| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.4 LAccepted-Finance | ₹5.4 L | 1 | Accepted-Finance Accept |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | RAGUNATHAN L1 | V.Murthy L2 |
|---|---|---|---|---|---|
| 1.00Part I : Providing Ceiling Plastering and Painting Work to PUMS, Three Class Room Nallambakkam Village in Nallambakkam Panchayat Est: 1.43 Lakhs | |||||
| 2.00 | Chipping of concrete and roughening the surface etc. all complete | 194.15 | Sqm | 42 ₹8,154.3 | 50 ₹9,707.5 |
| 3.00 | Providing and applying Emulsion paint finish of approved make & shade in two coats over a coat of approved primer and 2 coats of patty to give an even shade as per manufacturer's instruction to the internal plastered surfaces including preparation of surfaces, | 194.15 | Sqm | 263 ₹51,061.45 | 280 ₹54,362 |
| 4.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 194.15 | Sqm | 308 ₹59,798.2 | 320 ₹62,128 |
| 5.00Part II : Providing Colour Washing and Platform Works to 60000 lit OHT at Nallambakkam in Nallambakkam Panchayat in Kattankolathur Panchayat Union Est: 1.66 Lakhs | |||||
| 6.00 | Chipping in the RCC area including all labour Charges etc. | 4.26 | Sqm | 43 ₹183.18 | 50 ₹213 |
| 7.00 | Plastering with CM 1:5 12mm thick including all labour Charges etc. | 4.26 | Sqm | 282 ₹1,201.32 | 300 ₹1,278 |
| 8.00 | Chipping in the RCC area including all labour Charges etc. | 12.79 | Sqm | 43 ₹549.97 | 50 ₹639.5 |
| 9.00 | Plastering with CM 1:3 10mm thick including all labour Charges etc. | 13.07 | Sqm | 325 ₹4,247.75 | 400 ₹5,228 |
| 10.00 | Supply and fixing of 65mm dia GI pipe etc complete. | 6 | Rm | 605 ₹3,630 | 610 ₹3,660 |
Tender Value
₹7.5 L
EMD Value
₹8,000
Closing Date
27 Feb 2026, 3:00 pmClosed
The Block Development Officer BP Kattankolathur
The BDO BP Kattankolathur
Providing Rural Building Maintanence Works to Nallambakkam Panchayat 5 Nos in Kattankolathur Panchayat Union. Having Package No 14/2025-26 in Kattankolathur Panchayat Union
2026_RDTN_666935_1
2443/2025/A2 dt 20/2/26
Open Tender
Civil Works - Buildings
Kattankolathur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,000
Yes
6 May 2026
26 Feb 2026
27 Feb 2026
26 Feb 2026
27 Feb 2026
26 Feb 2026
Part I : Providing Ceiling Plastering and Painting Work to PUMS, Three Class Room Nallambakkam Village in Nallambakkam Panchayat Est: 1.43 Lakhs
Chipping of concrete and roughening the surface etc. all complete
Providing and applying Emulsion paint finish of approved make & shade in two coats over a coat of approved primer and 2 coats of patty to give an even shade as per manufacturer's instruction to the internal plastered surfaces including preparation of surfaces,
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Part II : Providing Colour Washing and Platform Works to 60000 lit OHT at Nallambakkam in Nallambakkam Panchayat in Kattankolathur Panchayat Union Est: 1.66 Lakhs
Chipping in the RCC area including all labour Charges etc.
Plastering with CM 1:5 12mm thick including all labour Charges etc.
Chipping in the RCC area including all labour Charges etc.
Plastering with CM 1:3 10mm thick including all labour Charges etc.
Supply and fixing of 65mm dia GI pipe etc complete.
Supplying and painting the walls with two coats of cement paint over one coat of cement primer as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work).
Providing OHT GI Pipe painting including cost of materials and labour charges etc.
Providing OHT MS Ladder painting including cost of materials and labour charges etc
Providing Polymer coating (water proof coating) for Over Head tank bottom with following specification and the surface shall be cleaned to remove all dust, foregin,matters lose material or any other deposits of contamination by rubbing with wire brush etc complete.
Part III : Providing Colour Washing and Platform Works to 60000 lit OHT at Periya Colony in Nallambakkam Panchayat in Kattankolathur Panchayat Union Est: 1.70 Lakhs
Chipping in the RCC area including all labour Charges etc.
Plastering with CM 1:5 12mm thick including all labour Charges etc.
Chipping in the RCC area including all labour Charges etc.
Plastering with CM 1:3 10mm thick including all labour Charges etc.
Supply and fixing of 65mm dia GI pipe etc complete.
Supplying and painting the walls with two coats of cement paint over one coat of cement primer as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work).
Providing OHT GI Pipe painting including cost of materials and labour charges etc.
Providing OHT MS Ladder painting including cost of materials and labour charges etc
Providing Polymer coating (water proof coating) for Over Head tank bottom with following specification and the surface shall be cleaned to remove all dust, foregin,matters lose material or any other deposits of contamination by rubbing with wire brush etc complete.
Part IV : Providing Colour Washing and Platform Works to 30000 lit OHT at Gandhi nagar in Nallambakkam Panchayat in Kattankolathur Panchayat Union Est: 1.17 Lakhs
Chipping in the RCC area including all labour Charges etc.
Plastering with CM 1:5 12mm thick including all labour Charges etc.
Chipping in the RCC area including all labour Charges etc.
Plastering with CM 1:3 10mm thick including all labour Charges etc.
Supply and fixing of 65mm dia GI pipe etc complete.
Supplying and painting the walls with two coats of cement paint over one coat of cement primer as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work).
Providing OHT GI Pipe painting including cost of materials and labour charges etc.
Providing OHT MS Ladder painting including cost of materials and labour charges etc
Providing Polymer coating (water proof coating) for Over Head tank bottom with following specification and the surface shall be cleaned to remove all dust, foregin,matters lose material or any other deposits of contamination by rubbing with wire brush etc complete.
Part V : Providing Colour Washing and Platform Works to 60000 lit OHT at Melrosapuram in Nallambakkam Panchayat Est: 1.57 Lakhs
Chipping in the RCC area including all labour Charges etc.
Plastering with CM 1:5 12mm thick including all labour Charges etc.
Chipping in the RCC area including all labour Charges etc.
Plastering with CM 1:3 10mm thick including all labour Charges etc.
Supplying and painting the walls with two coats of cement paint over one coat of cement primer as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work).
Providing OHT GI Pipe painting including cost of materials and labour charges etc.
Providing OHT MS Ladder painting including cost of materials and labour charges etc
Providing Polymer coating (water proof coating) for Over Head tank bottom with following specification and the surface shall be cleaned to remove all dust, foregin,matters lose material or any other deposits of contamination by rubbing with wire brush etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}12%
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_801183.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_801183.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid