Loading…
Loading…
Tender Value
₹12.5 L
EMD Value
₹24,920
Closing Date
10 Aug 2026, 6:00 pm
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SMC REGAL LANE LAL CHOWK
Construction of fencing around Shamshan Ghat Pokhribal Kathidarwaza
2026_HAUDD_317172_2
SHORT Term NOTICE INVITING ETENDER No. 19 of 2026-2027 Dated 21.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
90 days
Shamshan Ghat Pokhribal Kathidarwaza
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹602
FA/CAO AC NO 0216010200000007
₹24,920
21 Jul 2026
21 Jul 2026
11 Aug 2026
23 Jul 2026
10 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 35.7 | Cum | 1,740.45 | ₹62,134.07 |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 1 meter from cutting edge | 11.24 | Cum | 479.3 | ₹5,387.33 |
| - | Providing and laying Stone soling/Boulder including compacting watering including all carriages of material complete | 5.62 | Cum | 850 | ₹4,777 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 5.62 | Cum | 5,202.9 | ₹29,240.3 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 12.86 | Cum | 7,104.35 | ₹91,361.94 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,286 | Kgs | 123.2 | ₹1,58,435.2 |
| - | RANDOM RUBBLE MASONRY Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 34.03 | Cum | 4,677.35 | ₹1,59,170.22 |
| - | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc. | 127.28 | Sqm | 628.95 | ₹80,052.76 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 26.75 | Cum | 5,733.6 | ₹1,53,373.8 |
| - | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 107 | Kgs | 266.2 | ₹28,483.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_1038241.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].