Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.8 LAccepted-Finance | ₹35.8 L | L1 | Accepted-Finance Being lowest |
| 2 | L2₹39.6 L+₹3.9 L (10.8%)Accepted-Finance RZ D 29A GALI NO 05 SYNDICATE ENCLAVE NEAR DABRI MORE NEW DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | ₹39.6 L+₹3.9 L (10.8%) | L2 | Accepted-Finance Not being lowest |
| 3 | L3₹42.3 L+₹6.6 L (18.4%)Accepted-Finance A 47D RAM DUTT ENCLAVE UTTAM NAGAR NEW DELHI 110059 | WEST | DELHI | 110059 | ₹42.3 L+₹6.6 L (18.4%) | L3 | Accepted-Finance Not being lowest |
| 4 | L4₹43.6 L+₹7.8 L (21.9%)Accepted-Finance 137 3 STREET NO 4 RAJINDER NAGAR DEHRADUN UK 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹43.6 L+₹7.8 L (21.9%) | L4 | Accepted-Finance Not being lowest |
| 5 | L5₹43.9 L+₹8.2 L (22.9%)Accepted-Finance | ₹43.9 L+₹8.2 L (22.9%) | L5 | Accepted-Finance Not being lowest |
| Sl No | Description | Qty | Unit | HANUMAN BUILDERS L6 | SHREE RAM BUILD TECH L2 | Akhil Enterprises L3 | M/S ANIL KUMAR L4 | M/S MANINDER CONSTRUCTION CO. L1 | DEEP BUILDER L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Disconnecting existing 500/1000 ltr tanks, setting a side (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position including all necessary fitting and fixtures like tank nipple,etc complete all as specified and directed. | 8 | Each | 200 ₹1,600 | 100 ₹800 | 177 ₹1,416 | 79 ₹632 Lowest | 200 ₹1,600 | 300 ₹2,400 |
| 2.00 | M&L for cement concrete 1:2:4 type B1 (using 12.5mm graded stone aggregate) on roof padding surface finished even and smooth without using extra cement complete all as spd & directed. | 72.95 | Cum | 2,750 ₹2,00,612.5 | 4,990 ₹3,64,020.5 | 3,277 ₹2,39,057.15 | 3,999 ₹2,91,727.05 | 1,940 ₹1,41,523 Lowest | 4,000 ₹2,91,800 |
| 3.00 | M&L providing and applying the plaster with single component ready to use repair mortar (SMART CARE REPAIR MORTAR or equivalent) capable of applying 15mm average thickness in single layer and finishing with trowel with a bond coat: SBR polymer (@ 10% of cement weight) modified cementious bond coat @ 2.2 kg cement/Sqm of surface area mixed with specified portion of AP SMARTCARE or equivalent Repair Polymer including taking down existing roof treatment of any type and also taking down cement plaster on brick/concrete surfaces, including raking out joints, hacking for key, scrubbing down with water etc., to receive further treatment, complete all as specified land as directed.
Note: The application shall be executed on any type of surface and on horizontal/Vertical areas. | 1,459 | Sqm | 480 ₹7,00,320 | 195 ₹2,84,505 | 177 ₹2,58,243 | 109 ₹1,59,031 Lowest | 500 ₹7,29,500 | 250 ₹3,64,750 |
| 4.00 | M&L providing and applying Smartcare Dampproof, a fibre reinforced elastomeric liquid water proofing membrane formulated with reinforcing acrylic fibers having Sun Reflectivity Index (SRI) of 105 on horizontal/vertical surfaces of roof/wall/chajas in multiple coats @2.0 litre/sqm. Primary [coat is self-priming coat of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1, damp proof : water) and other coats to be applied undiluted. The coating needs to be reinforced with 40 GSM geotextile/fibre, to sandwiched between 2nd & 3rd coat of coating. The application shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes complete in all respect as per the direction of Engineer-in-Charge.
Make: SmartCare Damp Proof of Asian Paints or equivalent in Berger/ Nerolac/STP Ltd.
Notes: (1) The work shall be executed through authorised applicator of manufacturer only.
(2) Authrised Applicator shall be approved by GE before starting of work.
(3) All materials shall be procured directly form manufacturer. The purchase voucher shall be produced to the Engineer-in-Charge for his verification of material.
Engineer-in-Charge shall deface the original purchase vouchers.
(4) Guarantee: The contractor shall furnish a written guarantee for the effectiveness of the water proofing treatment for a period of Eight years in favour of the GE. A sum equivalent to 2.5% (Two point Five Percent) of the cost of water proofing treatment shall be retained by the Govt from the contractor's dues as security deposit. The contractor may, however, furnish a fixed deposit receipt in lieu from a Schedule bank pledged in favour of Garrison Engineer. | 1,459 | Sqm | 760 ₹11,08,840 | 365 ₹5,32,535 | 547 ₹7,98,073 | 491 ₹7,16,369 | 100 ₹1,45,900 Lowest | 530 ₹7,73,270 |
| 5.00 | Demolition Bricks (laid flat or on edge) or brick tiles in floors, roof, channels, kerbs, aprons, etc. (each layer all as specified and directed. | 1,459 | Sqm | 20 ₹29,180 | 20 ₹29,180 | 27 ₹39,393 | 9 ₹13,131 | 5 ₹7,295 Lowest | 20 ₹29,180 |
| 6.00 | Demolition Mud in roofs, any thickness including removal exc 1000m outside def land all as specified and directed. | 218.85 | Cum | 200 ₹43,770 | 190 ₹41,581.5 | 117 ₹25,605.45 Lowest | 159 ₹34,797.15 | 280 ₹61,278 | 500 ₹1,09,425 |
| 7.00 | M&L for rotational moulded polyethylene water storage tanks white colour 500 lts capacity, triple layered (cylindrical vertical with closed top) hoisted and fixed in position including 20 mm dia PTMT float valve, lid tank cover for polyethelene and polyethylene ball including taking out existing unserviceable overhead tank of any description including fitting and fixtures complete all as specified. (Make : Syntex/Polywell) (ISI Marked) | 4 | Each | 3,200 ₹12,800 | 3,250 ₹13,000 | 3,777 ₹15,108 | 2,999 ₹11,996 Lowest | 3,500 ₹14,000 | 3,800 ₹15,200 |
| 8.00 | M and L for rotational moulded polyethylene water storage tanks 1000 lts capacity, double layered (cylindrical vertical with closed top) hoisted and nipple fixed in position, with 20 mm dia brass float valve and polyethylene ball including taking out existing unserviceable overhead tank of any description | 2 | Each | 6,200 ₹12,400 Lowest | 6,500 ₹13,000 | 7,777 ₹15,554 | 6,999 ₹13,998 | 7,000.7 ₹14,001.4 | 7,000 ₹14,000 |
| 9.00 | S/F in repair PVC pipes, single socketed, in any length with rubber ring joints, laid in trenches or in floors or wall 110mm bore complete including required elbow,T,etc as required. | 50 | RM | 200 ₹10,000 | 210 ₹10,500 | 217 ₹10,850 | 419 ₹20,950 | 280 ₹14,000 | 120 ₹6,000 Lowest |
| 10.00 | Surface excavation n. exc (not exceeding) 30cm deep and averaging 15cm deep and geeting out hard/dence soil | 100 | Sqm | 40 ₹4,000 | 14 ₹1,400 | 77 ₹7,700 | 39 ₹3,900 | 10 ₹1,000 Lowest | 40 ₹4,000 |
Tender Value
₹46.0 L
EMD Value
₹92,080
Closing Date
24 Aug 2026, 6:00 pmClosed
LT COL MANISH E WASNIK
GE (CENTRAL) DELHI CANTT-10
8826/TOKEN-50/2026-27
2026_MES_781111_1
GE/TOKEN-50/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE (CENTRAL) DELHI CANTT-10
AS PER NIT
9 documents required · 9 mandatory
₹500
Yes
GE (CENTRAL) DELHI CANTT-10
₹92,080
Yes
1 Sept 2026
27 Jul 2026
26 Aug 2026
27 Jul 2026
24 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disconnecting existing 500/1000 ltr tanks, setting a side (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position including all necessary fitting and fixtures like tank nipple,etc complete all as specified and directed. | 8 | Each | - | - |
| 2 | M&L for cement concrete 1:2:4 type B1 (using 12.5mm graded stone aggregate) on roof padding surface finished even and smooth without using extra cement complete all as spd & directed. | 72.95 | Cum | - | - |
| 3 | M&L providing and applying the plaster with single component ready to use repair mortar (SMART CARE REPAIR MORTAR or equivalent) capable of applying 15mm average thickness in single layer and finishing with trowel with a bond coat: SBR polymer (@ 10% of cement weight) modified cementious bond coat @ 2.2 kg cement/Sqm of surface area mixed with specified portion of AP SMARTCARE or equivalent Repair Polymer including taking down existing roof treatment of any type and also taking down cement plaster on brick/concrete surfaces, including raking out joints, hacking for key, scrubbing down with water etc., to receive further treatment, complete all as specified land as directed.
Note: The application shall be executed on any type of surface and on horizontal/Vertical areas. | 1,459 | Sqm | - | - |
| 4 | M&L providing and applying Smartcare Dampproof, a fibre reinforced elastomeric liquid water proofing membrane formulated with reinforcing acrylic fibers having Sun Reflectivity Index (SRI) of 105 on horizontal/vertical surfaces of roof/wall/chajas in multiple coats @2.0 litre/sqm. Primary [coat is self-priming coat of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1, damp proof : water) and other coats to be applied undiluted. The coating needs to be reinforced with 40 GSM geotextile/fibre, to sandwiched between 2nd & 3rd coat of coating. The application shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes complete in all respect as per the direction of Engineer-in-Charge.
Make: SmartCare Damp Proof of Asian Paints or equivalent in Berger/ Nerolac/STP Ltd.
Notes: (1) The work shall be executed through authorised applicator of manufacturer only.
(2) Authrised Applicator shall be approved by GE before starting of work.
(3) All materials shall be procured directly form manufacturer. The purchase voucher shall be produced to the Engineer-in-Charge for his verification of material.
Engineer-in-Charge shall deface the original purchase vouchers.
(4) Guarantee: The contractor shall furnish a written guarantee for the effectiveness of the water proofing treatment for a period of Eight years in favour of the GE. A sum equivalent to 2.5% (Two point Five Percent) of the cost of water proofing treatment shall be retained by the Govt from the contractor's dues as security deposit. The contractor may, however, furnish a fixed deposit receipt in lieu from a Schedule bank pledged in favour of Garrison Engineer. | 1,459 | Sqm | - | - |
| 5 | Demolition Bricks (laid flat or on edge) or brick tiles in floors, roof, channels, kerbs, aprons, etc. (each layer all as specified and directed. | 1,459 | Sqm | - | - |
| 6 | Demolition Mud in roofs, any thickness including removal exc 1000m outside def land all as specified and directed. | 218.85 | Cum | - | - |
| 7 | M&L for rotational moulded polyethylene water storage tanks white colour 500 lts capacity, triple layered (cylindrical vertical with closed top) hoisted and fixed in position including 20 mm dia PTMT float valve, lid tank cover for polyethelene and polyethylene ball including taking out existing unserviceable overhead tank of any description including fitting and fixtures complete all as specified. (Make : Syntex/Polywell) (ISI Marked) | 4 | Each | - | - |
| 8 | M and L for rotational moulded polyethylene water storage tanks 1000 lts capacity, double layered (cylindrical vertical with closed top) hoisted and nipple fixed in position, with 20 mm dia brass float valve and polyethylene ball including taking out existing unserviceable overhead tank of any description | 2 | Each | - | - |
| 9 | S/F in repair PVC pipes, single socketed, in any length with rubber ring joints, laid in trenches or in floors or wall 110mm bore complete including required elbow,T,etc as required. | 50 | RM | - | - |
| 10 | Surface excavation n. exc (not exceeding) 30cm deep and averaging 15cm deep and geeting out hard/dence soil | 100 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_875011.xls
BOQ • 0.33 MB
tenderpage.pdf
Tender Documents • 0.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .