| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | L1 | Accepted-AOC work awarded due to lowest quoted amount. (L1 Bidder) | |
| 2 | L2₹10.7 L+₹96,638.92 (9.93%)Rejected-Finance | L2 | Rejected-Finance Reject due to higher quoted. (L2 Bidder) | |
| 3 | L3₹12.7 L+₹3.0 L (30.4%)Rejected-Finance | L3 | Rejected-Finance Reject due to higher quoted. (L3 Bidder) | |
| 4 | Rejected-Technical | - | Rejected-Technical Failed in Technical evaluation due to not submission of firm registration, Balance Sheet of Last three FY, Avg. Annual Turnover of FY 2021-2022. | |
| 5 | Rejected-Technical | - | Rejected-Technical Failed in Technical evaluation due to not submission of Avg. Anual Turnover of FY 2021-22(NIL) |
Tender Value
₹11.7 L
EMD Value
₹23,480
Closing Date
26 Jan 2023, 3:00 pmClosed
Executive Engineer
O/o Executive Engineer, UBD, CWC, Dibrugarh-786003 (Assam)
As per the Scope of Work mentioned in the tender document
2023_CWC_735502_1
04/01/NIT/2022-UBD/189-93
Open Tender
Civil Works
Item Rate
60 days
Tezu, Arunachal Pradesh-792001
As per the NIT
8 documents required · 8 mandatory
₹0
₹23,480
Yes
28 Feb 2023
18 Jan 2023
27 Jan 2023
18 Jan 2023
26 Jan 2023
18 Jan 2023
18 Jan 2023 - 20 Jan 2023
Amount
“Maintenance & Providing dutch-hip roof to existing 2 storey RCC office building Tezu site,Arunachal under UBSD-I and UBD,Dibrugarh during the year 2022-23”
Dimolishing RCC work including stacking of steel bars and disposal of unserviceable materials with in 50m lead
Reinforcement of RCC work including bending, binding and placing in position complete. (Cold Twisted bar)
Centring and shuttering including strutting, propping etc and removal of form work for :Foundation, Footing bases of column etc. and mass concrete.
Centring and shuttering including strutting, propping etc and removal of form work for :Lintel, Beams, girder, bressumers and cantilevers etc
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement in Column. (i) 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).
Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement In Beam - (i)1 : 1.5 :3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Steel work in built up tubular trusses including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer welded and bolted including special shaped washers etc complete (welding to be paid separately).
Welding by Electric plant (Lump Sump)
Providing aluminium troughed G.I.sheet roofing fixed with J hooks, bolts & nuts with bitumen( the j hook, nut ad bolt are as per IS-733 of 1983) and limpet washers filled with white lead complete, excluding the cost of purlins, rafters and trusses. a) 0.65 mm thick GI sheet
Providing and fixing Durashine Zinc-Aluminium alloy coated (TATA Bluescope building product) sheet ridge with necessary fasteners and lapping method as described by the manufacturer inclusive of cutting hoisting and fixing complete, excluding the cost of purlins, rafter and trusses.
Removing dry or oil bound distemper by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Distempering (one or more coats) with oil bound washable distemper of approved brand and manufacture and pf required shade old work (one)or more coats) to given an even shade.
Finishing walls with water proofing cement paint of approved brand and manufactured and of required shade on old work (one )or more coats) to given an even shade.
Painting (one or More coats) with superior ready mixed paint for wood work of approved brand and manufactured in all shade on old work to given an even shade.
Painting (one or More coats) with superior ready mixed paint for Steel work of approved brand and manufactured in all shade on old work to given an even shade
Cement plaster of mix 1:4 (1cement : 4 sand)
Earth work in excavation in foundation and trenches etc. in all kind of soil (excluding soil containing 50% or more of shingles of small size boulder up to 30 cm size saturated soil and rock) lift up to 1.5m and staking the excavated soil not more than 3m clear from the edge of the excavation and returning the excavated soil in 15 cm layers when required to the plinth side of foundation etc consolidating the each deposited layers by ramming and watering and then depositing of all surplus excavated soil as directed with in a lead of 50m
Providing and laying cement concrete 1:3:6 (1 cement: 3course sand: 6 graded stone aggregate 40mm nominal size) excluding cost of centering and shuttering in (a) Foundation, Plinth
Centering and shuttering including strutting, propping etc. and removal of form work for (a) Foundation, Plinth
Centering and shuttering including strutting, propping etc. and removal of form work for (c) columns, Pillars and Piers
Reinforcement of RCC work including bending, binding, and placing in position complete (a) Mild Steel
Reinforced concrete works in foundation, footings. Bases of columns etc. and mass concrete excluding cost of centering and shuttering and reinforcement in (a)M20 (1 Cement: 1.5 Coarse sand : 3 Stone aggregates 20mm size Nominal size)
Half brick masonry (with best available local bricks) in cement mortar 1:3 (1 Cement: 3 coarse sand) in foundation and plinth.
15mm cement plaster 1:6 (1 Cement: 6 fine sand) on the rough side of single or half brick wall
M/S KHAMHOO ENTERPRISE
S AND P COMMUNICATION
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .