| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹4.6 LAccepted-AOC | 1st | Accepted-AOC 1st lowest | |
| 2 | 2nd₹4.6 L+₹2,469 (0.54%)Rejected-Finance | 2nd | Rejected-Finance 2nd lowest | |
| 3 | 3rd₹4.6 L+₹5,659 (1.24%)Rejected-Finance | 3rd | Rejected-Finance 3rd lowest | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.4 L
Closing Date
30 Dec 2019, 4:00 pmClosed
Sr. Manager (E), Contract Department
Office of the Sr. Manager (E), Contract Department, NHPC Ltd., Loktak Power Station, Komkeirap, Manipur-795124
Repairing of boundary wall at back side of DPH, Loktak
2019_NHPC_525542_1
CD/LOK/4(200)/2019/1933
Open Tender
Civil Works
Works
60 days
NHPC Ltd., Loktak Power Station
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
4 Feb 2020
9 Dec 2019
3 Jan 2020
9 Dec 2019
30 Dec 2019
9 Dec 2019
Amount
Demolition of stone masonry above G.L. upto floor two level i/c stacking of serviceable materials disposal of unserviceable materials within 50m lead.
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. (b) Hard/Dense soil.
Providing and laying cement concrete in foundation and plinth excluding the cost of centering and shuttering. e) 1:2:4 (1 cement : 2 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work i/c. bending, binding and placing in position complete. b) Tor-steel bar.
Providing form works i/c centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ reinforced concrete and plain concrete work in Foundation, footings, bases of columns etc. and mass concrete.
Providing form works i/c centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ reinforced concrete and plain concrete work in. Columns, pillars, posts and struts (square, rectangular or polygon in plan).
Providing form works i/c centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ reinforced concrete and plain concrete work in (i) Sides and soffits of beams, beam haunching, cantilevers, girders, bressumers and lintels not exceeding 1m in depth.
Providing & laying in position specified grade of RCC, excluding the cost of centering, shuttering, finishing and reinforcement- All works upto plinth. 1:1.5:3 (1 cement : 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size)
RCC work in walls (any thickness) including attached pilasters, buttress, plinth and string courses, fillets, columns, pillars, piers, abutments, post and struts upto floor five level excluding the cost of centering-shuttering and reinforcement. 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size).
RCC work in beams, suspended floors, roofs landing, shelves & their support balconies, lintels, beams, plinth beams, girders, bressumers and cantilevers upto floor two level i/c finishing and plastering the exposed surface with cement mortar 1:3 (1cement : 3 Fine sand) of thickness not excluding cost of centering, shuttering and reinforcement. 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm nominal size.
2nd class (local 1st class) brick work in foundation and plinth in cement mortar 1:4 (1 cement: 4 coarse sand).
Half brick masonry 2nd class (Local 1st class) in cement mortar 1.4 (1 cement: 4 coarse sand) in superstructure.
Extra for half brick work in superstructure above plinth level upto 1st floor level.
12mm cement plaster 1:4 (1 cement: 4 fine sand).
Finishing walls with weather shield paint of approved quality on new work (three or more coats) to give an even shade.
Add EPF 3.25%
Add CESS 1%
Add GST @ 18% GST
M/s THOKCHOM SHYAMKUMAR SINGH
M/S R. K. PREMCHANDRA SINGH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .