Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-Finance 14 D CHANDI CHARAN GHOSH ROAD KOLKATA 700008 | KOLKATA | WEST BENGAL | 700008 | L1 | Accepted-Finance accepted | |
| 2 | L2₹25.8 L+₹38,526.70 (1.52%)Rejected-Finance 18 1 CHANDI CHARAN GHOSH ROAD BARISHA KOLKA 700008 | KOLKATA | WEST BENGAL | 700008 | L2 | Rejected-Finance Rejected | |
| 3 | l3₹25.9 L+₹50,875 (2.00%)Rejected-Finance A3 7 B NEW AKRA STATION ROAD BYE LANE 2 P O JAGANNATH NAGAR P S MAHESHTALA PIN CODE 700140 | 24 PARAGANAS SOUTH | WEST BENGAL | 700140 | l3 | Rejected-Finance Rejected | |
| 4 | Rejected-Technical 5A GOBINDA SARKAR LANE KOLKATA 700 012 | KOLKATA | WEST BENGAL | 700012 | - | Rejected-Technical Rejected | |
| 5 | Rejected-Technical N A | - | Rejected-Technical Rejected |
Tender Value
₹24.7 L
EMD Value
₹49,393
Closing Date
13 Mar 2026, 11:30 amClosed
Sri. Sukdeb Halder Executive Enginer KCD PWD
45 Ganesh Chandra Avenue
Urgent repairing and restoration of damaged roof of Eastern and Western side toilet of old building, replacement of 4 nos. old GI Tanks by PVC tanks, repairing works at Kitchen, Land Development and other miscellaneous works at the premises of......
2026_WBPWD_1014020_1
WBPWD/EE/KCD/NIeT27/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
45 Ganesh Chandra Avenue
Please refer Tender documents.
3 documents required · 3 mandatory
₹49,393
Yes
27 Mar 2026
24 Feb 2026
16 Mar 2026
27 Feb 2026
13 Mar 2026
27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling terraced roof in ground floor roof
(including floor finish, if any.) taking out carefully tiles with beams, joists, tees or burgahs covering floor below, sorting and stacking sevicable materials at site and removing rubbish as directed within a lead of 75 m.
(a) In Ground Floor including roof. | 14.93 | cum | 288.42 | ₹4,306.11 |
| 2 | Labour for lowering and stacking after dismantling in parts R.S.
joists, channels, angles, tees, plates etc.complete as directed. | 5.62 | qntl | 303.91 | ₹1,707.97 |
| 3 | (e) Extra for staging beyond 4 m in any floor (Mode of measurement: area in
plan x mean height of staging upto soffit of shuttering above initial 4 m) | 130.41 | cum | 72.7 | ₹9,480.81 |
| 4 | Brick work with 1st class bricks in cement mortar (1:4)
(b) In superstructure, ground floor | 15.66 | cum | 6,954.63 | ₹1,08,909.51 |
| 5 | Controlled Cement concrete with well graded stone chips (20 mm nominal
size) excluding shuttering and reinforcement with complete design of concrete
as per IS : 456 and relevant special publications, submission of job mix
formula after preliminary mix design after testing of concrete cubes as per
direction of Engineer-in charge. Consumption of cement will not be less than
300 Kg of cement with Super plasticiser per cubic meter of controlled
concrete but actual consumption will be determined on the basis of
preliminary test and job mix foumula. In ground floor and foundation.[using
concrete mixture]
M 25 Grade
(i) Pakur Variety | 9.27 | cum | 7,511.67 | ₹69,633.18 |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures
including distribution bars, stirrups, binders etc initial straightening and
removal of loose rust (if necessary), cutting to requisite length, hooking and
bending to correct shape, placing in proper position and binding with 16
gauge black annealed wire at every intersection, complete as per drawing
and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL | 1.26 | MT | 65,447.82 | ₹82,202.46 |
| 7 | Hire and labour charges for shuttering with centering and necessary staging
upto 4 m using approved stout props and thick hard wood planks of approved
thickness with required bracing for concrete slabs, beams and columns,
lintels curved or straight including fitting, fixing and striking out after
completion of works (upto roof of ground floor)
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering
in any concrete work | 66.09 | sqm | 439.77 | ₹29,064.4 |
| 8 | Stripping off worn out plaster and raking out
joints of walls, celings etc. upto any height and in any floor including removing rubbish within a
lead of 75m as directed. | 251.62 | sqm | 22.64 | ₹5,696.68 |
| 9 | a) Applying 2 coats of Acylic Polymer Modified Paint (Equivalent to MASTER CRETE M-81 of Choksey or similar specified product) having water proofing cum bonding properties for specific use of water prone area to prevent leakage underneath by mixing in proportion (1 liquid compound : 2 cement) as per Manufacturer's specification (cement to be supplied by the department) | 251.62 | sqm | 220 | ₹55,356.4 |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface]
(i) With 1:6 cement mortar
(b) 20 mm thick plasterground floor | 295.63 | sqm | 204.57 | ₹60,477.03 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_2490545.xls
BOQ • 0.29 MB
2911.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .