Loading…
Loading…
Tender Value
₹13.6 L
EMD Value
₹27,200
Closing Date
2 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
ELECT/RS
18 conditions · 8 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Use of Railway Land:- Use of railway land required by the contractor(s) for constructing temporary offices, quarters, hutments, etc for the staff and for storing materials, etc. will be permitted to him/them free by railway if available. The location of these offices hutments, stores, etc will be subject to the approval of the Engineer or his representatives. The land will be restored to the railway by the contractor(s) in the same condition as when taken over in vacant condition as desired by the engineer, after completion of the work or at any earlier days as specified by the Engineer. The failure to do so will make the contractor(s) liable to pay the cost incurred by the railway for getting possession of land.
Use of Private Land:- The Contractor will have to make his/their own agreements for use of private land, outside railway limits for due fulfillment of contractor or for borrow pits approach, etc directly with the landowners or local authority and to pay such rent if any as are payable as may be mutually agreed upon between them.
Cess Charges:- (a)For Contractor's labour employed /residing at the station and in colonies where railway sanitary facilities exist, Contractor(s) will be required to pay Cess charges as per rules in force on the railway from time to time. (b)For labour working between station or isolated places where railway facilities do not exist, the Contractor(s) shall be required to provide necessary sanitary facilities for their labour. (c)In terms of Clause 59 (4) of the General Conditions of Contractor(s) and expenditure thus incurred will be recovered from his/their bills.
Contractor's Responsibility to arrange Tools, Plants, Machinery, etc:- The Contractor should make his/their own arrangements for all plants and tools required for the successful completion of the work in time. However, railway may if available, provide on their terms and at the cost of Contractor(s) cost and terms as fixed by the railway as per extant rules) Railway's tools and plants, machinery and stores such as pumps, compressors, drills, tractor, trailers, rails, sleepers, C.C. I. sheets, etc and other facilities which the Contractor may require for the expeditious completion of this contract and which in the opinion of Engineer is necessary but the railway undertake no responsibility for doing so. The decision of the Engineer as to the necessity for the works facilities of stores will be final.
Precautions while working in the Vicinity of Tracks:- (a) When the work is required to be done alone or near the existing railway track, the contractor(s) shall take such steps as are necessary for the safety of the track and labour working at site. He/They will also be required to program his/their working so as to not to interfere with the movement of trains. No extra payment shall be allowed for these precautions and also for crossing track/tracks if required during execution of the work. It should be ensured that the ballast of the track(s) is not spoiled or mixed with earth. (b) In addition to the precautions taken by the Contractor(s) for the safety of the track and labour, it may be necessary to post flagmen in some location as an additional safety measure, for which the cost shall be recoverable from the Contractor(s). The contractor(s) shall be fully responsible for any damage to or trespass caused by his/their men to any surrounding structure, railway bears no liability whatsoever on this account.
Deduction for Income Tax:- The Railway will deduct 2% of income tax on the gross amount of each bill while making payment to the Contractors. The settlement of income tax should be made with the Income Tax Authorities as per extant law.
Tress pass:- The Contractor shall at all times be fully responsible for any damage or trespass committed by his agents or workmen in carrying out the work, even if such trespass is authorized by the Engineer.
Inflammable Articles:- Inflammable materials such as petrol, oil etc. shall be stored separately from other materials and all due precautions as required under the Indian Explosives Act or any other act shall be taken by the Contractor(s) to prevent any fires, etc.
All other Terms and conditions will be applicable as per Tender Document and GCC attached with this tender.
CALIBRATION OF MEASURING INSTRUMENT IN EMU CARSHED BCT, KILE & LINE FOR THE PERIOD OF THREE YEARS.
DRM-RS-2025-26-11~WR
DRM-RS-2025-26-11
Open
Works - General
36 Months
Mumbai, Maharashtra
₹0
₹27,200
2 Jan 2026
9 Dec 2025
19 Dec 2025
87 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 13,61,625.6 | ||
| — | Breakup | for details. | — | ||
| ANEMOMETER | — | — | — | 53,760 | |
| — | Breakup | for details. | — | ||
| VARNEIR CALIPER | — | — | — | 20,520 | |
| — | Breakup | for details. | — | ||
| DIGITAL CLAMP METER | — | — | — | 52,200 | |
| — | Breakup | for details. | — | ||
| TEMPERATURE GUN | — | — | — | 3,89,760 | |
| — | Breakup | for details. | — | ||
| MEGGAR | — | — | — | 47,520 | |
| — | Breakup | for details. | — | ||
| INSULATION TESTER | — | — | — | 47,520 | |
| — | Breakup | for details. | — | ||
| MULTIMETER | — | — | — | 1,65,240 | |
| — | Breakup | for details. | — | ||
| LUX METER | — | — | — | 42,000 | |
| — | Breakup | for details. | — | ||
| LCR-Q-METER | — | — | — | 19,200 | |
| — | Breakup | for details. | — | ||
| LCR METER | — | — | — | 9,600 | |
| — | Breakup | for details. | — | ||
| RPM METER TECHOMETER RPM | — | — | — | 15,600 | |
| — | Breakup | for details. | — | ||
| DUAL CHANNEL FUNCTION GENERATOR | — | — | — | 12,120 | |
| — | Breakup | for details. | — | ||
| IC TESTER INSTEX | — | — | — | 10,800 | |
| — | Breakup | for details. | — | ||
| WRIST STRAP & FOOTWEAR TESTER | — | — | — | 1,800 | |
| — | Breakup | for details. | — | ||
| PERSONAL STATIC TESTER | — | — | — | 1,200 | |
| — | Breakup | for details. | — | ||
| VOLTMETER | — | — | — | 600 | |
| — | Breakup | for details. | — | ||
| AMMETER | — | — | — | 1,080 | |
| — | 3.00 | — | — | ||
| ROCKWELL CUM BRINELL HARDNESS TESTER(SAMARTH) | — | — | — | 17,400 | |
| — | 3.00 | — | — | ||
| BRINELL HARDNESS TESTER(FIE) | — | — | — | 17,400 | |
| — | 3.00 | — | — | ||
| IIW BLOCK TYPE VI | — | — | — | 7,560 | |
| — | Breakup | for details. | — | ||
| TORQUE WRENCH | — | — | — | 50,400 | |
| — | Breakup | for details. | — | ||
| PRESSURE REDUCING VALVE ENDURANCE TEST PANEL | — | — | — | 1,920 | |
| — | Breakup | for details. | — | ||
| LIMITING VALVE (WSF) TEST PANEL | — | — | — | 960 | |
| — | Breakup | for details. | — | ||
| PRESSURE REDUCING VALVE TEST PANEL | — | — | — | 960 | |
| — | Breakup | for details. | — | ||
| SAFETY VALVE TEST PANEL | — | — | — | 960 | |
| — | Breakup | for details. | — | ||
| PARKING BRAKE TEST PANEL | — | — | — | 1,920 | |
| — | Breakup | for details. | — | ||
| BRAKE UNIT TEST PANEL | — | — | — | 1,920 | |
| — | Breakup | for details. | — | ||
| BRAKE CONTROLLER TEST PANEL | — | — | — | 2,880 | |
| — | Breakup | for details. | — | ||
| PRESSURE LIMITING VALVE TEST PANEL | — | — | — | 1,920 | |
| — | Breakup | for details. | — | ||
| AMV AND HMV TEST PANEL | — | — | — | 1,920 | |
| — | Breakup | for details. | — | ||
| AMV AND HMV ENDURANCE TEST | — | — | — | 2,880 | |
| — | Breakup | for details. | — | ||
| EP UNIT & BRAKE CONTROLLER(ESCORT) TEST PANEL | — | — | — | 4,800 | |
| — | Breakup | for details. | — | ||
| STABILIZING VALUE TEST PANEL | — | — | — | 2,880 | |
| — | Breakup | for details. | — | ||
| TRIPLE VALVE TEST PANEL | — | — | — | 2,880 | |
| — | Breakup | for details. | — | ||
| DUPLEX CHECK VALVE TEST PANEL | — | — | — | 1,920 | |
| — | Breakup | for details. | — | ||
| LEVELING VALVE TEST PANEL | — | — | — | 6,720 | |
| — | Breakup | for details. | — | ||
| PHASE SEQUENCE METER | — | — | — | 67,200 | |
| — | Breakup | for details. | — | ||
| SOUND LEVEL METER | — | — | — | 13,200 | |
| — | Breakup | for details. | — | ||
| DIGITAL MULTI STEAM THERMOMETER | — | — | — | 9,000 | |
| — | Breakup | for details. | — | ||
| SURFACE RESISTIVITY METER | — | — | — | 28,800 | |
| — | Breakup | for details. | — | ||
| TEKTRONICS-SCOPE | — | — | — | 4,500 | |
| — | Breakup | for details. | — | ||
| MICROMETER | — | — | — | 10,500 | |
| — | — | — | 2,07,705.6 | ||
| — | GST @ | 18% | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .