| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC SAROJA CONTRACTOR SENJI TAMIL NADU TN | ₹11.7 L | L1 | Accepted-AOC l1 |
| 2 | L2₹11.7 LRejected-AOC KRISHNAGIRI | TAMIL NADU | 635001 | ₹11.7 L | L2 | Rejected-AOC l2 |
| Sl No | Description | Qty | Unit | Saroja L1 | R RAJENDIRAN L2 |
|---|---|---|---|---|---|
| 1.00Repairs to Panchayat Union Middle School Building @ Karai Panchayat | |||||
| 1.01 | Chipping the wall plastering and roughening the surface including the cost and conveyance of all materials and cost of all labour charges etc., complete., | 1.05 | m2 | 11.22 ₹11.78 | 11.22 ₹11.78 |
| 1.02 | Pointing Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | 172.91 | M3 | 367.21 ₹63,494.28 | 367.21 ₹63,494.28 |
| 1.03 | Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete. | 1.05 | M3 | 282.72 ₹296.86 | 282.72 ₹296.86 |
| 1.04 | Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete. | 326.6 | m2 | 205.81 ₹67,217.55 | 205.81 ₹67,217.55 |
| 1.05 | Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete. | 358.87 | m2 | 262.48 ₹94,196.20 | 262.48 ₹94,196.20 |
| 1.06 | Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete. | 46.71 | M3 | 159.23 ₹7,437.63 | 159.23 ₹7,437.63 |
| 1.07 | Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete. | 31.61 | m3 | 156.84 ₹4,957.71 | 156.84 ₹4,957.71 |
| 1.08 | Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend. | 10.5 | M3 | 633.77 ₹6,654.59 | 633.77 ₹6,654.59 |
| 1.09 | Construction of Cup board with shutter | 1 | Nos | 18,700 ₹18,700 | 18,700 ₹18,700 |
Tender Value
₹11.9 L
EMD Value
₹11,870
Closing Date
19 Feb 2026, 3:00 pmClosed
BDO BP
Block Development Office, Gingee
Repairs to Panchayat Union Middle School Building at Karai Panchayat, Repairs to Panchayat Union Middle School Building at Konai Panchayat, Repairs to PUE School Building at Somasamuthiram in Konai Panchayat
2026_RDTN_658002_1
Gingee/RBMRS/2025-26
Open Tender
Civil Works
45 days
Gingee
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,870
Yes
1 Mar 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
19 Feb 2026
14 Feb 2026
Repairs to Panchayat Union Middle School Building @ Karai Panchayat
Chipping the wall plastering and roughening the surface including the cost and conveyance of all materials and cost of all labour charges etc., complete.,
Pointing Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete.
Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete.
Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete.
Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete.
Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete.
Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend.
Construction of Cup board with shutter
Provision for Chappel Rack with Verandha
Provison for Electric Arrangement
Provision for Bala Painting charges
Repairs to Window charges
Provision for Name board charges
Provision for Photo charges
Repairs to Panchayat Union Middle School Building @ Konai Panchayat
Chipping the Concrete and roughening the surface including the cost and conveyance of all materials and cost of all labour charges etc., complete.,
Chipping the wall plastering and roughening the surface including the cost and conveyance of all materials and cost of all labour charges etc., complete.,
Weathering Course with Brick Jelly including the cost and conveyance of all materials and cost of all labour charges etc., complete.,
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Paving the floor with kota stone slab of size 600 x 600 of 18 / 20mm (un-polished) in all floors laid in of cement mortor 1:3 (one cement three M.Sand), 20mm thick and pointed with colour cement neatly including polishing with polishing stone and oxalic acid etc., so as to perfectly smooth and glossy and including hire charges for polishing machine and power consumption charges etc. The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete.
Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete.
Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete.
Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete.
Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete.
Provision for Steel Window all charges
Towards the provision of rain water pipe arrangement using 110 mm dia 4Kgf/cm2 P.V.C pipe and P.V.C bend.
Construction of Cup board with shutter
Provision for Chappel Rack with Verandha
Provison for Electric Arrangement
Provision for Bala Painting charges
Repairs to Window charges
Provision for Name board charges
Provision for Photo charges
Repairs to PUE School Building @ Somasamuthiram in Konai Panchayat
Chipping the wall plastering and roughening the surface including the cost and conveyance of all materials and cost of all labour charges etc., complete.,
Plastering in cm 1:5 mix,12mm thick including the cost of all materials, labour charges etc., complete.
Distempering the inner walls with two coats of best quality oil bounded distemper including the cost of all materials, labour charges etc., complete.
Exterior Emulsion two coats with approved quality of snowcem including the cost of all materials conveyances, labour charges etc., complete.
Painting two coats with approved quality of paint over old steel doors and windows including the cost of all materials, labour charges etc., complete.
Painting the black board and low level black board with approved quality of paint including the cost of all materials, labour charges etc., complete.
Construction of Cup board with shutter
Provision for Chappel Rack with Verandha
Provision for Bala Painting charges
Provision for Name board charges
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
BOQ_789360.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid