Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Fee/PreQual/Technical/Finance | ₹2.0 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.0 CrAdmitted-Fee/PreQual/Technical/Finance | ₹2.0 Cr | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M/s Seden Enterprise L2 | M/s WW Enterprise L1 |
|---|---|---|---|---|---|
| 1.00SH: Formation Cutting - 2.09 KM | |||||
| 2.00 | Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres | 13,277.67 | Cum. | 242.2 ₹32,15,851.67 | 242.1 ₹32,14,523.91 Lowest |
| 3.00 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not
Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | 46,111.29 | Cum. | 354.3 ₹1,63,37,230.05 Lowest | 354.3 ₹1,63,37,230.05 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
2 Apr 2026, 12:00 pmClosed
Executive Engineer
O/o EE (UD), Deptt. of Urban Affairs, Longding Division, Longding
Construction of Internal Township Road at Zibo colony Longding
2026_APUDH_3323_1
EE/UD/LDG/ITR/2026
Open Tender
Civil Works
Item Rate
365 days
Longding
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
EE (UD) Longding
₹2.0 L
6 Apr 2026
26 Mar 2026
2 Apr 2026
26 Mar 2026
2 Apr 2026
26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH: Formation Cutting - 2.09 KM | |||||
| 2Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres | |||||
| 3Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres ) | |||||
stage.html
html • 0.02 MB
finance_3520.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
NIT_Road_Zibo.pdf
Tender Documents • 3.27 MB
BOQ_3520.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].