Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.7 LAccepted-AOC BINA ROAD KAUWA NALA ANPARA DISTT SONEBHADRA UP 231225 | ANPARA | SONEBHADRA | UTTAR PRADESH | 231225 | ₹54.7 L Quoted ₹46.4 L | L1 | Accepted-AOC Awarded to M/s RAM LAKHAN SINGH AND COMPANY |
| 2 | L2₹47.1 LRejected-Finance BINA ROAD PARAS AMPARA SONCHHADRA UP 231225 | SONCHHADRA | SONBHADRA | UP | 231225 | ₹47.1 L | L2 | Rejected-Finance as per TCR |
| 3 | L3₹48.2 LRejected-Finance | ₹48.2 L | L3 | Rejected-Finance as per TCR |
| 4 | L4₹48.7 LRejected-Finance AWANAGAR P O NIGAHI DISTRICT SINGRAULI MP 486684 | SINGRAULI | MP | 486684 | ₹48.7 L | L4 | Rejected-Finance as per TCR |
| 5 | L5₹50.6 LRejected-Finance ADARSH NAGAR AURI MORE ANPARA SONEBHADRA 231225 | ANPARA | SONEBHADRA | UTTAR PRADESH | 231225 | ₹50.6 L | L5 | Rejected-Finance as per TCR |
Tender Value
₹71.1 L
EMD Value
₹88,900
Closing Date
10 Mar 2026, 11:00 amClosed
Staff Officer, kakri Project
Office of General Manager, Kakri Project
Providing and fixing of Hume pipe culvert in kakri mine.
2026_NCL_354024_1
NCL/KKR/CIVIL/25-26/ETN-19 Dated 21.02.2026
Open Tender
Civil Works - Others
180 days
Kakri Project
Please refer Tender documents.
5 documents required · 5 mandatory
₹88,900
28 Mar 2026
21 Feb 2026
11 Mar 2026
21 Feb 2026
10 Mar 2026
23 Feb 2026
23 Feb 2026 - 5 Mar 2026
PART (A)
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete1800 mm dia RCC pipes. (Laying by mannual/ machenical means)
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete.1200 mm dia RCC pipes. (Laying by mannual/ machenical means)
Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL). Lead 50 mtr.
Providingandlayinginpositioncementconcreteofspecifiedgradeexcludingthecostof centering and shuttering - All work up to plinth level : 1:3:6(1Cement:3coarsesand(zone-III):6gradedstoneaggregate20mmnominalsize).
Providingandlayinginpositioncementconcreteofspecifiedgradeexcludingthecostof centering and shuttering - All work up to plinth level : 1:2:4(1Cement:3coarsesand(zone-III):6gradedstoneaggregate20mmnominalsize).
Random rubble masonry with hardstone in foundation and plinth including levelling up with cement concrete1:6:12 (1cement:6coarse sand:12graded stone aggregate20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand)
Fillingavailableexcavatedearth(excludingrock)intrenches,plinth,sidesoffoundationsetc.inlayersnotexceeding20cmindepth,consolidatingeachdepositedlayer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause2500, of Zinic+PVC coated (having colour of Red), Mesh wire diameter2.7/3.7mm, mechanically edged/selvedgedrequired size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%)with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire ofdiameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, as per drawing, all complete as per directions of Engineer-in-charge.( cost of collection and filling of boulders to be paid separately)
Collection of locally available boulder from dump, carriage to Site brought to shape and size either manual or mechanically with all lead packing the same into wire crete with fully tightens etc complete for 1 cum ( a deduction of 15% shall be made in volume of gabions).
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 2.75 MB
BOQ_366842.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid