| 1 | L1₹380 CrAdmitted-Finance 2 ARYA NAGAR NARMADA ROAD JABALPUR 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | ₹380 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical 0 NARA MEERUT ROAD MUZAFFARNAGAR UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | - | - | Rejected-Technical Bidder is not meeting the requirement of Bidder Qualification Criteria (Technical). |
| Sl No | Description | Qty | Unit | BHEL L1 |
|---|---|---|---|---|
| 1.00LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Residual Process Design, Detailed Design and Engineering, 3D Modeling, Hazop /Hazid, SIL , preparation and submission of engineering drawings & related documentation including Asbuilt/ Final documentation providing all services and completing the work in all respects as per provision of Bidding Document. Supply of all materials including - procurement services, shop fabrication, third party inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight / air freight and inland freight, custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc., supply of start-up / pre-commissioning / commissioning / mandatory spares,chemicals/consumables/ lubricants (Except Owner supplied chemicals) for first fill and 6 (six) months operation as per tech. specifications. Construction / Erection including loading/unloading of the materials at Contractor’s warehouse, transportation of the materials from Contractor’s workshop / Store to erection site, assembly / sub-assembly of the equipments, erection, installation, testing, Inspection, refrectory, dryout, alkali boilout, pre-commissioning, trial run, commissioning & PGTR, Training to owner personals, handing over to owner inlcluding all disciplines of work and supplly of material as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting, supply of all accessories and materials for erection / testing; supply of all consumables, providing all construction plants, equipments, special tools and tackles; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document. Completion of all works in all respects as per provisions of the Bidding Document and directions of the Engineer-in-Charge, including any other activity of work required to complete the Plant in all respects to make the Plant functional. | ||||
| 1.01 | Lumpsum Price [SP-0] | 1 | Lumpsum | 3,80,00,00,000 ₹380 Cr |
Tender Value
Refer Docs
EMD Value
₹4 Cr
Closing Date
10 Jul 2025, 12:00 pmClosed
Mr. Jaydip Purkayastha-GM(SCM)
EIL GURUGRAM
STEAM GENERATION PACKAGE FOR BINA PETCHEM AND REFINERY EXPANSION PROJECT(BPREP) OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
2025_EIL_854765_1
JP/B957-420-PG-T-7410/1009
Open Tender
Miscellaneous Works
720 days
AS PER TENDER DOCUMENT
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹4 Cr
AS PER TENDER DOCUMENT
31 Oct 2025
28 Mar 2025
11 Jul 2025
28 Mar 2025
10 Jul 2025
7 May 2025
28 Mar 2025 - 24 Jun 2025
8 Apr 2025
Amount
LUMPSUM TURNKEY BASIS WITH SINGLE POINT RESPONSIBILITY INCLUDING BUT NOT LIMITED TO THE FOLLOWING ACTIVITIES OF WORKS: Residual Process Design, Detailed Design and Engineering, 3D Modeling, Hazop /Hazid, SIL , preparation and submission of engineering drawings & related documentation including Asbuilt/ Final documentation providing all services and completing the work in all respects as per provision of Bidding Document. Supply of all materials including - procurement services, shop fabrication, third party inspection, expediting, project management, planning, scheduling, monitoring, transportation, all loading and unloading; payable in the Contractor’s country; insurance in Contractor’s scope; all type of freights including ocean freight / air freight and inland freight, custom clearance, all type of handling including port handling, stevedoring, handling at worksite etc., supply of start-up / pre-commissioning / commissioning / mandatory spares,chemicals/consumables/ lubricants (Except Owner supplied chemicals) for first fill and 6 (six) months operation as per tech. specifications. Construction / Erection including loading/unloading of the materials at Contractor’s warehouse, transportation of the materials from Contractor’s workshop / Store to erection site, assembly / sub-assembly of the equipments, erection, installation, testing, Inspection, refrectory, dryout, alkali boilout, pre-commissioning, trial run, commissioning & PGTR, Training to owner personals, handing over to owner inlcluding all disciplines of work and supplly of material as per Tender requirements such as structural, civil, mechanical, piping, electrical, instrumentation, insulation, painting, supply of all accessories and materials for erection / testing; supply of all consumables, providing all construction plants, equipments, special tools and tackles; providing supervisory personnel, tradesman skilled / unskilled labour; insurance in Contractor’s scope; completing all works in all respects as per provisions of Bidding Document. Completion of all works in all respects as per provisions of the Bidding Document and directions of the Engineer-in-Charge, including any other activity of work required to complete the Plant in all respects to make the Plant functional.
Lumpsum Price [SP-0]
Description of Work / Item(s)
Amount
Lump sum Engineering price for completion of scope of work as per bidding document witch includes following but not limited to: RESIDUAL PROCESS DESIGN , DETAILED ENGINEERING preparation of Datasheets, Smart plant P&IDs, PFDs, specifications for procurement, GAD, & Layouts, 3D Model, Hazop /Hazid, SIL, engineering fabrication drawings, Procurement & Construction schemes, Control Logics, Cause & Effect diagrams, Electrical System studies, Statutory approval from various Statutory state & central Government bodies, approval of drawings &documents from OWNER/EIL, submission of Final Technical documents, AS BUILT Documents and 3D Model, Pre-commissioning, Commissioning and Operating manuals for all units including packages as per Bidding Document requirements)
Description of Work / Item(s)
Amount
Lumpsum price for supply portion for completion of scope of work as per bidding document wich includes following but not limited to: Procurement, supply, Third Party Inspection, Transportation,Port handling, Shop fabrication, Assembly, Testing of all items, equipment’s, Components, Materials, bought out items, Procurement of raw materials and sub-ordered equipment, shop fabrication/assembly, inspection, Charges for Third party inspection agency(TPIA), testing, supply of all commissioning and mandatory spares, consumables, lubricants/ chemicals (Except Owner supplied chemicals) for first fill and 6 (six) months operation as per tech. specifications ,special tools and tackles , receipt, accounting, storing & preservation of materials as required for work as per Bidding Document per Bidding Document requirements
Description of Work / Item(s)
Amount
Lump sum price for construction portion as per requirement detailed out in various section of bidding document witch includes following but not limited to: Construction, installation completion of work in all respects for Package including required Cranes, Scaffolding, temporary barricading, Transportation and site handling of material/equipments, supply of consumables, tools and tackles, field engineering services, Receipt, storage, conservation, preservation of FIM and contractor supplied items etc. Fabrication, construction, assembly, erection at site for all piping, civil, structural, architectural, mechanical, electrical and instrumentation works within battery limit, refractory, insulation, coating, painting, testing, etc. providing all temporary works/structures and equipment for completion, obtaining statutory approvals, pre-commissioning, commissioning, performance guarantee test runs, Training to Owner personals, completing all the work in all respects to make system smooth, operable and handing over as per Bidding Document requirements and instructions of the Engineer In Charge
Description of Work / Item(s)
Amount
GUARANTEED UTILITIES AS PER BIDDING DOCUMENT AND SUBSEQUENT AMENDMENT, IF ANY
Total Guaranteed Fuel (RLNG) consumption for Normal Guarantee Operation
Turndown of UB Required Turndown: ≤ 20% MCR on gaseous fuels delivering VHP steam at 108.7 kg/cm2(g) and 510 deg. C at package battery limit
Description of Work / Item(s)
Amount
5 (Five) years Post Warranty Comprehensive Annual Maintenance Contract (PWCAMC) for Package Control System as per technical portion of bidding document & as per preamble to SOP
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
Description of Work / Item(s)
Amount
5 (Five) years Post Warranty Comprehensive Annual Maintenance Contract (PWCAMC) for UPS, DC charger, SAS, VFDs/Soft starters (except air fin coolers VFDs), Thyristor control Panel (TCP)as per technical portion of bidding document & as per preamble to SOP
First year after expiry of defect liability
Second year after expiry of defect liability
Third year after expiry of defect liability
Fourth year after expiry of defect liability
Fifth year after expiry of defect liability
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid