| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | SOLE₹13.1 CrAccepted-AOC | ₹13.1 Cr | SOLE | Accepted-AOC SOLE BID BASIS |
| 2 | Rejected-Technical | - | - | Rejected-Technical Bid is rejected due to the reasons mentioned in the attachment enclosed. |
| 3 | Rejected-Technical | - | - | Rejected-Technical Bid is rejected due to the reasons mentioned in the attachment enclosed. |
| 4 | Rejected-Technical 254 DHAR ROAD INDORE INDORE MADHYA PRADESH 452002 | INDORE | MADHYA PRADESH | 452002 | - | - | Rejected-Technical Bid is rejected due to the reasons mentioned in the attachment enclosed. |
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
5 May 2023, 3:00 pmClosed
RAMAN CHOWDHARY
GAIL (INDIA) LIMITED, VJIAPUR, MADHYA PRADESH
ENGINEERING, PROCUREMENT AND CONSTRUCTION SERVICES (EPC SERVICES) FOR BALANCE WORK OF INSTALLATION OF 1MW AND 0.8 MW(AC) GROUND MOUNTED SOLAR PV POWER PLANTS AT GAIL COMPLEX, VIJAIPUR, DIST. GUNA, MADHYA PRADESH
2023_GAIL_149011_1
GAIL/VH/C22441/RC/ELECT/2022
Open Tender
Electrical Works
210 days
GAIL VIJAIPUR
AS PER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹20 L
Yes
VIRTUAL MODE MS TEAMS
16 Nov 2023
16 Mar 2023
6 May 2023
16 Mar 2023
5 May 2023
28 Mar 2023
16 Mar 2023 - 23 Mar 2023
24 Mar 2023
Amount
EPC Cost for balance works of SPVPlantA
EPC Cost for balance works of SPVPlantB
Total Lumpsum price for O&M 1.8MW SPV plant
O&M Cost for Solar PlantA 0.8MW 1st year
O&M Cost for Solar PlantA 0.8MW 2nd year
O&M Cost for Solar PlantA 0.8MW 3rd year
O&M Cost for Solar PlantA 0.8MW 4th year
O&M Cost for Solar PlantA 0.8MW 5th year
O&M Cost for Solar PlantA 0.8MW 6th year
O&M Cost for Solar PlantA 0.8MW 7th year
O&M Cost for Solar PlantA 0.8MW 8th year
O&M Cost for Solar PlantA 0.8MW 9th year
O&M Cost for Solar PlantA 0.8MW 10th year
O&M Cost for Solar PlantB 1MW 1st year
O&M Cost for Solar PlantB 1MW 2nd year
O&M Cost for Solar PlantB 1MW 3rd year
O&M Cost for Solar PlantB 1MW 4th year
O&M Cost for Solar PlantB 1MW 5th year
O&M Cost for Solar PlantB 1MW 6th year
O&M Cost for Solar PlantB 1MW 7th year
O&M Cost for Solar PlantB 1MW 8th year
O&M Cost for Solar PlantB 1MW 9th year
O&M Cost for Solar PlantB 1MW 10th year
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid