Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC minimum rates |
| 2 | L2₹4.3 LRejected-Finance | ₹4.3 L | L2 | Rejected-Finance EMD Refunded. |
| 3 | L3₹5.2 LRejected-Finance | ₹5.2 L | L3 | Rejected-Finance EMD Refunded. |
| 4 | L4₹5.5 LRejected-Finance | ₹5.5 L | L4 | Rejected-Finance EMD Refunded. |
| 5 | L5₹5.7 LRejected-Finance R O VPO GHASWA DISTRICT FATEHABAD HARYANA 125051 | FATEHABAD | HARYANA | 125051 | ₹5.7 L | L5 | Rejected-Finance EMD Refunded. |
| Sl No | Description | Qty | Unit | GURDEEP SINGH CONTRACTOR L5 | JIMIDARA ELECTRICAL WORKS L2 | SAINI ELECTRICAL WORKS L4 | RADHEY ENTERPRISES L3 | JAI MAA ELECTRICAL & ENGINEERING L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Repair of Submersible / Horizontal pumping sets for tubewell/ Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenances inside the premises of water works.
Submersible Motor Upto 20 BHP
15.00 BHP x 1 No = 15.00 BHP
Total = 15.00 BHP x 12 = 180.00 | 15 | Per BHP Per Month | 185 ₹33,300 | 139.5 ₹25,110 | 180 ₹32,400 | 169 ₹30,420 | 103.7 ₹18,666 |
| 2.00 | Submersible Motor More than 20 BHP
35.00 BHP x 4 No = 140.00 BHP
Total = 140.00 BHP x 12 = 1680.00 | 140 | Per BHP Per Month | 185 ₹3.1 L | 139.5 ₹2.3 L | 180 ₹3.0 L | 169 ₹2.8 L | 103.7 ₹1.7 L |
| 3.00 | Horizontal Motor More than 20 BHP
100.00 BHP x 1 No = 100.00 BHP
Total = 100.00 BHP x 12 = 1200.00 | 100 | Per BHP Per Month | 185 ₹2.2 L | 139.5 ₹1.7 L | 180 ₹2.2 L | 169 ₹2.0 L | 103.7 ₹1.2 L |
Tender Value
₹3.9 L
EMD Value
₹7,800
Closing Date
9 Mar 2026, 3:00 pmClosed
SAMEER SHARMA
Panchkula PHED
Repair of pumping machinery of existing 5 Nos Tubewell and 1 No. Booster and all other works contingent thereto For One Year Under Sub Division Pinjore Model Town
2026_HRY_505947_1
20261BDD8F35 7044 4EBF AA58 672CBE355306547PUH
Open Tender
Civil Works
365 days
Pinjore
2 documents required · 2 mandatory
₹500
Yes
₹7,800
Yes
19 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
Repair of Submersible / Horizontal pumping sets for tubewell/ Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenances inside the premises of water works. Submersible Motor Upto 20 BHP 15.00 BHP x 1 No = 15.00 BHP Total = 15.00 BHP x 12 = 180.00
Submersible Motor More than 20 BHP 35.00 BHP x 4 No = 140.00 BHP Total = 140.00 BHP x 12 = 1680.00
Horizontal Motor More than 20 BHP 100.00 BHP x 1 No = 100.00 BHP Total = 100.00 BHP x 12 = 1200.00
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_584678.xls
BOQ • 0.27 MB
AD0153344.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid