| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-Finance | ₹10.4 L | L1 | Accepted-Finance BOQ Rate accepted |
| 2 | L2₹11.0 LAccepted-Finance 7 33J 11F GANESH NAGAR WEST M SAVERIAR PURAM MUTHIAHPURAM TUTICORIN 628 005 | TUTICORIN | TAMIL NADU | 628005 | ₹11.0 L | L2 | Accepted-Finance BOQ Rate accepted |
| Sl No | Description | Qty | Unit | SRI GOKUL ENTERPRISES | A.SEKAR CONTRACTOR |
|---|---|---|---|---|---|
| 1.00 | Removal of Ash deposit in the sides of pedestals for undertaking rectification works by excavation and disposal 1 Km away from site including cost of labour, lead, lift etc, complete. | 81 | M3 | 13,203 ₹15,579.54 | 13,851 ₹16,344.18 |
| 2.00 | Removing the spalled / distressed concrete for an average thickness of 75mm including disposal of debris with a lead of 1km and roughening the surface thoroughly with Reebaklens fosroc acid/ equivalent with all lead, lift, labour etc., complete. | 180.83 | M2 | 1,07,593.85 ₹1.3 L | 1,12,114.6 ₹1.3 L |
| 3.00 | Providing HILTI joint arrangements to the rods by drilling holes into the old concrete and new concrete to a required depth and injecting motor HIT - RE 500 @ 0.50ml/mm chemicals, rate including the cost of chemical, drilling arrangements, labour charges, lead, lift, etc., complete | 12,000 | mm | 1,02,000 ₹1.2 L | 1,20,000 ₹1.4 L |
| 4.00 | Supplying & providing RTS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc. complete. | 1,030.62 | Kg | 1,06,153.86 ₹1.3 L | 1,12,337.58 ₹1.3 L |
| 5.00 | Micro Concrete for RCC wall with shuttering (75mm Thickness) a. Applying One coat of Nito Zinc/equivalent primer after thorough cleaning of rust in the reinforcement rate including cost of all materials, labour, lead, lift etc., complete as directed by the engineer at site. b. Providing fabricating and erecting slurry tight form work with plywood shutters with suitable supports, which do not deform due to micro concrete including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. c. Providing micro concrete Rendroc RG (or) equivalent as per manufacture's specifications. This mixed micro concrete should be placed continuously for an average thickness of 75mm including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. d. Applying one coat of polymer modified Acrylic Emulsion (Nito bond AR or equivalent) on the finished concrete surfaces as a curing membrane including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. | 180.83 | M2 | 6,72,687.6 ₹7.9 L | 7,03,067.04 ₹8.3 L |
| 6.00 | Providing two coats of anticorrosive black paint with one coat white cement primer to the newly plastered surface over a one coat of primer including cost of all materials, labour, lead, lift, etc., complete. | 180.83 | M2 | 39,782.6 ₹46,943.47 | 41,048.41 ₹48,437.12 |
Tender Value
Refer Docs
EMD Value
₹8,300
Closing Date
25 Feb 2026, 2:00 pmClosed
Chief Engineer TTPS Tuticorin
Office of the Superintending Engineer Civil TTPS
Rectification Works to the Damaged Ash Slurry Line Pedestals of Units 1 to 3 from Security Gate North side to DG Set Near in Unit 4 and 5 area
2026_EB_652614_1
CE SE C TTPS Spec.No. 386 25 26
Open Tender
Civil Works - Others
120 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,300
Yes
2 Mar 2026
7 Feb 2026
26 Feb 2026
7 Feb 2026
25 Feb 2026
7 Feb 2026
Removal of Ash deposit in the sides of pedestals for undertaking rectification works by excavation and disposal 1 Km away from site including cost of labour, lead, lift etc, complete.
Removing the spalled / distressed concrete for an average thickness of 75mm including disposal of debris with a lead of 1km and roughening the surface thoroughly with Reebaklens fosroc acid/ equivalent with all lead, lift, labour etc., complete.
Providing HILTI joint arrangements to the rods by drilling holes into the old concrete and new concrete to a required depth and injecting motor HIT - RE 500 @ 0.50ml/mm chemicals, rate including the cost of chemical, drilling arrangements, labour charges, lead, lift, etc., complete
Supplying & providing RTS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, etc. complete.
Micro Concrete for RCC wall with shuttering (75mm Thickness) a. Applying One coat of Nito Zinc/equivalent primer after thorough cleaning of rust in the reinforcement rate including cost of all materials, labour, lead, lift etc., complete as directed by the engineer at site. b. Providing fabricating and erecting slurry tight form work with plywood shutters with suitable supports, which do not deform due to micro concrete including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. c. Providing micro concrete Rendroc RG (or) equivalent as per manufacture's specifications. This mixed micro concrete should be placed continuously for an average thickness of 75mm including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site. d. Applying one coat of polymer modified Acrylic Emulsion (Nito bond AR or equivalent) on the finished concrete surfaces as a curing membrane including cost of all materials, labours, lead, lift, etc., complete as directed by the engineer at site.
Providing two coats of anticorrosive black paint with one coat white cement primer to the newly plastered surface over a one coat of primer including cost of all materials, labour, lead, lift, etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_782514.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid