Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹20,040
Closing Date
22 Jun 2026, 5:00 pm6d left
Superintending Engineer
Municipal Corporation Patiala
Repair and renovation of Bda Arai Majra Dharamshala ward no 36 Est Cost Rs. 10.02 lacs dt 22/23.06.2026
2026_DLG_169725_1
MCP/2026/109-111/23
Open Tender
Civil Works - Buildings
93 days
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹20,040
Yes
12 Jun 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling concrete (Reinforced cement concrete) | 13.43 | cum | 2,321.88 | ₹31,179 |
| 2 | Loading of malba by mechanical means (Stone (building or pitching) Sand, Earth, Fly
Ash, Bajri, Shingle, Spalls, Brick bats, Brick
ballast and Stone metal.) | 13.43 | cum | 20.52 | ₹275.55 |
| 3 | Removal Earth,Surkhi, Sand, Earth, Fly Ash, Bajri, Ballast, Stone upto 5 km
boulders, Kankar and building rubbish, Earth. | 13.43 | cum | 196.38 | ₹2,637 |
| 4 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of
trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 32.6 | cum | 191.74 | ₹6,251 |
| 5 | Cement concrete 1:8:16 With stone aggregates 40mm gauge mixing by mechanical means using concrete
mixer volumetric type | 4.08 | cum | 4,048.64 | ₹16,499 |
| 6 | Reinforced cement concrete M-25
mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator but excluding steel
reinforcement centring and shuttering in
foundation and plinth | 11.52 | cum | 6,317.45 | ₹72,765 |
| 7 | Reinforced cement concrete M-25
mechanically batch mixed using batch type
concrete mixer as per IS:1791 and vibrated
by needle vibrator but excluding steel
reinforcement centring and shuttering in
superstructure. | 17.23 | cum | 7,487.86 | ₹1,28,998 |
| 8 | First class burnt brick work laid in cement sand
mortar 1:4 in foundation and plinth | 0.48 | cum | 5,381.49 | ₹2,570 |
| 9 | Shuttering for faces of concrete foundations and foundation
beam & plinth beam (vertical or battering) | 31.6 | sqm | 221.24 | ₹6,991 |
| 10 | Centering and shuttering for columns (Square or rectangular
or poly gonal in plain) | 56.85 | sqm | 502.53 | ₹28,571 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_345524.xls
BOQ • 0.35 MB
Generaltenderconditions.pdf
Tender Documents • 4.57 MB
COPYSOPnotification.pdf
Tender Documents • 0.21 MB
Etenderlist.pdf
Tender Documents • 1.11 MB
Download all tender documents and submit your bid