| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC | ₹4.3 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹5.0 Cr+₹61.8 L (14.3%)Rejected-Finance | ₹5.0 Cr+₹61.8 L (14.3%) | L2 | Rejected-Finance HIGH RATE |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
26 Feb 2024, 12:00 pmClosed
SUPERINTENDING ENGINEER
SE BALLIA CIRCLE PWD BALLIA
Renovation work along with general repair of Bindra Bazaar Chirayakot Belthara Road
2024_CEUAZ_899819_1
370/NIVIDA(CD-Mau)-BALLIA CIRCLE/2023 Date- 24.01.2024
Open Tender
Civil Works
Item Rate
240 days
MAU
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,130
₹10.6 L
SE BALLIA CIRCLE PWD BALLIA
8 Apr 2024
19 Feb 2024
26 Feb 2024
19 Feb 2024
26 Feb 2024
19 Feb 2024
20 Feb 2024
Amount
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work.
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including cost of bitumen, All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work.
Providing and laying of hot applied thermo plastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass bed as perIRC 35 inclduing cost of all materials , labour , Machinaries , T&P etc. requared for peoper completion of work i/c all other charges and taxes . The finishied surface to be level uniform and free from streks and holes as per MORTH specification no. 803. (Including cost of bitumen, All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. (Including All Taxes, Labour cess , Royalty etc. but Excluding GST ) for proper completion of Work.
M/s Trishakti Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .