Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹93,101.27Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹97,021.33+₹3,920.06 (4.21%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹97,511.33+₹4,410.06 (4.74%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹98,000
EMD Value
₹2,940
Closing Date
25 Jul 2026, 3:00 pmClosed
Executive Eng REW Kupwara
Executive Eng REW Kupwara
CONST OF CULVERT HABIBUALLAH LONE AND OTHERS AT LASTIYAL WARD NO 6
2026_RDPR_315510_58
NIT NO 42 OF 2026-27 KALAROOSE ADF
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹2,940
1 Aug 2026
13 Jul 2026
25 Jul 2026
13 Jul 2026
25 Jul 2026
13 Jul 2026
13 Jul 2026 - 13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches upto 1.5 m depth i/c disposal | - | Cum | - | - |
| 2 | P/l of stone soling / RBM including all carriages. | - | Cum | - | - |
| 3 | Providing and Laying cement conc. of specified grade M 7.5 (1:4:8) mix stone agg size 40mm. Including all carriages /head load | - | Cum | 1 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:3:6 using 20mm nominal size aggregate | - | Cum | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete in 1:1.5:3 including curing but excluding the cost of centring and shuttering. | - | Cum | - | - |
| 6 | Reinforcement of RCC work including cutting strighting fixing in position all complete job | 1 | Qtls | - | - |
| 7 | Centring and shuttering incld strutting propping etc and removal of formwork | - | Sm | - | - |
| 8 | Carriage of material by M/T | - | Cum | - | - |
| 9 | Add Provision for CIB<Photographs | - | No. | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_1023938.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .