Loading…
Loading…
Tender Value
₹30.1 L
EMD Value
₹60,259
Closing Date
20 Jul 2026, 3:00 pm4d left
EXECUTIVE ENGINEER, CD-XVIII
L.M. BUND OFFICE COMPLEX, GEETA COLONY, DELHI-110031.
Demolition and Reconstruction of boundary wall of Ambedkar Park at Joshi colony, Vishwas Nagar Constituency (AC-59).
2026_IFC_295161_1
EECDXVIII/AB/2026-27/NIT/13
Open Tender
Civil Works
Percentage
90 days
L.M. BUND OFFICE COMPLEX
Please refer tender documents.
8 documents required · 8 mandatory
₹0
₹60,259
10 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 41 | Cum | 2,064.71 | ₹84,653.11 |
| 2 | Disposal of moorum/ building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-Charge. | 70 | MT | 260.57 | ₹18,239.9 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 49 | Cum | 177.89 | ₹8,716.61 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 5 | Cum | 6,826.92 | ₹34,134.6 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 73 | Sqm | 738.01 | ₹53,874.73 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 16 | Cum | 9,065.56 | ₹1,45,048.96 |
| 7 | Brick work with common burnt clay F.P.S (non modular) brick of class designation 7.5 in foundation & plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 37 | Cum | 9,353.89 | ₹3,46,093.93 |
| 8 | Brick work with common burnt clay F.P.S (non modular) brick of class designation 7.5 in foundation & plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 37 | Cum | 9,125.89 | ₹3,37,657.93 |
| 9 | 12 mm cement plaster of mix :1:4 (1 cement: 4 coarse sand) | 264 | Sqm | 358.13 | ₹94,546.32 |
| 10 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 61 | Sqm | 171.47 | ₹10,459.67 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.09 MB
NIT.pdf
Tender Documents • 1.78 MB
BOQ_392697.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid