Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹23.9 L
EMD Value
₹47,900
Closing Date
26 Oct 2026, 3:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
KARWAR
1 condition
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Modification of existing 33KV DC power supply line and Electrical works associated with Relocation of the Battery charger room to facilitate the extension of existing stabling line (along side ETR line) in Madgaon pit line yards towards MAQ end of Konkan Railway under Karwar region.
KR-KW-EL-T-32-2026~KRCL
KR-KW-EL-T-32-2026
Open
Works - General
90 Days
Navi Mumbai, Maharashtra
₹0
₹47,900
9 Oct 2026
9 Oct 2026
12 Oct 2026
78 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 6,30,045.42 | ||
| — | 11.00 | — | — | ||
| Erection/releasing of 13 mtr long Rail pole including excavation and refilling.(Rail poles will be supplied by KRCL) (7 release + 4 Erection) | — | — | — | 45,549.9 | |
| — | 11.00 | — | — | ||
| Loading of Rail pole from KRCL site and shifting the same to work site and unloading the same at worksite. | — | — | — | 1,04,060 | |
| — | 200.00 | — | — | ||
| Supply of ACSR conductor (DOG) of size100 sq.mm for33KV over head lines conforming SEB requirement | — | — | — | 12,900 | |
| — | 200.00 | — | — | ||
| Erection of ACSR conductor (DOG) of size100 sq.mm for33KV overhead lines conforming SEB requirement. | — | — | — | 1,380 | |
| — | 600.00 | — | — | ||
| Supply of various size of GI channel & Angle etc. | — | — | — | 99,900 | |
| — | 600.00 | — | — | ||
| Erection of various size of GI channel & Angle etc. | — | — | — | 39,732 | |
| — | 12.00 | — | — | ||
| Supply of 33 KV Pin insulator | — | — | — | 8,196.12 | |
| — | 12.00 | — | — | ||
| Erection of 33 KV Pin insulator | — | — | — | 635.16 | |
| — | 6.00 | — | — | ||
| Supply of Disc insulator | — | — | — | 7,872.6 | |
| — | — | — | 425.7 | ||
| — | — | — | 14,190 | ||
| — | — | — | 2,270.4 | ||
| — | 6.00 | — | — | ||
| — | — | — | 36,258.24 | ||
| — | 2.00 | — | — | ||
| — | 20.00 | — | — | ||
| — | — | — | 1,438 | ||
| — | 20.00 | — | — | ||
| Erection of GI wire, 8 SWG | — | — | — | 53 | |
| — | 40.00 | — | — | ||
| Supply of A,B,C,D GI clamp for 4 pole structure | — | — | — | 10,216.8 | |
| — | 40.00 | — | — | ||
| Fixing of A,B,C,D GI clamp for 4 pole structure | — | — | — | 3,027.2 | |
| — | 40.00 | — | — | ||
| Supply & erection of G.I.Nut bolt with washer | — | — | — | 7,378.8 | |
| — | 1.00 | — | — | ||
| Survey, design, drawing, coordination / liasoning and chasing with state utility for modification of power line crossings, arranging payment from KRCL, depositing payment to state utilitycompany,arranging release of load and other related works ,payment to be made to SEB for new connections, load augmentation, modification of power line crossing etc.shall be made by KRCL. | — | — | — | 32,722.14 | |
| — | 3.00 | — | — | ||
| Dismantling of erected poles /Tower 2-4 pole structure, overhead conductor, GI wire, cross arm brackets insulators, stay, luminary etc including accountal, stocking, transporting, handing, over the released material to railway's authorized official as instructed by the Engineer and making temporary arrangements of complete project. | — | — | — | 69,541.08 | |
| — | 4.00 | — | — | ||
| Supply of End termination of outdoor type, heat shrinkable end termination kit, suitable for 3 core 400 sq mm 33 KV HT cable, testing and commissioning etc. | — | — | — | 94,510.2 | |
| — | 4.00 | — | — | ||
| Erection of End termination of outdoor type, heat shrinkable end termination kit, suitable for3 core 400 sq mm 33 KV HT cable, testing and commissioning etc | — | — | — | 13,473.96 | |
| — | 4.00 | — | — | ||
| Supply of stay set including digging & casting of foundations etc. | — | — | — | 8,574.56 | |
| — | 4.00 | — | — | ||
| Erection of stay set including digging & casting of foundations etc. | — | — | — | 2,822.88 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Modification of existing 33KV DC po
ATTACHMENT
TenderDocument-Modification-ETR_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .