Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
16 Jul 2026, 3:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
SIG WORKS
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less ; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. As per Clause No. 10.2 of Tender Form (second Sheet) of Annex.I of Part-I of GCC2022,updated as per RB Letter No.2022/CEI/CT/GCC2022/Policy Dated-14.07.22 with up to date correction slip.
a) The tenderer must have successfully completed or substantially completed anyone of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges substructure, superstructure etc.), tenderer must have successfully completed or substantially completed anyone of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (2) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Signal & Telecom Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be sub-letted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract.
Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Signal & Telecom Engineer in writing. Note for Item 15.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Meaning of similar works:" Any Signalling Work"
6 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer shall submit an undertaking at the time of bidding stating that: "Authorization from the OEM of the UFSBI/Fn-MUX system for Supply, Installation, Testing, Commissioning, and post-commissioning support of the UFSBI/Fn-MUX system shall be submitted before the supply of materials. The authorization shall confirm compliance with the applicable RDSO guidelines and contract-specific requirements for ensuring trouble-free working of the installed UFSBI/Fn-MUX system." Non-submission of the above undertaking shall lead to summary rejection of the b i d . Note: The successful tenderer shall submit the OEM's authorization before the supply of materials to ensure trouble- free working of the installed UFSBI/Fn-MUX system and to confirm compliance with the applicable RDSO guidelines and contract-specific requirements.
Ajmer Division: Provision of UFSBI/Fn-MUX in existing IBS at 4 locations for Strengthening of Signalling Installation and minimize signal events in MD-PNU section over Ajmer Division.
SNT-AII-23-2026-27
SNT-AII-23-2026-27
Open
Works - General
180 Days
Ajmer, Rajasthan
₹0
₹3.0 L
16 Jul 2026
19 Jun 2026
2 Jul 2026
91 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 55,86,763.5 | ||
| — | 4.00 | — | — | ||
| Design of circuits and plans to suit layout given in the signalling plan of IBS/ABS/LC GATE. All plans and wiring diagram shall be prepared on Auto cad Drawing and supplied with CD. This will include supply of Control cum Indication panel diagram, Route section plan, square sheet, wiring diagrams, Relay rack/Relay arrangements, Bus bar details, Fuse analysis, contact analysis, Relay room tag block analysis, panel tag block analysis, Power panel diagram, IPS wiring diagram, Auto change over diagram, Power equipment arrangement with program switch, Block circuit wiring diagram, Digital Axle counter wiring diagram and all other relevant drawings. NOTE: The contactor shall initially supply 2 sets of documents (Paper Prints) for approval of Railways. Railway will return one set to the contactor duly approved with alterations/corrections, if any. The contactor shall incorporate Railways' alterations/ corrections/ comments, if any, in the tracing & CD without any deviation and submit all the tracings and Final CD complete with all respect for Approval of Railways. After Approval of Railways on the tracings, the contractor shall submit 3 sets of final approved diagrams to the Railways within 15 days. He shall ensure each sheet has a block for signature of railway official as well as a block for signature of firm, duly signed by the authorized signatory of the firm. The name of the work as given by Railways shall be written on every sheet under the work column. All the drawing shall be supplied in a good quality folder for each IBS/ABS/LC Gate. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | — | — | — | 69,220.04 | |
| — | 40.00 | — | — | ||
| Addition/alteration in existing relay room wiring. It includes supply of PVC insulated indoor Railway signalling cable @ 40<45@Core/40-Core) of (1/0.6) sqmm as per RDSO Spee. No. IRS/S-76/89 (Amnd.2 or latest) for wiring between relay room and SM's/Panel room & Relay room to DP in SM office for block working. This also includes supply of PVC insulated jumper wires of multi strand 16/.2 mm, tinned in all colours as per RDSO Specn.No.IRS-S-76/89(Amnd.2 or latest). This item will include bringing all the power supplies from power room to respective bus bars on relay racks by using 10/6 sqmm copper flexible wire as per instructions of engineer incharge. This will include wiring between control panel and relay room if required. All wiring will be done as per standard practice of North Western Railway with neat dressing & threading. The item includes supply & wiring of tag block, fuse with bases (G-Type and ND Type) and all other related material required for complete indoor wiring in relay room. Inspection: Consignee Inspection charges: None Payment terms:100% after execution. | — | — | — | 25,230 | |
| — | 5.00 | — | — | ||
| Sealing wire used for sealing of signalling relays & equipments. Inspection: - RDSO Inspection charges: - Borne by Railways Payment Terms: - 100% after supply. | — | — | — | 1,054.65 | |
| — | 100.00 | — | — | ||
| Supply of Cartridge Fuse Block made of PBT and as per RDSO Drg. No. SA-23748 (Alt. 4) or latest and RDSO Specn.No.IRS:S-75/2006 (Rev.2) or latest. Inspection: RDSO. Inspection Charges: Borne by Railways. Payment Terms: 100% on supply. | — | — | — | 18,411 | |
| — | 800.00 | — | — | ||
| Termination of Outdoor Cables (Main Cables /tail cables) at both ends in location boxes, cable termination rack in relay room, station building, generator room etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All material required for this item will be supplied by contractor. The outdoor cable shall be terminated in Relay Room, DG Room, ASM Room etc under supervision and instructions issued by Engr. incharge of the work. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after execution | — | — | — | 8,144 | |
| — | 4.00 | — | — | ||
| Supply of MODEM compatible with existing UFSBI system (for use with secondary/backup media i.e. 4- wire OFC VF Channel form station Primary mux or UFSBI E1 modem) Inspection: RDSO Inspection Charges: Borne by Railways. Payment Terms: 100% after Supply. | — | — | — | 2,69,536 | |
| — | 8.00 | — | — | ||
| Supply of CPU card suitable to work with UFSBI (as per IRS:S 105-2025 ver.1.0 or latest) Inspection: RDSO Inspection Charges: Borne by Railways. Payment Terms: 100% after Supply. | — | — | — | 2,99,768 | |
| — | 8.00 | — | — | ||
| Supply of CCC card suitable to work with UFSBI (as per IRS:S 105-2025 ver.1.0 or latest) Inspection: RDSO Inspection Charges: Borne by Railways. Payment Terms: 100% after Supply. | — | — | — | 2,53,240 | |
| — | 8.00 | — | — | ||
| Supply of OUTPUT card suitable to work with UFSBI (as per IRS:S 105-2025 ver.1.0 or latest) Inspection: RDSO Inspection Charges: Borne by Railways. Payment Terms: 100% after Supply. | — | — | — | 2,92,120 | |
| — | 8.00 | — | — | ||
| Supply of INPUT card to work with UFSBI (as per IRS:S 105-2025 ver.1.0 or latest) Inspection: RDSO Inspection Charges: Borne by Railways. Payment Terms: 100% after Supply. | — | — | — | 1,15,176 | |
| — | 8.00 | — | — | ||
| Supply o f Hot-Standby DC-DC Converter type Power Supply to work with UFSBI (as per IRS:S 105-2025 ver.1.0 or latest) Inspection: RDSO Inspection Charges: Borne by Railways. Payment Terms: 100% after Supply. | — | — | — | 4,27,152 | |
| — | 20.00 | — | — | ||
| Cement concrete work for miscellaneous items in the ratio 1: 3: 6. Item includes excavation, ramming, curing and plastering with cement & sand mixture (aggregate not exceeding 3.8 cm.) (Aggregate cement & sand to be supplied by the contractor)(cum is Cubic Meter). Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 87,332.2 | |
| — | 4.00 | — | — | ||
| Installation of Apparatus Cases Single (Large) with 'E' type lock on CC foundation. This includes filling of location foundations with river bed sand and plastering on top of the sand. Supply of 'E' Type lock has been covered in supply of Apparatus case separately. It covers fixing of lamp holder, switch and lamp etc. in Apparatus Case. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. | — | — | — | 5,002.16 | |
| — | 4.00 | — | — | ||
| Installation of Apparatus Cases Half (Medium) with 'E' type lock on CC foundation. This includes filling of location foundations with river bed sand and plastering on top of the sand. Supply of 'E' Type lock has been covered in supply of Apparatus case separately. It covers fixing of Location lamp holder, switch and lamp etc. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. | — | — | — | 3,046.24 | |
| — | 4.00 | — | — | ||
| Excavation and Casting of Apparatus Case foundation in ratio 1:3:6 with contractor's own materials including cement and galvanized anchor bolts of standard size. The required scaffolding Ferma etc for Casting of foundation will have to be brought by the contractor at his own cost. The item also includes additional masonry work as well as earthwork if required on bank where there will be possibilities of foundation sinked, fallen or tilted. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. Single (Large) Case Apparatus case / SS location box as per Drg No. CSTE/5074 | — | — | — | 33,163.24 | |
| — | 4.00 | — | — | ||
| Excavation and Casting of Apparatus Case foundation in ratio 1:3:6 with contractor's own materials including cement and galvanized anchor bolts of standard size. The required scaffolding Ferma etc for Casting of foundation will have to be brought by the contractor at his own cost. The item also includes additional masonry work as well as earthwork if required on bank where there will be possibilities of foundation sinked, fallen or tilted. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. Half (Medium) Case Apparatus case / SS location box as per Drg No. CSTE/5074 | — | — | — | 25,317.6 | |
| — | 3.00 | — | — | ||
| Supply of Phenolic laminated Sheet, grade P3 in standard size of 1220 X 1220 x 20 mm as per spec. No IS 2036 of 1995 or latest. Test report of manufacture to be supplied. Inspection: (i) RITES if value of item in work more than 10 lakhs or as per extant instructions by Railway Board. (ii) Consignee Inspection Charges:(i) Borne by Railways(ii) None Payment Terms: 100% after Supply. | — | — | — | 34,528.86 | |
| — | 4.00 | — | — | ||
| Fabrication and fixing of phenolic laminated sheet of size 10/12/20 mm thick in location box by providing all fixtures as per Railway Drawing including fixing of PVC coated string rods at the back side for cable support with contractor's own materials. The work shall be done as per instructions of Rly engineer at site. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. Single Case (Large Case) | — | — | — | 11,286.36 | |
| — | 4.00 | — | — | ||
| Fabrication and fixing of phenolic laminated sheet of size 10/12/20 mm thick in location box by providing all fixtures as per Railway Drawing including fixing of PVC coated string rods at the back side for cable support with contractor's own materials. The work shall be done as per instructions of Rly engineer at site. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. Half Case (Medium Case) | — | — | — | 3,292.76 | |
| — | 800.00 | — | — | ||
| Fixing of ARA(M-6) Terminals /Screw less connectors / modular disconnect terminal blocks and fuse blocks on phenolic laminated sheets and fixing by stainless steel/brass nuts & bolts. This includes provision of two additional holes on the board on either side for cable conductor entry. (Supply of all above terminals have been covered separately in Chapter 4 of SOR) Inspection: Consignee Inspection Charges: None Payment Terms: 100% after installation. | — | — | — | 12,056 | |
| — | 4000.00 | — | — | ||
| Supplying and placing of one layer of standard size of 'B' grade quality bricks of the local make spreading on cables laid. (minimum size of brick 200mm X 100mm X 70mm) Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Installation. Length wise (up to 2 cables). | — | — | — | 71,240 | |
| — | 600.00 | — | — | ||
| Supplying and placing of one layer of standard size of 'B' grade quality bricks of the local make spreading on cables laid. (minimum size of brick 200mm X 100mm X 70mm) Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Installation. Width wise (more than 2 cables) | — | — | — | 23,016 | |
| — | 30.00 | — | — | ||
| Removal of excavated/slip earth/ debris/ malba from the site of works to any other place outside Railway land/premises, including all excavations, handling, re-handling, loading, unloading and leading, etc. all labour and material as a complete job. Removal of Earth (all kinds of soils)/ROCKS, BOULDERS including mud/slush, slipped earth in catch water drains, side drains, over berms in cutting, water way of bridges, over coping of toe/breast/retaining walls etc. including crossing of nallah, railway tracks, making/repairing approach roads if required, all lead, lift, ascent, descents, or any other obstruction. Earth spoils to be dumped outside the cutting or railway embankments as per direction of Engineer in charge. (cum is Cubic Meter) Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution | — | — | — | 4,987.5 | |
| — | 720.00 | — | — | ||
| Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketch No. SDO/CABLE LAYING/003 or latest alongside the track in normal (all type) soil/strata, conforming to distances as per cable route plan and refilling. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on North Western Railway and instructions of Railway Engineer at site. In case 1.2m depth of trench is not achievable due to site conditions, specific approval of JA grade officer will be required for each site where trench depth of 1.2m is not possible. Without the approval of JA Grade officer, no payment for trenching will be made for trench depth less than 1.2m. (cum is Cubic Meter) Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 2,37,672 | |
| — | 720.00 | — | — | ||
| Digging of cable trench 0.3 Mtrs. Deep and 0.3 Mtrs. Wide on Asphalted Platform / Road / Hard rocky area. Refilling with earth levelling of trenches & restoring the original surface of trenches. The sharp edges will be smoothened out in bottom of the chase and will be levelled properly. In hard rocky ground area, cables will be laid normally on layer of shifted earth of 0.05 mtrs thickness previously deposited at bottom of the trench and cables will be covered with layer of sand or shifted earth of 0.1 mtr thickness. In case sharp edges of rocky ground cannot be protected from shifted earth then GI/ CI /PVC /DWC/ HDPE pipes will be used, if numbers of cables are small. In case number of cables are large RCC duct will be used. In isolated cases, it can be given smooth surface by using either masonry bricks or cement concrete. A row of bricks shall then be placed length wise on the top and jointed with cement mortar and layer of concrete with cement plaster shall be provided on top of the same. Note: This item in hard rocky area will be operated only where normal depth i.e.l.2 mtr is not possible and it will be decided by site engineer/unit officer incharge of work. (cum is Cubic Meter) Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 4,35,895.2 | |
| — | 2.00 | — | — | ||
| Digging of cable pit (min 2x2x1m) as per instruction of Site Engineer, supplying and filling of sand before and after coiling the cables, covering top of the cable pit with stones and providing brick masonry on all four sides of the cable pit and plastering thereafter. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution | — | — | — | 30,103.34 | |
| — | 20.00 | — | — | ||
| Providing brick masonry in ratio 1:6 cement and mortar including plastering with 1:4 cement and sand mixture both sides, 20 mm thick each with contractor's owned class II bricks, including excavation, curing, grouting, bolting etc. wherever required. Bricks sand and cement to be supplied by the contractor.(cum is Cubic Meter) Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 47,912.2 | |
| — | 35000.00 | — | — | ||
| Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes/ Trunking. This also includes laying of cables in track crossings & road crossings. Item includes provision of labels of coloured plastic adhesive tapes or any other identifiable material on each cable to give the cable number at each Gantry Post/hectometer post. (Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after Execution | — | — | — | 3,83,250 | |
| — | 30.00 | — | — | ||
| Supply of Rapid Joint LS3, suitable for cable Jointing of Signalling cable of various size, having dielectric strength > 20KV/mm, Non-Toxic, low viscosity, Flammability point > 200 C, Re-enterable, long storage life Make RAYTECH or Similar. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Supply Cable Size 6C x 1.5 Sq. mm. | — | — | — | 1,26,601.8 | |
| — | 30.00 | — | — | ||
| Supply of Rapid Joint LS3, suitable for cable Jointing of Signalling cable of various size, having dielectric strength > 20KV/mm, Non-Toxic, low viscosity, Flammability point > 200 C, Re-enterable, long storage life Make RAYTECH or Similar. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Supply Cable Size 12C x 1.5 Sq. mm. | — | — | — | 1,76,157.3 | |
| — | 15.00 | — | — | ||
| Supply of Rapid Joint LS3, suitable for cable Jointing of Signalling cable of various size, having dielectric strength > 20KV/mm, Non-Toxic, low viscosity, Flammability point > 200 C, Re-enterable, long storage life Make RAYTECH or Similar. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Supply Tools for installation of Rapid Cable Joint kit. | — | — | — | 93,893.25 | |
| — | 8.00 | — | — | ||
| Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No. RDSO/SPN/197 Version 1.0 dtd. 04.07.2016 or latest and conforming to RDSO Drg. No. SDO/ RDSO/E&B/001. It consist of following: (a) Copper bonded steel electrode of 3.0 m long, 17 mm Dia with copper bonding thickness of minimum macrons and UL listed and marked = 1 no. (b) Earth enhancement material supplied in sealed bags of minimum 10 kg = 3 nos. (c) Copper strip of 150x25x6 mm, to terminate earth rod = 1 no. (d) Copper strip of 300x25x6 mm (MEEB) = 1 no. (e) Copper strip of 150x25x6mm (SEEB) = 1 no. (ii) Supply of 35 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting main earth electrode to MEEB in the equipment room in duplicate.(minimum 10 meter) (iii) Supply of 16 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting MEEB to SEEB and SPD to MEEB (minimum 10 meter ) (iv) Supply of 10 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting various equipments to SEEB (v) Supply of copper lug sleeve for 3/16 cable Inspection: RDSO Inspection Charges: Borne by Railways Payment Terms: 100% after Supply | — | — | — | 1,68,785.84 | |
| — | 8.00 | — | — | ||
| Installation of Unit Maintenance Free Earth as supplied under item no. 13010300 above It includes: ( i ) Digging the earth to the required depth. (ii) Insertion of electrode. (iii) Filling of earth enhancing compound (Approx.30 Kg) (iv) Provision of exothermic weld connections to copper tape of 25 mm x 6 mm x 150 mm to the earth electrodes. All material tools and features required for weld will be arranged by contractor. (v) This also includes CC cover 1.5 ft x 1.5 ft. 1 ft wall thickness 2 inch with cover 3-inch thickness. Cables 35 Sq mm/ 16 Sq mm/10 sq mm for connecting earth to busbar, busbar to busbar and busbars to various equipments. Earth electrode of 17.20 mm Dia and 3.00 meter long high tensile low carbon steel circular rods molecularly bonded with copper and outer surface (minimum copper bonding thickness of 250 microns to made requirement of under writer's laboratories (UL) 467-2007 or latest. Copper strips of 150 mm x 25 mm x 6 mm to be welded with each earth electrode, copper strips of 300 mm x 25 mm x 6 mm for main equip- potential busbar, copper strips of 150 mm x 25 mm x 6 mm sub equip-potential busbar in relay room, power room and panel room. GI strip 25 mm x 2 mm for ring formation of earth pits Earth enhancement material in bags for each Earth Electrode. Inspection chamber of site 300 mm x 300 mm x 300 mm (Inside dimension) of approximate 50 mm thick with pulling hooks to cover the earth pits. Note: The installation of this item shall be carried out by the contractor as per RDSO/SPN/197 Version 1.0 dtd. 04.07.2016 or latest and conforming to RDSO Drg. No. S DO/RDSO/E&B/001 or latest. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after execution and testing. | — | — | — | 75,692.24 | |
| — | 10.00 | — | — | ||
| Supply and Installation of earth electrode including MS flat for signalling equipments on lever frame, apparatus cases, signal, relay racks, cable termination rack, block instrument etc. (supply & installation of earth electrode as per drawing no. RE/S&T/DRG/Tender/SK/398/94 for apparatus cases, signal post & other equipments as per instruction on earthing of S&T equipment. Laying of earth lead mild steel flat of size 35mmx6mm and fixing of lead MS flat to earth electrode and lever frame, signal post & apparatus cases as per Drg. No. CORE/S&T/ALD/SK/591/2008, 592/2008 and 593/2008 respectively and instructions on earthing at S&T equipment and providing cement enclosure for earth electrode as per drawing no. RE/S&T/Sig./Tender/SK/13/85 Alt. A) Note: This item requires for earthing of all the A/Cases & Signal as per RE standard. Inspection: Consignee Inspection charges: None Payment terms: 70% after supply, 20% after installation & 10% after commissioning | — | — | — | 81,998.6 | |
| — | 4.00 | — | — | ||
| Painting of two coats of synthetic enamel paint over one coat of primer on the following after scraping & cleaning surface wherever necessary with contractor's own supply of paints. Wherever required contractor shall apply coating of epoxy paint also as per instructions of site-in-charge. Epoxy paint will be supplied by Railways. Note: - The paint and primer should be from Asian Paints/ Nerolac/ Dulux / Berger. The primer / enamel paints (Aluminium synthetic, black enamel, brilliant white and yellow) will be as per (IS 5660 of 1970) / (IS 2932 of 1974). Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution Apparatus Case Full Size. (Outside & inside) | — | — | — | 1,221.8 | |
| — | 4.00 | — | — | ||
| Painting of two coats of synthetic enamel paint over one coat of primer on the following after scraping & cleaning surface wherever necessary with contractor's own supply of paints. Wherever required contractor shall apply coating of epoxy paint also as per instructions of site-in-charge. Epoxy paint will be supplied by Railways. Note: - The paint and primer should be from Asian Paints/ Nerolac/ Dulux / Berger. The primer / enamel paints (Aluminium synthetic, black enamel, brilliant white and yellow) will be as per (IS 5660 of 1970) / (IS 2932 of 1974). Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution Apparatus case Half Size. (Outside & inside) | — | — | — | 1,106.72 | |
| — | 4.00 | — | — | ||
| Lettering / Numbering Termination particulars, equipments names etc., legibly and neatly inside location boxes. This includes supply of paints of Asian Paints/ Nerolac / Dulux / Berger make. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution Full Case | — | — | — | 575.28 | |
| — | 4.00 | — | — | ||
| Lettering / Numbering Termination particulars, equipments names etc., legibly and neatly inside location boxes. This includes supply of paints of Asian Paints/ Nerolac / Dulux / Berger make. Inspection: Consignee Inspection Charges: None Payment Terms: 100% after Execution Half Case | — | — | — | 394.44 | |
| — | 16.00 | — | — | ||
| Supply of integrated Access Multiplexer 4U height/19" Rack mountable with 4 DTE (1+1) protection E1 interfaces & V.21/V.23 Modules supporting 8 Interface of (2W/4W) in one module and one Telnet port balance 2 slots empty; unit to support both AC/DC power supply; Cable to be provided for one no for E&M interface; DC to AC adapter- 1 Nos; Make Fabio 4C/ 4E1/ DC Team Engineer, Mapple 4C with 4E1s equivalent or superior. Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after supply. | — | — | — | 10,27,216 | |
| — | 16.00 | — | — | ||
| Installation of integrated Access Multiplexer 4U height/19" Rack mountable with 4 DTE (1+1) protection E1 interfaces & V.21/V.23 Modules supporting 8 Interface of (2W/4W) in one module and one Telnet port balance 2 slots empty; unit to support both AC/DC power supply; Cable to be provided for one no for E&M interface; DC to AC adapter- 1 Nos; Inspection: Consignee Inspection Charges: None. Payment Terms: 100% after execution. | — | — | — | 1,74,232.32 | |
| — | 16.00 | — | — | ||
| — | 16.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TENDER DOCUMENT
ATTACHMENT
SNT-AII-23-2026-27UFSBIMUX4IBS.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .