| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC H 11 HOUSING BOARD UNIT MADHAYANKUTTAI PO METTUR DAM 52 | METTUR DAM | SALEM | TAMIL NADU | ₹5.1 L Quoted ₹4.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹4.8 LRejected-AOC 76 58 A1 KAMARAJ NAGAR SALEM CAMP METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹4.8 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Jose Enterprises L2 | KPRABHAKARAN ENGINEERING CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for checking the condition of 4 Nos. of 50 ton hydraulic jacks its pumps and hoses placing on the rotor arresting fixtures, and holding frame,. Lifting the entire rotor assembly by 10 to12 mm. placing temporary packing supports and arresting the rotor assembly including cost of consumables & hire charges for T&P’s | 1 | No. | 61,440 ₹61,440 | 58,645 ₹58,645 Lowest |
| 2.00 | Charges for dismantling of damaged support bearing assembly, pulling it to the access opening ,removing the grills and supports, lowering it to plat form, taking out damaged bearing, adopter plate etc. Cleaning and devoluting the damaged bearings to stores. Including cost of consumables & hire charges for T&P’s. | 1 | No. | 75,930 ₹75,930 | 72,480 ₹72,480 Lowest |
| 3.00 | Charges for reconditioning of support bearing housing by metal filling grinding and machining to the required size including cost of consumables & hire charges for T&P’s | 1 | No. | 22,820 ₹22,820 | 21,780 ₹21,780 Lowest |
| 4.00 | Charges for cleaning new support bearing (294/500), housing cover plate, adopter plate, all threaded holes in the housing, checking the dimensions and tolerance of the bearing and adopter, assembling of support bearing inner race with adopter plate and support bearing outer race with support bearing housing, lifting the assembling from ‘o’ m to support bearing area, including cost of consumables & hire charges for T&P’s. | 1 | No. | 83,570 ₹83,570 | 79,770 ₹79,770 Lowest |
| 5.00 | Charges for cleaning, inspection and checking the dimension of support trunnion spigot and reconditioning the damaged support trunnion spigot by welding grinding and polishing etc including cost of consumables & hire charges for T&P’s. | 1 | No. | 54,700 ₹54,700 | 52,220 ₹52,220 Lowest |
| 6.00 | Charges for lifting of bearing assembly with adopter plate from 12.5 elevation to 14.5 m elevation pulling the support bearing housing assembly to its original location, cleaning the 28 sets of shim packs, jacking the support bearing assembly and placing the sim packs, checking the support bearing housing assembly with sprit level on four sides and adjusting to the required tolerance level, final tightening of support bearing housing, fixing fasteners with torque wrench to the required level, including cost of consumables & hire charges for T&P’s. | 1 | No. | 86,730 ₹86,730 | 82,790 ₹82,790 Lowest |
| 7.00 | Charges for lowering the complete rotor assembly slowly and checking its level by dial gauge, checking and adjusting the support trunnion with respect to support bearing housing center, releasing the jack pressure, removing and dismantling all the rotor supports packing plates, temporary arresting fixtures and jacks its pumps, houses eic including cost of consumables and T&P ‘s etc. | 1 | No. | 90,010 ₹90,010 | 85,915 ₹85,915 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,400
Closing Date
12 Aug 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit I AOH 2026 27 Emergency works Renewal of damaged support bearing in APH 1A and other related works
2026_EB_692930_1
SE / P and A / SE / M-I / MTPS-I / BM /OT. 02 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
5 days
Mettur Thermal Power Station-I / Mettur Dam
As per the tender Specification
4 documents required · 4 mandatory
₹0
₹4,400
Yes
25 Aug 2026
10 Aug 2026
13 Aug 2026
10 Aug 2026
12 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for checking the condition of 4 Nos. of 50 ton hydraulic jacks its pumps and hoses placing on the rotor arresting fixtures, and holding frame,. Lifting the entire rotor assembly by 10 to12 mm. placing temporary packing supports and arresting the rotor assembly including cost of consumables & hire charges for T&P’s | 1 | No. | - | - |
| 2 | Charges for dismantling of damaged support bearing assembly, pulling it to the access opening ,removing the grills and supports, lowering it to plat form, taking out damaged bearing, adopter plate etc. Cleaning and devoluting the damaged bearings to stores. Including cost of consumables & hire charges for T&P’s. | 1 | No. | - | - |
| 3 | Charges for reconditioning of support bearing housing by metal filling grinding and machining to the required size including cost of consumables & hire charges for T&P’s | 1 | No. | - | - |
| 4 | Charges for cleaning new support bearing (294/500), housing cover plate, adopter plate, all threaded holes in the housing, checking the dimensions and tolerance of the bearing and adopter, assembling of support bearing inner race with adopter plate and support bearing outer race with support bearing housing, lifting the assembling from ‘o’ m to support bearing area, including cost of consumables & hire charges for T&P’s. | 1 | No. | - | - |
| 5 | Charges for cleaning, inspection and checking the dimension of support trunnion spigot and reconditioning the damaged support trunnion spigot by welding grinding and polishing etc including cost of consumables & hire charges for T&P’s. | 1 | No. | - | - |
| 6 | Charges for lifting of bearing assembly with adopter plate from 12.5 elevation to 14.5 m elevation pulling the support bearing housing assembly to its original location, cleaning the 28 sets of shim packs, jacking the support bearing assembly and placing the sim packs, checking the support bearing housing assembly with sprit level on four sides and adjusting to the required tolerance level, final tightening of support bearing housing, fixing fasteners with torque wrench to the required level, including cost of consumables & hire charges for T&P’s. | 1 | No. | - | - |
| 7 | Charges for lowering the complete rotor assembly slowly and checking its level by dial gauge, checking and adjusting the support trunnion with respect to support bearing housing center, releasing the jack pressure, removing and dismantling all the rotor supports packing plates, temporary arresting fixtures and jacks its pumps, houses eic including cost of consumables and T&P ‘s etc. | 1 | No. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_833160.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].