| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹15.4 L (12.4%)Admitted-Finance | ₹1.4 Cr+₹15.4 L (12.4%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹64.8 L (52.4%)Admitted-Finance | ₹1.9 Cr+₹64.8 L (52.4%) | L3 | Admitted-Finance |
| 4 | L4₹2.1 Cr+₹83.5 L (67.5%)Admitted-Finance | ₹2.1 Cr+₹83.5 L (67.5%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | E.SARAVANAN L2 | RKT CONSTRUCTIONS L4 | R.senthil kumar L3 | K.A.SENGUTUVAN L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 31,915.75 | M2 | 21.66 ₹6,91,295.15 | 35 ₹11,17,051.25 | 29 ₹9,25,556.75 | 19 ₹6,06,399.25 Lowest |
| 2.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 | 439.49 | M3 | 9,100 ₹39,99,359 | 13,000 ₹57,13,370 | 12,340 ₹54,23,306.6 | 8,100 ₹35,59,869 Lowest |
| 3.00 | Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ 60/70 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP ith bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory /Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 957.47 | M3 | 9,623.25 ₹92,13,973.18 | 14,500 ₹1,38,83,315 | 13,053 ₹1,24,97,855.91 | 8,566 ₹82,01,688.02 Lowest |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
13 Jun 2023, 3:00 pmClosed
EXECUTIVE OFFICER
EDAIKAZHINADU TOWN PANCHAYAT
Restoration of BT Road at Ward No. 1, Ward No.2, Ward No.11 , Ward No.15 , Ward No.17 Ward No.20 in Edaikazhinadu Town Panchayat
2023_DTP_317930_1
74/2023
Open Tender
Civil Works
Works
EDAIKAZHINADU TOWN PANCHAYAT
As per Tender document
3 documents required · 3 mandatory
₹6,683
Yes
EXECUTIVE OFFICER
₹1.9 L
Yes
EDAIKAZHINADU TOWN PANCHAYAT
16 Jun 2023
22 May 2023
13 Jun 2023
22 May 2023
13 Jun 2023
22 May 2023
22 May 2023 - 12 Jun 2023
22 May 2023
Amount
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ 60/70 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP ith bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory /Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
E.SARAVANAN
R.senthil kumar
RKT CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
Tendernotice_2.pdf
PDF • 1.01 MB
BOQ_377366.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .