Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.9 LAccepted-AOC SAGAR COLONY STATION ROAD PO DISTRICT BALANGIR ODISHA | BALANGIR | BALANGIR | ODISHA | ₹22.9 L | L1 | Accepted-AOC Agreement drawn and Work Order issued on 09.03.2026 |
| 2 | L2₹22.9 LSame as L1Rejected-Finance AT PO SALANDI BELPARA DIST BALANGIR ODISHA PIN 76702 | 76702 | ₹22.9 LSame as L1 | L2 | Rejected-Finance Stand L2 in transparent lottery |
| 3 | L2₹22.9 LSame as L1Rejected-Finance ADARSA PADA BALANGIR BALANGIR ODISHA PIN 767001 | BALANGIR | ODISHA | 767001 | ₹22.9 LSame as L1 | L2 | Rejected-Finance Stand L2 in transparent lottery |
| 4 | L2₹22.9 LSame as L1Rejected-Finance AT MALPADA PO PS DIST BALANGIR 767001 | BALANGIR | BALANGIR | ODISHA | 767001 | ₹22.9 LSame as L1 | L2 | Rejected-Finance Stand L2 in transparent lottery |
| 5 | L2₹22.9 LSame as L1Rejected-Finance AT SRIKANTAPUR RANIPATNA DIST BALESHWAR PIN 756001 | BALESHWAR | ODISHA | 756001 | ₹22.9 LSame as L1 | L2 | Rejected-Finance Stand L2 in transparent lottery |
Tender Value
₹27.0 L
EMD Value
₹27,000
Closing Date
8 Jan 2026, 5:00 pmClosed
Superintending Engineer Kantabanji (RandB) Divn.
O/O the Superintending Engineer Kantabanji (RandB) Division
Shifting of HT and LT line for Improvement such as Widening and Strengthening of Patnagarh to Tikrapada Road from Village-Ghumapali to Bagalbandh main Road under ESO No.2, Patnagarh
2025_EICCL_123947_2
13/KBJ/2025-26
National Competitive Bid
Electrical Works
Percentage
60 days
KANTABANJI
Please refer tender documents
3 documents required · 3 mandatory
₹6,000
₹27,000
Yes
24 Mar 2026
2 Jan 2026
9 Jan 2026
2 Jan 2026
8 Jan 2026
2 Jan 2026
2 Jan 2026 - 5 Jan 2026
COST OF OTHER MATERIALS FOR LINE AND SUB-STATION:- Cost of 11 KV line with 55 mm2 AAAC including 1% Labour Cess, T&P @2%, Transportation @7.5% & Erection charges @10%.
Cost of Analysis of Cradle Guard including 1% Labour Cess, T&P @2%, Transportation @7.5% & Erection charges @10%.
Cost of common materials for 11 KV SP pin Point with 11mtr long RSJ GI Pole (Excluding Pole and Civil work cost) including 1% Labour Cess, T&P @2%, Transportation @7.5% & Erection charges @10%.
Cost of common materials for 11 KV SP Cut Point with 11mtr long RSJ GI Pole (Excluding Pole and Civil work cost) including 1% Labour Cess, T&P @2%, Transportation @7.5% & Erection charges @10%.
Construction of 3-Ph 95 mm2 (5 wire) AB Cable on 9 mtr. X 300 Kg. PSC Pole for LT Line (30 mtr span) (Excluding pole) including 1% Labour Cess, T&P @2%, Transportation @7.5% & Erection charges @10%.
COST OF TRANSFORMER/BREAKER/JOIST POLE:- Support of 11 mtr long 150 x 150 mm Joist GI Pole as per TPWODL norms including 1% Labour Cess, T&P @2%, Transportation @7.5% & Erection charges @5%.
COST OF PSC POLE:- Cost of 9 mtr. Long 300 Kg. PSC Pole for HT line + S/S + others including 1% Labour Cess, T&P @2%, Transportation @7.5% & Erection charges @20%.
Concreting ratio 1:1, 5:3 (M-20 grade) 500mm x 500mm x 180mm = 0.45 Cum (Per Pole) including 1% Labour Cess
Couping ratio 1:1, 5:3 (M-20 grade) with dimension 500mm x 500mm x 450mm = 0.1125 Cum (Per Pole) including 1% Labour Cess
Stay concreting ratio 1:1, 5:3 (M-20 grade) with dimension 500mm x 500mm x 800mm = 0.2 Cum (Per Stay) including 1% Labour Cess
Inspection fee for 11 KV line
Drawing Approval
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_573613.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
DTCNPT.pdf
Tender Documents • 1.29 MB
BOQ_573613.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .