Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 6 28 THOOKKANAMPATTY METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | Admitted-Finance |
| 2 | Admitted-Finance NO 10 12 128 EAST MAIN ROAD OPP GOVT ITI MADHAIYANKUTTAI METTUR DAM | TIRUCHIRAPPALLI | TAMIL NADU | 621011 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
5 May 2022, 2:00 pmClosed
SEM2MTPS2
SEM2MTPS2 METTUR DAM
MTPS II CHP II Reconditioning of 630 mm dia drive double wheel bogie wheel assembly and nondrive single wheel bogie wheel assembly of SCR machines
2022_EB_229878_1
OT-04/2022-23
Open Tender
Miscellaneous Works
Works
45 days
MTPS 2 METTUR DAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
Yes
6 Jun 2022
21 Apr 2022
6 May 2022
21 Apr 2022
5 May 2022
21 Apr 2022
Amount
Charges for loading of Bogie wheel assemblies comprising of 3 Nos. bogie wheels and related items into private lorry from Central Stores / MTPS-II, transporting to the private workshop at outside of MTPS-II for reconditioning works and returning the same to Central Stores/ MTPS –II after reconditioning works. (Board Crane will be provided for loading and unloading at Central Stores at free of cost)
Charges for dismantling the single Bogie wheel assembly-1 No, removing the bearing from its position by using bearing puller, dismantling the casing, releasing the shaft and bogie wheel for reconditioning works
Charges for dismantling the drive end bogie wheel assembly – 1 Set, removing the bearing by using bearing puller, dismantling drive gear, releasing the shaft, removing the casing cover, dismantling the bearing, using bearing puller, bogie wheel and drive gear-2Nos. and releasing the shafts for and bogie wheel for reconditioning work
Charges for reconditioning of bogie wheel shaft by building up of the worn-out surface by welding special welding electrode after pre heating and machining the shaft to the required size
Charges for under cutting the worn-out surface of the bogie wheel by 3mm (Railing area) by turning before welding
Charges for surface preparation and building up of the worn-out surface of bogie wheel railing area by welding special purpose welding electrode of the pre heating the welding surface area by cutting gas
Charges for grinding, machining of bogie wheel after welding work, by leading, lifting and fixing one end in lathe and the other end by supporting with fixture. Machining the welding area (railing area) to required dimensions .
Charges for static balancing of re- conditioned bogie wheel in presence of Board Engineer in charge at site
Charges for assembly of 1 No. single bogie wheel assembly – cleaning the bearings, checking the healthiness of the bearings, assembling the same into the bogie wheel shaft assembly the reconditioned bogie wheel and closing the casing cover
Charges for cleaning the bearing and checking the healthiness bearing and assembling of drive end bogie wheel assembly – 2Sets after recondition the wheels assembling the cover and Casing
Charges for inspection of the gear internals, inspecting the teeth, checking the backlash etc. in the drive end bogie wheel, applying grease and checking of freeness of the shaft and proper resting of the gear
SRI BHAGAVATHY ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .