Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.1 L
Closing Date
4 Nov 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
xen id kulgam
id kulgam
Restoration of yari canal at Peerchamb damaged spot.
2021_IFC_144584_5
E-nit10of2021
Open Tender
Civil Works - Canal
Item Rate
10 days
kulgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
5 Nov 2021
21 Oct 2021
5 Nov 2021
21 Oct 2021
4 Nov 2021
21 Oct 2021
90 days
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in- charge. All kinds of Soil
Dumping stone excluding cost of stones in Horizontal on level.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:4:8( 1: cement :4 coarse sand :8 graded stone aggregate 20 mm nominal size).
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:3:6( 1: cement :3 coarse sand :6 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc, and removal of form work for retaining walls, (any thickness) including attached pilasters, buttresses, plinth and string courses.
Filling empty cement bags with sand/earth including cost of sewing and strings, including cost of bags and earth/sand.(complete job).
Silt clearance from canals. Inclusive of initial lead and lift (50m and 1.5 m respectively) wet.
Laying of HDPE pipes 200mm dia including all carriages upto actual site of work.
Carriage of materials from source to actual site of work by mechanical Transport. A. 20mm Stones aggregate Avg lead of 15 km by MT.
b. Cement for an average lead of 10 kms by mechanical transport.
c. Sand for an average lead of 15kms by MT.
d.Stones by an average lead of 10 kms by MT.
MUSHTAQ AHMAD TEELI
ISHTIYAK SALAM
AB Salam Bhat
PARVEEZ AHMAD NAIK
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .