| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.9 LAccepted-AOC BASGO LEH 194 101 U T LADAKH INDIA | LEH LADAKH | LADAKH | 194101 | ₹49.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹51.7 L+₹1.8 L (3.61%)Rejected-Finance KHREW PULWAMA PAMPORE J K PIN 191103 | PULWAMA | JAMMU AND KASHMIR | 191103 | ₹51.7 L+₹1.8 L (3.61%) | L2 | Rejected-Finance L2 |
| 3 | L3₹56.7 L+₹6.7 L (13.5%)Rejected-Finance | ₹56.7 L+₹6.7 L (13.5%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S SONAM NAMGIAL L1 | Ashfaq Construction Company L2 | M/S SHOWKAT ALI L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply and fixing LLDPE septic tank having advanced version of septic tank of capacity of 2000 liter. Septic should have two zones, the first zone is as septic zone for sludge stabilization by anaerobic digestion and second zone as the pall ring media zone which can retain micro-organism long enough to digest the organic waste resulting in 70% of BOD reduction from final output. The septic tank need to be provided with inlet & outlet pipe of 100mm dia, 50mm dia vent pipe, internal piping, manhole cover of 400mm dia including providing Bio Septic tank Bacteria @ 3 Kg per tank for 1 Year (750g in every 3 months). The rates of bio septic tank bacteria is included in the unit quoted rates.
Note: List of locs for installation of septic tanks at site:-
Khaltsi-02, Lamayuru-01, A'thang-03, H'Thang-01, Biamah-02, handanbrok-01, Ganashok-01, Batalik-01 | 17 | Each | 98,060.04 ₹16,67,020.68 | 90,000 ₹15,30,000 Lowest | 1,05,000 ₹17,85,000 |
| 2.00 | Supply and fixing LLDPE septic tank having advanced version of septic tank of capacity of 5000 liter. Septic should have two zones, the first zone is as septic zone for sludge stabilization by anaerobic digestion and second zone as the pall ring media zone which can retain micro-organism long enough to digest the organic waste resulting in 70% of BOD reduction from final output. The septic tank need to be provided with inlet & outlet pipe of 100mm dia, 50mm dia vent pipe, internal piping, manhole cover of 400mm dia including providing Bio Septic tank Bacteria @ 6 Kg per tank for 1 Year (1.50 kg in every 3 months). The rates of bio septic tank bacteria is included in the unit quoted rates.
Note: List of locs for installation of septic tanks at site:-
Khaltsi-02, Lamayuru-01, A'thang-03, H'Thang-01, Biamah-02, handanbrok-01, Ganashok-01, Batalik-01 | 7 | Each | 1,86,324.84 ₹13,04,273.88 Lowest | 2,00,000 ₹14,00,000 | 2,00,000 ₹14,00,000 |
| 3.00 | M&L for earth work in excavation by mechanical means n exc 1.5 mtr depth (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-incharge | 201.15 | Cum | 178.68 ₹35,941.96 Lowest | 650 ₹1,30,747.5 | 700 ₹1,40,805 |
| 4.00 | M&L for earth work in excavation by mechanical means exc 1.5 mtr and n exc 3.0 depth (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-incharge | 26.32 | Cum | 214.2 ₹5,637.84 Lowest | 650 ₹17,108 | 750 ₹19,740 |
| 5.00 | M&L for exavation over areas in hard dense soil, not exceeding 1.5 m deep and getting out complete all as specified & directed . | 279.54 | Cum | 484.38 ₹1,35,403.59 | 420 ₹1,17,406.8 Lowest | 450 ₹1,25,793 |
| 6.00 | M&L for exavation over areas in hard dense soil, exceeding 1.5 m and not exceeding 3.00 m deep and getting out complete all as specified & directed . | 35.09 | Cum | 654.45 ₹22,964.69 | 420 ₹14,737.8 Lowest | 450 ₹15,790.5 |
| 7.00 | M&L for excavation in trenches n.exc 1.5m wide and n.exc 1.5m in depth for foundations etc or for shafts, wells cesspits, manholes, pier holes etc n.exc 10 Sqm on plan and n.exc 1.5m in depth and getting out in hard dense soil complete all as specified and directed. | 57.6 | Cum | 726.57 ₹41,850.43 | 410 ₹23,616 Lowest | 450 ₹25,920 |
| 8.00 | Returning filling in, including spreading leveling, watering and well ramming in layers not exceeding 25cm in soft/loose soil complete all as specified and directed. | 141.11 | Cum | 149.62 ₹21,112.82 Lowest | 300 ₹42,333 | 300 ₹42,333 |
| 9.00 | Removal of excavated soil to a distance exc 50 and n exc 500m and depositing where directed at a level n.exc. 1.5 m above the starting point complete all as specified | 231.12 | Cum | 626.46 ₹1,44,788.54 | 320 ₹73,958.4 Lowest | 320 ₹73,958.4 Lowest |
| 10.00 | M&L for PCC (1:4:8) type D-2 using 40mm graded stone aggregate as in foundation etc, complete all as specified & directed | 21.85 | Cum | 5,901.9 ₹1,28,956.54 Lowest | 6,900 ₹1,50,765 | 6,900 ₹1,50,765 |
Tender Value
₹48.6 L
EMD Value
₹97,120
Closing Date
21 Jul 2026, 6:00 pmClosed
CWE KHUMBATHANG
HQ CWE KHUMBATHANG pin-90070 C/O 56 APO
PROVN OF 17 X 2 KLD AND 07 X 5 KLD ADVANCE LINEAR LOW DENSITY POLYETHYLENE (LLDPE) SEPTIC TANK AT BIAMAH
2026_MES_764695_2
80051/07/2026-27
Open Tender
Civil Works
Item Rate
210 days
BIAMAH
Class D and above, Cat a(ii)
9 documents required · 9 mandatory
₹500
GE KHUMBATHANG
₹97,120
Yes
11 Aug 2026
25 Jun 2026
22 Jul 2026
25 Jun 2026
21 Jul 2026
2 Jul 2026
25 Jun 2026 - 1 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and fixing LLDPE septic tank having advanced version of septic tank of capacity of 2000 liter. Septic should have two zones, the first zone is as septic zone for sludge stabilization by anaerobic digestion and second zone as the pall ring media zone which can retain micro-organism long enough to digest the organic waste resulting in 70% of BOD reduction from final output. The septic tank need to be provided with inlet & outlet pipe of 100mm dia, 50mm dia vent pipe, internal piping, manhole cover of 400mm dia including providing Bio Septic tank Bacteria @ 3 Kg per tank for 1 Year (750g in every 3 months). The rates of bio septic tank bacteria is included in the unit quoted rates.
Note: List of locs for installation of septic tanks at site:-
Khaltsi-02, Lamayuru-01, A'thang-03, H'Thang-01, Biamah-02, handanbrok-01, Ganashok-01, Batalik-01 | 17 | Each | 7 | ₹119 |
| 2 | Supply and fixing LLDPE septic tank having advanced version of septic tank of capacity of 5000 liter. Septic should have two zones, the first zone is as septic zone for sludge stabilization by anaerobic digestion and second zone as the pall ring media zone which can retain micro-organism long enough to digest the organic waste resulting in 70% of BOD reduction from final output. The septic tank need to be provided with inlet & outlet pipe of 100mm dia, 50mm dia vent pipe, internal piping, manhole cover of 400mm dia including providing Bio Septic tank Bacteria @ 6 Kg per tank for 1 Year (1.50 kg in every 3 months). The rates of bio septic tank bacteria is included in the unit quoted rates.
Note: List of locs for installation of septic tanks at site:-
Khaltsi-02, Lamayuru-01, A'thang-03, H'Thang-01, Biamah-02, handanbrok-01, Ganashok-01, Batalik-01 | 7 | Each | 7 | ₹49 |
| 3 | M&L for earth work in excavation by mechanical means n exc 1.5 mtr depth (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-incharge | 201.15 | Cum | 7 | ₹1,408.05 |
| 4 | M&L for earth work in excavation by mechanical means exc 1.5 mtr and n exc 3.0 depth (Hydraulic excavator) means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-incharge | 26.32 | Cum | 7 | ₹184.24 |
| 5 | M&L for exavation over areas in hard dense soil, not exceeding 1.5 m deep and getting out complete all as specified & directed . | 279.54 | Cum | 7 | ₹1,956.78 |
| 6 | M&L for exavation over areas in hard dense soil, exceeding 1.5 m and not exceeding 3.00 m deep and getting out complete all as specified & directed . | 35.09 | Cum | 7 | ₹245.63 |
| 7 | M&L for excavation in trenches n.exc 1.5m wide and n.exc 1.5m in depth for foundations etc or for shafts, wells cesspits, manholes, pier holes etc n.exc 10 Sqm on plan and n.exc 1.5m in depth and getting out in hard dense soil complete all as specified and directed. | 57.6 | Cum | - | - |
| 8 | Returning filling in, including spreading leveling, watering and well ramming in layers not exceeding 25cm in soft/loose soil complete all as specified and directed. | 141.11 | Cum | - | - |
| 9 | Removal of excavated soil to a distance exc 50 and n exc 500m and depositing where directed at a level n.exc. 1.5 m above the starting point complete all as specified | 231.12 | Cum | - | - |
| 10 | M&L for PCC (1:4:8) type D-2 using 40mm graded stone aggregate as in foundation etc, complete all as specified & directed | 21.85 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
Tenderdocus07.pdf
Tender Documents • 0.93 MB
BOQ_867194.xls
BOQ • 2.99 MB
datecorrige07.pdf
PDF • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .