| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | ₹4.8 L | L1 | Accepted-AOC WO ISSUED |
| 2 | L2₹4.9 L+₹5,911.79 (1.22%)Rejected-Finance | ₹4.9 L+₹5,911.79 (1.22%) | L2 | Rejected-Finance NOT L1 BIDDER |
| 3 | L3₹5.0 L+₹12,767.48 (2.64%)Rejected-Finance | ₹5.0 L+₹12,767.48 (2.64%) | L3 | Rejected-Finance NOT L1 BIDDER |
| 4 | L4₹5.0 L+₹13,264.27 (2.75%)Rejected-Finance | ₹5.0 L+₹13,264.27 (2.75%) | L4 | Rejected-Finance NOT L1 BIDDER |
| 5 | L5₹5.0 L+₹18,728.95 (3.88%)Rejected-Finance | ₹5.0 L+₹18,728.95 (3.88%) | L5 | Rejected-Finance NOT L1 BIDDER |
Tender Value
₹5.0 L
EMD Value
₹9,936
Closing Date
7 Aug 2026, 2:00 pmClosed
AE
138 AJC BOSE ROAD KOLKATA 14
NRSMCH Centenary Building Basement Fixing of Joist under RCC beam to maintain the structural stability along with ordinary repair work of damaged ceiling beam during FY 20262027
2026_WBPWD_5017466_5
WBPWD/AE/NRSH/NIT-07/2026-27
Open Tender
CIVIL WORKS
Percentage
10 days
NRSMC and H
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,936
Yes
3 Sept 2026
28 Jul 2026
10 Aug 2026
28 Jul 2026
7 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead | 25.94 | SQM | 54.65 | ₹1,417.62 |
| 2 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge 50 mm average thickness | 43.82 | SQM | 256.35 | ₹11,233.26 |
| 3 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 265.72 | SQM | 25.15 | ₹6,682.86 |
| 4 | Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge Bars upto 12 mm diameter | 876.4 | M | 8.25 | ₹7,230.3 |
| 5 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of EngineerIn-charge complete in all respect. Epoxy bonding adhesive having coverage 2.20 sqm/kg of
approved make | 43.82 | SQM | 285.2 | ₹12,497.46 |
| 6 | Providing, mixing and applying SBR polymer (of approved make) modified
Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with
polymer minimum 2% by wt. of cement used) as per specifications and
directions of Engineer-in-charge Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with
a blunt metal instrument and/or the 75 mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2). 50 mm average thickness in 3 layers. | 43.82 | SQM | 1,174.7 | ₹51,475.35 |
| 7 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. With cement mortar 1:4 (1cement: 4 coarse sand) | 69.76 | SQM | 560.5 | ₹39,100.48 |
| 8 | Structural steel work riveted, bolted or welded in built up sections, trusses
and framed work, including cutting, hoisting, fixing in position and applying
a priming coat of approved steel primer all complete | 1,795.65 | KG | 133.7 | ₹2,40,078.41 |
| 9 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 122.9 | SQM | 156.05 | ₹19,178.55 |
| 10 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gram/litre, of approved manufacturer and of required shade and colour all complete to achieve even shade and colour :
13.41.1 New work (two or more coats) over and including water
thinnable priming coat with cement primer having VOC content
less than 50 gram/litre | 69.76 | SQM | 185.65 | ₹12,950.94 |
stage.html
html • 0.11 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
Tendernotice_2.pdf
PDF • 0.92 MB
BOQ_5087684.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .