Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹17.7 L
EMD Value
₹17,800
Closing Date
30 Nov 2026, 1:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Unit Head, Upper Kolab HEP, Bariniput
UKHEP, Bariniput
Construction of Roof Top Shed over Erectors Hostel
2026_OHPCL_146877_1
e-Tender-07/2026-27_UKHEP
Open Tender
Civil Works - Buildings
Percentage
Upper Kolab HEP, Bariniput
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹17,800
Yes
21 Nov 2026
21 Nov 2026
1 Dec 2026
21 Nov 2026
30 Nov 2026
21 Nov 2026
21 Nov 2026 - 30 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing old lime or cement plaster from walls including racking out joints 12mm.deep and removing the debries within 50mtr lead as per direction of EIC. | 150 | Per Sqm | 58.94 | ₹8,841 |
| 2 | Close deep chipping and cleaning to R.C.C.surface for receiving cement plaster or cement concrete including all labour, T&P, sundries and labour cess etc complete in ground floor & 1st floor. | 24 | Per Sqm | 27.3 | ₹655.2 |
| 3 | Providing and finishing wall surface with Birla white wall seal water proofing putty of Asian/ Berger/ Shalimar make and finished smooth and even surface to receive painting including cost of paint, scaffolding charges, labour, T & P, sundries, labour cess etc complete in ground floor & 1st floor. | 172.36 | Per Sqm | 111.61 | ₹19,237.1 |
| 4 | Dismantling brick or stone masonry in lime or cement mortar under 3mtr.height including stacking the useful materials for reuse and removing the debries within 50mtr lead including all labour,T & P, sundries,lead, lift, delift and labour cess etc complete in ground floor & 1st floor. | 13.57 | Per Cum | 1,674.46 | ₹22,722.42 |
| 5 | Removing old tarfelt from roof slab and chajja cleaning the surface, lowering and removing the debris away from work site by any mechanical means within 5Km including all labour, T&P, Sundries, loading, unloading, carriage and labour cess etc complete from ground floor. | 54.74 | Per Sqm | 103 | ₹5,638.22 |
| 6 | Cleaning of open area with broom stick/coir Brushes Guest house roof top Building complete as per direction of the EIC.(outside) | 2,416.5 | Per Sqm | 0.27 | ₹652.46 |
| 7 | Supplying all required materials, fabricating trusses, rafters, vertical posts, bracings etc and welding of 80mm x 80mm x 3mm, 50mm x 50mm x 2.5mm and 40mm x 40mm x2mm thick Gr 304 Stainless Steel Square Hollow Sections and 4mm thick S.S plate etc at site including cost of all materials, conveyance, all labour, T & P, sundries and labour cess etc complete. Unit =Per Qntl. Rate as per local market Jeypore. | 102.3 | Per Qntl. | 7,540.83 | ₹7,71,426.91 |
| 8 | Hoisting joists & trusses & placing in position including all labour, T & P, sundries, lead, lift, delift and labour cess etc complete in ground floor. AR - 2006, P - 224, I - 1 Unit =Per Qntl. | 102.3 | Per Qntl. | 1,373.7 | ₹1,40,529.51 |
| 9 | Cutting hole in R.C.C floors and roofs upto 19cm thick for passing G.I / P.V.C pipes and fittings and repairing the holes safter insertion of pipe etc with cement concrete (1:2:4) including finishing complete so as to make it leak proof including cost of all materials, T & P, sundries, lead, lift, delift, scaffolding, all other materials if required and labour cess etc complete. PHAR - 2013, P - 109, I - 3.1.11 Unit = Per hole. | 296 | Per Holes | 217.2 | ₹64,291.2 |
| 10 | Earth work in hard soil or gravelly soil within 50m intial lead & 1.50 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and including cost of all labour, T & P, sundries and labour cess etc complete as per direction of EIC. | 0.65 | Per Cum | 276.89 | ₹179.98 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_622612.xls
BOQ • 0.31 MB
SPEC.pdf
Tender Documents • 1.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .