Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹59,306.69Admitted-Finance | -40.70% | ₹59,306.69 | L1 | Admitted-Finance |
| 2 | L2₹87,889.92Admitted-Finance | -12.12% | ₹87,889.92 | L2 | Admitted-Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
4 Feb 2026, 6:00 pmClosed
Er. Fayaz Ahmed Sheikh
EXECUTIVE ENGINEER REW OFFICE RAMBAN
As per NIT
2026_RDPR_301491_1
NIT NO 86 OF REW RAMBAN 2025 26 UNDER HEAD CDF
Open Tender
Civil Works
30 days
RAMBAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹2,000
5 Feb 2026
27 Jan 2026
5 Feb 2026
27 Jan 2026
4 Feb 2026
27 Jan 2026
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :
Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
Dry stone pitching (Any thickness) including cost of stones on horizontal
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Dry random rubble masonry with hard stone in foundation and plinth: With bond stone.
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases for columns
Carriage of cement from source to site by mechanical transport or animal transport or by head load
Carriage of Sand from source to site by mechanical transport or animal transport or by head load
Carriage of Stone Aggregates from source to site by mechanical transport or animal transport or by head load
Carriage of Stone from source to site by mechanical transport or animal transport or by head load
CIB( citizen information board) size 2'6''x3'6''x0'9''( complete job)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.09 MB
BOQ_978340.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid