Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 LAccepted-AOC AMTALA MAMUDPUR PAL PARA KANYANAGAR NIBARAN DUTTA ROAD SOUTH 24 PARGANAS WEST BENGAL 743398 | 743398 | 1 | Accepted-AOC L1 | |
| 2 | 2₹6.0 L+₹30,142 (5.29%)Rejected-AOC AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | 2 | Rejected-AOC L2 | |
| 3 | 3₹6.4 L+₹66,192 (11.6%)Rejected-AOC | 3 | Rejected-AOC L3 |
Tender Value
₹5.6 L
EMD Value
₹11,000
Closing Date
10 Jun 2023, 1:00 pmClosed
Superintending Engineer
OFFICE OF THE SUPERINTENDING ENGINEER, 2X500 MW, DTPS, ANPARA, SONBHADRA (U.P.)
Insulation, refractory, skin casing repairing and removal of fly ash, debris from pressure part, ducts, hoppers and roof of pent house etc. during overhauling of unit-6,2x500 M.W., DTPS, Anpara
2023_RVUNL_798915_1
T06/BMD-1/OH /U6/DTPP /2023-24
Open Tender
Power/Energy Projects/Products
Fixed-rate
35 days
Anpara Thermal Power Station
TENDER COST, EARNEST MONEY, VALIDITY AGREEMENT
2 documents required · 2 mandatory
₹590
Dy CAO CFA and BO, DTPS, Anpara
₹11,000
4 Nov 2023
26 Apr 2023
12 Jun 2023
26 Apr 2023
10 Jun 2023
26 Apr 2023
Amount
When new cladding is to be provided with 18-24 Gauge (Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure. When one layer of mineral wool blankets/ of thickness 25/40/ 50/ 60/75 mm, are provided / fixed at site.
When new cladding is to be provided with 18-24 Gauge (Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure. When more than one layer of mineral wool blankets/ pads pipe section of thickness 25/40/50/60/75 mm, are provided / fixed at site.
When old/ removed cladding sheets to be fixed with the help of self tapping screws.When one layer of mineral wool blankets of thickness 25/40/ 50/ 60/75 mm, are provided or the old/ removed but usable are provided/ fixed at site.
When old/ removed cladding sheets to be fixed with the help of self tapping screws,When more than one layer of mineral wool blankets of thickness 25 /40/ 50/ 60 /75 mm, are provided or the old/ removed but usable are provided/ fixed at site.
Insulation of Headers in Pent House/ out side : When more than one layer of mineral wool blankets /pads of thickness 25/40/50/60/70 mm, are provided /fixed on the headers in pent house etc.
Appliatione of mineral wool blankets /pads and fixing with G.I wire on H,p/L.P. valves of boiler applicatin of insulating powder , hard lag/mastic compound & finishing /cladding with G.I /Aluminum sheets of 18-24 gauge wherever required as per site requirement or as instructed .
Application of Refractory in main boiler pressure parts heating zones.
cleaning of LTSH chamber
cleaning of ECO chamber
cleaning of gallery between RH & ARCH TUBES.
cleaning of pent house above furnace.
cleaning of gallery between PSH & RH in pent house.
cleaning of gallery between CRH header & HRH header in pent house.
cleaning of gallery between divisional superheater to platen superheater in pent house.
cleaning of gallery between/around all the four divisional superheater headers in pent house.
cleaning of extended furnace house between ist & iind pass.
cleaning of economiser hopper
cleaning of gallery along with water wall header left/right/front in pent house from divisional superheater to platen superheater area.
cleaning of hot SA duct from APH to windbox(L)
cleaning of hot SA duct from APH to windbox (-R)
cleaning of furnace windbox (L)
cleaning of furnace windbox (-R)
cleaning of interconnecting duct of hot SA
cleaning of inlet damper to outlet damper of air and flue gas duct of APH including APH
cleaning of penthouse roof of boiler
cleaning of dog house of boiler
cleaning of S-panel of boiler
Cleaning of buck stays of 1st and 2nd pass of boiler from 11 meter elevation upto 80 meter.
Repairing and rectification of boiler skin casing/high crown plate / Expension sheet etc inside penthouse using suitable electrode as per IBR
External cleaning of boiler
Providing scaffolding when working place height is beyond 3 mtr. And approach is not avaliable
SHAKSHI ENGINEERING CO.
M/S NISHA ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .