Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance L1 Lowest Price Bidder | |
| 2 | L2₹2.0 L+₹3,253 (1.66%)Rejected-Finance AASHIYANA SECTOR N 304 KILA CHAURAHA KANPUR ROAD AASHIYANA LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | L2 | Rejected-Finance Rates are on Higher Side Bidder | |
| 3 | L3₹2.0 L+₹7,225 (3.69%)Rejected-Finance | L3 | Rejected-Finance Rates are on Higher Side Bidder |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
8 Apr 2020, 6:00 pmClosed
SUPERINTENDING ENGINEER
220 KV SUb station Gidahi basti
Replacement/Checking and Tightening of 132 KV and 33 KV Jumpers and Overhauling of Isolators at 132 KV Sub-Station Mehdawal, Under ETD-I Basti.
2020_UPTCL_456363_1
101
Open Tender
Electrical Works
Lump-sum
90 days
220 KV SUb station Gidahi basti
As Per Tender
2 documents required · 2 mandatory
₹590
UPSEB ELECTRICITY TRANSMISSION DIVN
₹2,000
13 Apr 2020
30 Mar 2020
9 Apr 2020
30 Mar 2020
8 Apr 2020
30 Mar 2020
Amount
Maintanance of Equipments Installed at 132 KV Bays
Overhauling work of 132 KV LSI, BSI and Tandom Isolators which includes replacement of defective parts of Isolators, cleaning of their Pis, oiling-greasing and setting in proper alignment for it's smooth operation. (01 tie in an year.) All skilled labours and required T & P will arranged by the contractor and required materials will be provided by the department in free of cost.)
Checking and Tightening of 132 KV side Jumpers including replacement of nut-bolts, clamps/connectors.(02 Times in an Year)All skilled Labour and required T & P will arranged by the contractor and required materials will be provided by the department in free of cost.)
Replacement of 132 KV Side jumpers from Bus Bar to equipments and Equipments to Equipments as per requirements as per requirement. (All skilled Labours and required T & P will arranged by the contractor and required materials will be provided by the department in free of cost.)
Maintenance of Equipments Installed at 33 KV Bays
Overhauling work of 33 KV LSI, BSI and Transfer Bus Isolators which includes replacement of defective parts of Isolators, cleaning of their PIs, oiling-greasing and setting in proper alignment for it's smooth operation. (01 time in an year.) All skilled labours and required T & P will arranged by the contractor and required materials will be provided by the department in free of cost.)
Checking and Tightening of 33 KV side Jumpers including replacement of nut-bolts, clamps/connectors.(02 Times in an Year)All skilled Labour and required T & P will arranged by the contractor and required materials will be provided by the department in free of cost.)
Replacement of 33 KV Side jumpers from Bus Bar to equipments and Equipments to Equipments as per requirements as per requirement. (All skilled Labours and required T & P will arranged by the contractor and required materials will be provided by the department in free of cost.)
SMV POWER SOLUTION
SKR ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .