| 1 | L1₹24.5 LAccepted-Finance | L1 | Accepted-Finance lowest price | |
| 2 | Rejected-Technical | - | Rejected-Technical technically not qualified |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
4 Dec 2023, 3:00 pmClosed
Executive officer
zaminuthukuli town panchayat
Providing BT to the road with Protection wall at Ward No.4,Kannappan Nagar Road in Zaminuthukuli Town Panchayat.
2023_DTP_395588_1
44/2023
Open Tender
Civil Works
Works
90 days
zaminuthukuli town panchayat
as per norms
2 documents required · 2 mandatory
₹0
₹30,000
15 Jul 2024
2 Dec 2023
4 Dec 2023
2 Dec 2023
4 Dec 2023
2 Dec 2023
2 Dec 2023 - 4 Dec 2023
Amount
Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Collection, Supply and filling of well gravel including cost and conveyance of gravel to work site and all labour charges for stacking them to departmental gauge at road sides for premeasurement by the departmental officers and spreading and compacting in layers as directed by the dept officers. As per clause 301 & 305 of MORTH Specification.
Providing, Laying, Spreading and compacting graded stone aggregate to Granual Sub Base including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers MOST 406
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 200 mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers MOST 406
Providing and laying Priming coat 7Kg / 10 Sq.m over WMM surface using of Emulsion Bitumen SS1 for 10 Sq.m and cost Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cast as per special condition appended including labour charges for preparing the surface for laying the Prime coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed etc., complete.
Providing and laying Tack coat 2.50 Kg / 10 Sq.m over Wet Mix Mecadam surface using of R.S Emulsion Bitumen for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bituminous by mechanical sprayer including hire and fuel for all tools and plants employed etc., complete as per MORTH Specifications 111,112,501,503 and 900.
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.02 kg shredded plastic wast for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.02 kg shredded plastic wast for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providind and laying Hot Applied Thermoplastic compound 2.50mm thick including reflectorising glass beadsas per IRC :35, The finshed surface to be level,uniform and free from streaks and holes including all charges etc, complete
Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Cement concrete Using 1:4:8 mix ( One cement , four sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications.as per TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. as per TNDSS NO: 30&86 sides
Cement concrete Using 1:3:6 mix ( One cement ,three sand and Six aggregates) using 20 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications.as per TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Removal of excavated earth to conveyance from work site including loading unloading and transporting charges to 2 Km lead including all other incidential charges etc.complete
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .