Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹2.3 L+₹4,255 (1.91%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
28 Mar 2023, 11:00 amClosed
SE EDC 2 BULANDSHAHR
SE EDC 2 BULANDSHAHR
INCREASING CAPACITY OF TRANSFORMER AND CONSTRUCTION OF HT AND LT LINE IN BUSINESS PLAN UNDER EDD-V BULANDSHAHR.
2023_PVVNL_782267_1
56/EDC-II/BSR/22-23
Open Tender
Electrical Works
Lump-sum
365 days
BULANDSHAHR
INCREASING CAPACITY OF TRANSFORMER AND CONSTRUCTION OF HT AND LT LINE IN BUSINESS PLAN UNDER EDD-V BULANDSHAHR.
2 documents required · 2 mandatory
₹1,180
SE EDC 2 BULANDSAHHR
₹2,500
1 Apr 2023
6 Mar 2023
28 Mar 2023
6 Mar 2023
28 Mar 2023
6 Mar 2023
Amount
Carrige of following from E.S.C. Bulandshahar to pits site on Kachacha Pacaa road including loading & unloading charges at both ends, required completion of work distance abount to 0 to 20 K.M Approx..
250 KVA Transformer
400 KVA Transformer
LT XLPE Cable 1*240 SQ MM
ACSR Weasel Conductor
Removal, Dismentalled, Dismounting of existing old & used T/F from double pole/ plinth after opening HT/LT Connection from double pole.
100 KVA Transformer
250 KVA Transformer
Installation & Mounting of the Distribution Transformer on the plinth with the help of crane.
250 KVA Transformer
400 KVA Transformer
Carrige of dismantalled Transformer from site to ESC BSR including loading & unloading charges at both ends, required completion of work distance abount to 0 to 20 K.M Approx.
100 KVA Transformer
250 KVA Transformer
Earthing of 250 KVA & 400 KVA T/F by Boarding & Lowering of GI pipe 1.25'' dia upto water lavel 60' to lower end of which a solid cone approx 9'' long shall be bringing continuouswise or 35*5 mm MS Strip from the cone to ground serface for T/F Neutral connection the earth strip will be welded to the pipe.
Constraction of plinth for 250KVA/400KVA of size 1 mm hight*2 mm long *2 mm wide. The Constraction work of plinth includes exeavation of earth, brick work & cc in ratio of 1:4:8 (cement, badrapur & sand) for mounting of 250/400 KVA T/F. The Plaster will be done on the wall of ratio1:4 conount & sand & 12 mm thick. 2 nos channel shall be grouted on the plinth for installation of 250/400 KVA T/F of ratio1:2:4 cement, stone blast & badarpur. Required Material will be provided by the Contractor.
Providing & Fixing of wirewesh fenceing sarounding the plinth of 250/400 KVA T/F in properly fit with bolt & nut. Stracture of fanceing to be made of MS ANGLE of size 50*50*5 MM & Fanceing will have a provision of Gate. MS ANGLE to be grouted for 2 in ratio 1:2:4 Cement, Stone Blast & Badarpur. Fanceing is to be painted by one coat Red Oxide & 2 coat of Yallow animal Paint.
All work will be done as per UPPCL/RESPO Rules.
ARYAN ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .