Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.3 CrAdmitted-Finance | ₹57.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹59.0 CrAdmitted-Finance | ₹59.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹60.8 CrAdmitted-Finance 601 6TH FLOOR SURYA ICON NEAR TORRENT POWER OFFICE NEAR SURYA KUTIR NARANPURA AHMEDABAD AHMEDABAD GUJARAT 380013 UDYAM GJ 01 0027267 | AHMADABAD | GUJARAT | 380013 | ₹60.8 Cr | L3 | Admitted-Finance |
| 4 | L4₹60.8 CrAdmitted-Finance | ₹60.8 Cr | L4 | Admitted-Finance |
| 5 | L4₹60.8 CrAdmitted-Finance NEW COLONY DHARAMPUR SAMASTIPUR BIHAR 848101 | SAMASTIPUR | BIHAR | 848101 | ₹60.8 Cr | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MIRZ INFRASTRUCTURE BUILDERS L2 | hardik construction company L3 | BANDH AND CO L5 | Rachana Infrastructure LTd L4 | GRNACO INDUSTRIES AND CONSTRUCTIONS LIMITED L4 | CHAUDHARY CONSTRUCTION COMPANY PRIVATE LIMITED L8 | M/S HRCC PVT. LTD L6 | B S Builders L4 | CONSTRUCTION ENGINEERS L7 | Abdul Salam Mir Construction Company Pvt Ltd L9 | E5 Infrastructure Private Limited L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500) (Alstop )via Ashajipora of 8.470km length i.e. to connecting NH-244 & NH-44 in the Union Territory of Jammu & Kashmir on EPC mode. (Pkg–VII). | 1 | Lump Sum | 58,95,00,000 ₹59.0 Cr | 60,81,22,206 ₹60.8 Cr | 60,84,50,000 ₹60.8 Cr | 60,84,30,000 ₹60.8 Cr | 60,84,30,000 ₹60.8 Cr | 64,66,00,000 ₹64.7 Cr | 62,27,00,000 ₹62.3 Cr | 60,84,30,000 ₹60.8 Cr | 62,45,28,000 ₹62.5 Cr | 66,21,15,000 ₹66.2 Cr | 57,26,40,071.58 ₹57.3 Cr |
Tender Value
₹71.6 Cr
Closing Date
12 Mar 2021, 11:00 amClosed
B Shivprasad
National Highways and Infrastructure Development Corporation Ltd. Second Floor, PTI Building, 4 Sansad Marg. New Delhi
Construction of New 2-Lane bypass from km 176.532 (Donipawa) on NH-244 to Km 185.002 (Near Khudwani on NH-44(Alstop)) via Ashajipora of 8.470km length i.e. to connecting NH-244 and NH-44 in the UT of J and K on EPC mode. (Pkg -VII)
2021_NHIDC_617857_1
NHIDCL/JK/NH 244/K-K /PKG-VII/2020
Open Tender
Civil Works
548 days
Jammu and Kashmir
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,800
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
26 Mar 2021
20 Feb 2021
13 Mar 2021
20 Feb 2021
12 Mar 2021
9 Mar 2021
20 Feb 2021 - 6 Mar 2021
6 Mar 2021
Amount
Construction of New 2-Lane bypass from Design km 176+532(Existing km 263+070) (Donipawa) on NH-244 to Design Km 185+002 (Near Khudwani on NH-44 at existing km 238+500) (Alstop )via Ashajipora of 8.470km length i.e. to connecting NH-244 & NH-44 in the Union Territory of Jammu & Kashmir on EPC mode. (Pkg–VII).
MIRZ INFRASTRUCTURE BUILDERS
hardik construction company
B S Builders
Rachana Infrastructure LTd
GRNACO INDUSTRIES AND CONSTRUCTIONS LIMITED
BANDH AND CO
M/S HRCC PVT. LTD
CONSTRUCTION ENGINEERS
CHAUDHARY CONSTRUCTION COMPANY PRIVATE LIMITED
Abdul Salam Mir Construction Company Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
RFP.pdf
Tender Documents • 2.45 MB
DCA.pdf
Tender Documents • 2.60 MB
BOQ_649604.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid