Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC | L1 | Accepted-AOC as per upload | |
| 2 | L2₹14.6 L+₹29,933.38 (2.10%)Accepted-AOC | L2 | Accepted-AOC as per upload | |
| 3 | L3₹14.7 L+₹40,110.87 (2.81%)Accepted-AOC | L3 | Accepted-AOC as per upload | |
| 4 | L4₹14.7 L+₹47,840.88 (3.36%)Accepted-AOC | L4 | Accepted-AOC as per upload | |
| 5 | L5₹16.1 L+₹1.8 L (12.7%)Accepted-AOC 00 0 FATEHPUR NEAR SAHARA FARM BAKKAS LUCKNOW LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | L5 | Accepted-AOC as per upload |
Tender Value
₹18.5 L
EMD Value
₹37,000
Closing Date
10 Mar 2023, 2:00 pmClosed
EXECUTIVE ENGINEER SNK 1 BANSI
EXECUTIVE ENGINEER SNK 1 BANSI
Construction VRB at Km 7.690 Mehdawal Dy
2023_UPIDC_779015_6
02/EE/2022-23
Open Tender
Civil Works
Item Rate
60 days
SANTKABIR NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,040
₹37,000
Yes
24 Jun 2023
1 Mar 2023
10 Mar 2023
1 Mar 2023
10 Mar 2023
1 Mar 2023
Amount
E/W in excavation of foundation in all type of soil including lead up to 30m lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper complection of work including cost of all material, T&P, Labour taxes etc. but excluding GST
Laying C.C M-10 (1:3:6) in foundation with cement ,coarse sand of F.M not less then 2.00 and hard stone ballast (20.00-40.00mm size)(kabrai crushed stone & Hamirpur coarse sand) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour taxes etc. but excluding GST
Laying C.C, M-20 (1:1.5:3) in foundation with cement ,coarse sand of FM not less then 2.00 and hard stone ballast (4.75-20mm size) (kabrai crushed stone & Orai coarse sand) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding of centering and shuttering required for proper completion of work including cost of all material, T&P, Labour taxes etc. but excluding GST
Laying R.C.C, M-25 (1:1:2) with cement ,coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm, (kabrai crushed stone & Hamirpur coarse sand) including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour taxes etc. but excluding GST
Centering & Shuttering for C.C/R.C.C work with all lead & lift required for proper completion of work including cost of all material and scafolading labour, T&P taxes etc. but excluding GST
Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wire with required for proper compltion of work including cost of all material, labour, T&P taxes etc. but excluding GST
S/F Draiange spout pipe 100mm dia in R.C.C slab for proper complition of work including cost of all material, labour, T&P taxes etc. but excluding GST
Laying and fixing joint filler bord 18mm thick as specied location in different position required for proper comletion of work including cost of all material, labour, T&P taxes etc. but excluding GST
E/W in making Ramp in all type of soil including lead up to 1.00 Km. lift up to 1.50m with manual compation and dressing required for proper compection of work including cost of all T&P, labour taxes etc. but excluding GST
Brick on edge soling on approch Road Ramp with preparation of sub grade and filling joints with local earth, required for proper complection of work, including cost of all material, labour, T&P taxes etc. but excluding GST
E/W in making Ramp/canal section 25m U/s & D/s of VRB in all type of soil including lead up to 1.00 Km. lift up to 1.50m with manual compation and dressing required for proper compection of work including cost of all T&P, labour taxes etc. but excluding GST
Krishna Murari Contruction
M/S ASHA CONSTRUCTION
M/S DEO CONSTRUCTION
M/S ARYA ENTERPRISES
M/S R N CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .