Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹20.2 Laccepted-aoc | accepted-aoc |
Tender Value
₹24.2 L
EMD Value
₹25,000
Closing Date
17 Sept 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Public Works Department
EE PWD DIVISION GADAG
Construction of 2 classrooms for Govt higher primary school for girls in Hombala Village in Gadag Taluk
PWD/2026-27/BD/WORK_INDENT36611
PWD/2026-27/BD/WORK_INDENT36611
Reserved
Buildings
Electronic Documents, First(One Cover)
PWD Division Office Gadaga
7 documents required · 7 mandatory
₹610
₹25,000
17 Sept 2026
10 Sept 2026
15 Sept 2026
90 days
Construction of 2 classrooms for Govt higher primary school for girls in Hombala Village in Gadag Taluk
Mechanical Means -
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm a...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, tr...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand) ---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF ENGINEER IN CHARGE
Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 con...
Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including ...
Providing and fixing aluminium round shape handle of outer dia 100 mm with sS screws etc. complete as per direction of Engineer-in- charge: Anodized (AC 15 ) aluminium including cost of mate...
Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc...
Providing and fixing special quality bright finished brass cupboard or ward robe locks with four levers of approved quality including necessary screws etc. complete. - 40mm ---- WORK SHOULD BE CARRIED...
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to open...
Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffoldin...
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even an...
Providing 15 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall including rounding off ...
Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mix...
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and in- cluding water thinnable priming coat with cement primer...
Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint...
Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufacturers specifications including appropriate priming coat, preparation of surface, etc. com...
Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of app...
Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup ...
Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. ---- WORK SHOULD BE CARRIED OUT AS PER ...
Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matt...
polyurethane based single Component for New surface - Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrac...
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for t...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
Supplying heavy gauge PVC conduit pipe mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The condui...
Supplying heavy gauge PVC conduit pipe mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The condui...
Supplying and fixing PVC/metal conduit Deep junction box 19/20 mm deep Junction box
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF ENGINEER IN CHARGE
Supplying and fixing PVC/metal conduit Deep junction box 25 mm deep Junction box
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF ENGINEER IN CHARGE
Supplying heavy gauge PVC Conduit Pipe . dia mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement pl...
Supplying heavy gauge PVC Conduit Pipe . dia mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement pl...
Supplying And Fixing Metal Fan Box with Round Hook.
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF ENGINEER IN CHARGE
Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire...
Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire...
Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 1...
Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 4...
Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 6...
Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 8...
Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing m...
Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing m...
Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing m...
Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing m...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.
6A One Way Switch
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF E...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Two Way Switch
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF ...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION O...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two Module
---- WORK SHOULD BE CARRIED OUT AS PER TH...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Bell Push
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF ENGIN...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF ENG...
Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTIO...
Extra for supplying 4 mm thick white plastic plate and covering for junction boxes of size . mm conduit using
necessary machine screws. 80/90 mm
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION ...
Extra for supplying 4 mm thick white plastic plate and covering for junction boxes of size . mm conduit using
necessary machine screws. 110 mm
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS...
Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF ENGINEER IN C...
Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball be...
Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23...
Extra length of GI pipe of class B 19mm dia for down rod.
---- WORK SHOULD BE CARRIED OUT AS PER THE DIRECTION OF ENGINEER IN CHARGE
Supplying of feet -PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI more than 80. Power Input: 220-240V@ 50/60Hz & Po...
Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, r...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure 500-A.7 FINALLY CORRECTED.doc
Operating Procedures • 0.09 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.1(IRC-16-1989) FINALLY CORRECTED.doc
Operating Procedures • 0.04 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.10(IRC-48-1972) FINALLY CORRECTED.doc
Operating Procedures • 0.12 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.11(SP-16-1977) FINALLY CORRECTED.doc
Operating Procedures • 0.08 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.12(IRC-37-1984) FINALLY CORRECTED.doc
Operating Procedures • 1.25 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.13(IRC-88-1984) FINALLY CORRECTED.doc
Operating Procedures • 0.22 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.14(IRC-55-1974)-FINALLY CORRECTED.doc
Operating Procedures • 0.05 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.15(IRC-95-1987) FINALLY CORRECTED.doc
Operating Procedures • 0.04 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.16(IRC-94-1986) FINALLY CORRECTED.doc
Operating Procedures • 0.07 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.17(IRC-29-1968) FINALLY CORRECTED.doc
Operating Procedures • 0.08 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.18(SP-53-1999) FINALLY CORRECTED.doc
Operating Procedures • 0.05 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.19(IRC-47-1972)-FINALLY CORRECTED.doc
Operating Procedures • 0.08 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.2(IS 8887-1978)-FINALLY CORRECTED.doc
Operating Procedures • 0.12 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.20(SP-20-1966)-FINALLY CORRECTED.doc
Operating Procedures • 0.04 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.21(IRC-27-1967) FINALLY CORRECTED.doc
Operating Procedures • 0.04 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.22(IRC-14-1977)-FINALLY CORRECTED.doc
Operating Procedures • 0.09 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.23(IRC-17-1965)-FINALLY CORRECTED.doc
Operating Procedures • 0.05 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.24(IRC-23-1966)-FINALLY CORRECTED.doc
Operating Procedures • 0.07 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.3(IS 217-1988) FINALLY CORRECTED.doc
Operating Procedures • 0.08 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.4(IS 454-1994) FINALLY CORRECTED.doc
Operating Procedures • 0.08 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.5(IS 73-1992) FINALLY CORRECTED.doc
Operating Procedures • 0.09 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.6(I.O.C. EXTRACT) FINALLY CORRECTED.doc
Operating Procedures • 0.03 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.8 (IRC-97-1987) FINALLY CORRECTED.doc
Operating Procedures • 0.06 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_Annexure-500-A.9(IRC-96-1987) FINALLY CORRRECTED.doc
Operating Procedures • 0.05 MB
Specification N_Specification_detail specificatin sec[1].500 bituminous_Detail Specificatin SEC.500 Bituminous_SECTION-500(UPGRADED-VERSION)-FINALLY CORRECTED.doc
Operating Procedures • 0.91 MB
Specification N_Specification_format 1 to 10 & newformate- 2 for loc.xls
Operating Procedures • 0.10 MB
Specification N_Specification_sec -300 e[1].w.e rb7_RB7_Annexure-300-A-7- (BIS 2720 PART 7) FINAL.doc
Operating Procedures • 0.06 MB
Specification N_Specification_sec -300 e[1].w.e rb7_RB7_Annexure-300-A-8-(BIS 2720 PART 2) FINAL.doc
Operating Procedures • 4.96 MB
Specification N_Specification_sec -300 e[1].w.e rb7_RB7_Annexure-300-A-9- (BIS 2720 PART 5) FINAL.doc
Operating Procedures • 0.14 MB
Specification N_Specification_sec -300 e[1].w.e rb7_RB7_Annexure-300-A.3-IRC-10-FINAL.doc
Operating Procedures • 0.19 MB
Specification N_Specification_sec -300 e[1].w.e rb7_RB7_Annexure-300-A.5-IRC-34-FINAL1.doc
Operating Procedures • 1.32 MB
Specification N_Specification_sec 400 non bituminous_SEC 400 Non Bituminous_Annexure 400 A 1 IRC 33 1969 FINALLY CORRECTED.doc
Operating Procedures • 0.06 MB
Specification N_Specification_sec 400 non bituminous_SEC 400 Non Bituminous_Annexure 400 A 2 IRC 49 1973 FINALLY CORRECTED.doc
Operating Procedures • 0.15 MB
Specification N_Specification_sec 400 non bituminous_SEC 400 Non Bituminous_Annexure 400 A 3 IRC 28 1976 FINALLY CORRECTED.doc
Operating Procedures • 0.06 MB
Specification N_Specification_sec 400 non bituminous_SEC 400 Non Bituminous_Annexure 400 A 4 IRC 51 1973 FINALLY CORRECTED.doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec 400 non bituminous_SEC 400 Non Bituminous_Annexure 400 A 5 IRC 50 1973 FINALLY CORRECTED.doc
Operating Procedures • 0.06 MB
Specification N_Specification_sec 400 non bituminous_SEC 400 Non Bituminous_SECTION 400 GRANULAR SUB BASE FINALLY CORRECTED.doc
Operating Procedures • 0.14 MB
Specification N_Specification_sec.11 sanitary-works_SEC.11 SANITARY-WORKS_SANITARY-APPLIANCES-FITTINGS-FINALLY CORRECTED-1.doc
Operating Procedures • 4.99 MB
Specification N_Specification_sec.13 water supply_SEC.13 WATER SUPPLY_WATER-SUPPLY-FINAL-SECTION-13.doc
Operating Procedures • 3.79 MB
Specification N_Specification_sec.2 earthwork_SEC.2 EARTHWORK_EARTHWORK-FINAL-1.doc
Operating Procedures • 0.18 MB
Specification N_Specification_sec.2 earthwork_SEC.2 EARTHWORK_Methods of Test for soils-IS-2720(PartII)-1973.doc
Operating Procedures • 0.54 MB
Specification N_Specification_sec.2 earthwork_SEC.2 EARTHWORK_PART II FOUNDATIONS.doc
Operating Procedures • 0.06 MB
Specification N_Specification_sec.4 concrete-work_SEC.4 CONCRETE-WORK_CONCRETE-FINALLY CORRECTED.doc
Operating Procedures • 9.61 MB
Specification N_Specification_sec.4 concrete-work_SEC.4 CONCRETE-WORK_DESIGN OF CONCRETE MIXES.doc
Operating Procedures • 0.06 MB
Specification N_Specification_sec.4 concrete-work_SEC.4 CONCRETE-WORK_Developments in scaffolding.doc
Operating Procedures • 0.05 MB
Specification N_Specification_sec.4 concrete-work_SEC.4 CONCRETE-WORK_FORMWORK AND SCAFFOLDING.doc
Operating Procedures • 0.07 MB
Specification N_Specification_sec.4 concrete-work_SEC.4 CONCRETE-WORK_SPECIFICATION FOR 53 GRADE ORDINARY PORTLAND CEMENT.doc
Operating Procedures • 0.13 MB
Specification N_Specification_sec.6 brick-masonry_SEC.6 BRICK-MASONRY_BRICKWORK-FINALLY- CORRECTED-WITH-FIGURES.doc
Operating Procedures • 1.95 MB
Specification N_Specification_sec.6 brick-masonry_SEC.6 BRICK-MASONRY_DESIGNS OF WALLS.doc
Operating Procedures • 2.71 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL WORK-FINALLY CORRECTED-ADDL COPY.doc
Operating Procedures • 3.05 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_Anne.7-A.59-1731-1971 FINALLY CORRECTED.doc
Operating Procedures • 0.12 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_Anne.7-A.60-1732-1971 FINALLY CORRECTED.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_Anne.7-A.61-2678-1972 FINALLY CORRECTED.doc
Operating Procedures • 0.12 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_Anne.7-A.62-3965-1981 FINALLY CORRECTED.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_Anne.7-A.63-1361-1978 FINALLY CORRECTED.doc
Operating Procedures • 0.10 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_Anne.7-A.64-1948-1961 FINALLY CORRECTED.doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.73-6003-1970.doc
Operating Procedures • 0.08 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7 - A.33-4516-1968.doc
Operating Procedures • 0.10 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7.A.75-7887-1975.doc
Operating Procedures • 0.10 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.11-432(part 1)-1982.doc
Operating Procedures • 0.06 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.12-432(Part II)-1982.doc
Operating Procedures • 0.02 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.14-7452-1982.doc
Operating Procedures • 0.08 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.27 (IS 4030-1973).doc
Operating Procedures • 0.10 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.31-1239(PartII)-1982.doc
Operating Procedures • 0.05 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.32-4270-1967.doc
Operating Procedures • 0.05 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.34-4923-1968.doc
Operating Procedures • 0.10 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.35-733-1975.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.36-737-1974.doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.37-1254-1975.doc
Operating Procedures • 0.10 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.38-7094-1973.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.39-811-1965.doc
Operating Procedures • 0.08 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.40-1173-1978.doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.41-1852-1979.doc
Operating Procedures • 0.12 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.42-2314-1963.doc
Operating Procedures • 0.10 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.43-3443-1980.doc
Operating Procedures • 0.10 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.44-3908-1966.doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.45-3909-1966.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.46-3921-1966.doc
Operating Procedures • 0.08 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.47-3954-1966.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.48-5384-1969.doc
Operating Procedures • 0.08 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.49-6445-1971.doc
Operating Procedures • 0.02 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.50-808-1964.doc
Operating Procedures • 0.07 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.51-808(part I)-1973.doc
Operating Procedures • 0.08 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.52-808(Part II)-1978.doc
Operating Procedures • 0.08 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.53-808(Part III)-1979.doc
Operating Procedures • 0.03 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.54-808(Part V)-1976.doc
Operating Procedures • 0.15 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.55-808(Part VI)-1976.doc
Operating Procedures • 0.13 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.56-1730(part I)-1974.doc
Operating Procedures • 0.14 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.57-1730(Part II)-1974.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.58-1730(Part III)-1974.doc
Operating Procedures • 0.08 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.59-1731-1971.doc
Operating Procedures • 0.10 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.60-1732-1971.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.61-2678-1972.doc
Operating Procedures • 0.12 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.62-3965-1981.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.63-1361-1978.doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.64-1948-1961.doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.65-1949-1961.doc
Operating Procedures • 0.04 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.66-4351-1976.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.67-6248-1979.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.68-1139-1966.doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.69-1566-1982.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.70-1785(Part I)-1966.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.71-1785(Part II)-1967.doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.72-2090-1962.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7 - A.30-1239(part 1)-1979.doc
Operating Procedures • 0.05 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Anne.7-A.74-6006-1970.doc
Operating Procedures • 0.13 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Annexure - 7A.22 IS-1786-1985.doc
Operating Procedures • 1.10 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Annexure 7 A-24 (IS 1977).doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Annexure 7-A.23(IS 806-1968).doc
Operating Procedures • 0.08 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Annexure 7-A.25-412-1975.doc
Operating Procedures • 0.04 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Annexure 7-A.26 (IS 1079).doc
Operating Procedures • 0.11 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Annexure 7-A.28-7226-1974.doc
Operating Procedures • 0.04 MB
Specification N_Specification_sec.7 steel-work_SEC.7 STEEL-WORK_STEEL-ANNEXURES_steel-part-annexures_Annexure 7-A.29-1161-1979.doc
Operating Procedures • 0.09 MB
Specification N_Specification_sec.9 wood-work_SEC.9 WOOD-WORK_Annexure-9-A.79(IS 2338-PART-1-1967).doc
Operating Procedures • 0.08 MB
Specification N_Specification_sec.9 wood-work_SEC.9 WOOD-WORK_Annexure-9-A.80(IS 2338-PART-2-1967).doc
Operating Procedures • 0.04 MB
Specification N_Specification_sec.9 wood-work_SEC.9 WOOD-WORK_WOOD WORK-FINALLY CORRECTED-PRINTED-COPY.doc
Operating Procedures • 7.79 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-300-A-1-FINAL.doc
Operating Procedures • 0.06 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-300-A-2(IRC-78)-FINAL.doc
Operating Procedures • 1.71 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-300-A-6- (BIS 2720 PART 40) FINAL.doc
Operating Procedures • 0.07 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-800-A.10(IRC-79-1981)-FINALLY CORRECTED.doc
Operating Procedures • 0.76 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-800-A.11(IRC-30-1968)-FINALLY CORRECTED.doc
Operating Procedures • 0.56 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-800-A.12(IS-7537-1974)-FINALLY CORRECTED.doc
Operating Procedures • 0.47 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-800-A.6(IRC-25-1967)-FINALLY CORRECTED.doc
Operating Procedures • 0.70 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-800-A.8(IRC-2-1968)-FINALLY CORRECTED.doc
Operating Procedures • 2.22 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-800-A.9(IRC-93-1985)-FINALLY CORRECTED.doc
Operating Procedures • 1.46 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-900-A.1(IRC-SP-11)-FINALLY CORRECTED.doc
Operating Procedures • 0.73 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_Annexure-900-A.2-FINALLY CORRECTED.doc
Operating Procedures • 0.05 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_SECTION 900-QUALITY CONTROL-FINALLY CORRECTED.doc
Operating Procedures • 0.12 MB
Specification N_Specification_sec 800&900 q[1].c_Sec 800&900 Q.C_SECTION-800-TRAFFIC-SIGNS FINALLY CORRECTED.doc
Operating Procedures • 0.14 MB
Bid doc KW-2 -ST 36611.doc
Tender Document • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .