:- This schedule is not pre priced by MES and the pre priced rate indicated as "Rs.0.00" under Col 5 signifies this fact only. | |||||||||
| 5.01 | S&F Led 40W, 2 feet x 2 feet Backlit Panel Cool White Light (6500K) Recessed Panel for False-Ceiling Aluminium Housing for Efficient Performance . | 10 | Each | 2,500 ₹25,000 | 195 ₹1,950 | 2,000 ₹20,000 | 3,000 ₹30,000 | 1,910 ₹19,100 | 2,500 ₹25,000 |
| 6.00 | Sch 'A' Part-V, (Road, Path & Culvert Works)
Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 30 and contractor has to quote the estimated amount under Col 7 | 1 | Lumpsum | 1,50,000 ₹1,50,000 | 1,42,511 ₹1,42,511 | 4,00,000 ₹4,00,000 | 1,55,000 ₹1,55,000 | 1,80,000 ₹1,80,000 | 1,70,000 ₹1,70,000 |
| 7.00 | Sch 'A' Part-VI, Sec-I (Sewage Works)
Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 34 and contractor has to quote the estimated amount under Col 7 | 1 | Lumpsum | 40,000 ₹40,000 | 41,311 ₹41,311 | 1,00,000 ₹1,00,000 | 37,000 ₹37,000 | 47,000 ₹47,000 | 49,600 ₹49,600 |
| 8.00Sch 'A' Part-VI, Sec-II (Sewage Works) Note:- This schedule is not pre priced by MES and the pre priced rate indicated as "Rs.0.00" under Col 5 signifies this fact only.ly. | |||||||||
| 8.01 | M&L for septic tank for (50 users) in any type of soil, size 4.00 m length, 1.40 m breath, 1.60 m depth single chamber with thickness of slab 100 mm and RCC baffle wall of thickness 80 mm complete all as per detail of reinforcement and drawing as mentioned in TD-CE/AF/STD-15/2000, sheet Np 1/2 and 2/2 dated 05 Jan 2000, with doundation in PCC 1:2:4, brickwork and plaster in CM 1:4 with using sub class ‘B’ old size brick, RCC slab covers including RCC precast manhole cover having 6 mm plate embedded all around/fibre reinforced cover with angle iron frame vent shaft and sludge chambers etc complete all as specified and directed | 1 | Each | 60,000 ₹60,000 | 62,511 ₹62,511 | 2,00,000 ₹2,00,000 | 95,000 ₹95,000 | 65,000 ₹65,000 | 40,000 ₹40,000 |
Tender Value
₹42.3 L
EMD Value
₹84,700
Closing Date
20 Jun 2026, 6:00 pmClosed
CWE AF SRINAGAR
CWE AF SRINAGAR
CONSTRUCTION OF CERTAIN INFRASTRUCTURE FOR CLOSE IN WEAPON SYSTEM AT 1 WG
2026_MES_758629_1
CWE(AF)SGR/SGR-65/2025-26
Open Tender
Civil Works
180 days
GE AF srinagar
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE AF SRINAGAR
₹84,700
Yes
3 Jul 2026
30 Mar 2026
27 Jun 2026
30 Mar 2026
20 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Sch 'A' Part-I (Building Works)
Construction of office accn with sanitation ancillaries with permanent specification all as per drawing and directed by Engineer-in-Charge
Note: Not Prepriced at par with SSR Part-II (2020) at Serial Page No 20 and contractor has to quote the estimated amount under Col 6 | - | Lumpsum | - | - |
| - | Sch 'A' Part-II (Sec-I) (Internal Water Supply Works)
Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 22 and contractor has to quote the estimated amount under Col 6 | - | Lumpsum | 21,125.76 | - |
| - | Sch 'A' Part-III ( Plumbing Works)
Note:- Prepriced at par with SSR Part-II (2020) at Serial Page No 22 and contractor has to quote the estimated amount under Col 6 | - | Lumpsum | - | - |
| - | Sch 'A' Part-IV, Sec-I (Internal Electrification Works)
Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 34 and contractor has to quote the estimated amount under Col 6 | - | Lumpsum | - | - |
| - | Sch 'A' Part-IV Sec-II (Internal Electrification Works)
Note:- This schedule is not pre priced by MES and the pre priced rate indicated as "Rs.0.00" under Col 5 signifies this fact only. | - | - | - | - |
| - | S&F Led 40W, 2 feet x 2 feet Backlit Panel Cool White Light (6500K) Recessed Panel for False-Ceiling Aluminium Housing for Efficient Performance . | - | Each | - | - |
| - | Sch 'A' Part-V, (Road, Path & Culvert Works)
Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 24 and contractor has to quote the estimated amount under Col 6 | - | Lumpsum | 2,14,917.63 | - |
| - | Sch 'A' Part-VI, Sec-I (Sewage Works)
Note: Prepriced at par with SSR Part-II (2020) at Serial Page No 25 and contractor has to quote the estimated amount under Col 6 | - | Lumpsum | 61,779.15 | - |
| - | Sch 'A' Part-VI, Sec-II (Sewage Works)
Note:- This schedule is not pre priced by MES and the pre priced rate indicated as "Rs.0.00" under Col 5 signifies this fact only.ly. | - | - | - | - |
| - | M&L for septic tank for (50 users) in any type of soil, size 4.00 m length, 1.40 m breath, 1.60 m depth single chamber with thickness of slab 100 mm and RCC baffle wall of thickness 80 mm complete all as per detail of reinforcement and drawing as mentioned in TD-CE/AF/STD-15/2000, sheet Np 1/2 and 2/2 dated 05 Jan 2000, with doundation in PCC 1:2:4, brickwork and plaster in CM 1:4 with using sub class ‘B’ old size brick, RCC slab covers including RCC precast manhole cover having 6 mm plate embedded all around/fibre reinforced cover with angle iron frame vent shaft and sludge chambers etc complete all as specified and directed | - | Each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
TENDER65.pdf
Tender Documents • 1.54 MB
BOQ_849719.xls
BOQ • 0.32 MB
drgcorri07.pdf
PDF • 10.86 MB
corrigendum06new.pdf
PDF • 0.34 MB
corrigendum04.pdf
PDF • 0.34 MB
CA65Corrigendum03.pdf
PDF • 1.18 MB
CA65Corrigendum2.pdf
PDF • 0.93 MB
Corrigendum01.pdf
PDF • 0.96 MB
Download all tender documents and submit your bid