| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | ₹6.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.7 L+₹7,111.60 (1.07%)Rejected-Finance | ₹6.7 L+₹7,111.60 (1.07%) | L2 | Rejected-Finance Quated high rate |
| Sl No | Description | Qty | Unit | VISHAKAN CONSTRUCTION L1 | Sri mayura construction L2 |
|---|---|---|---|---|---|
| 1.00Name of work: Providing Cement Concrete Pavement at Goundanpudur KK nagar 1st street H/O ORICHERI | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 14.25 | cum | 244 ₹3,477 Lowest | 250 ₹3,562.5 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 27.46 | cum | 2,358 ₹64,750.68 Lowest | 2,400 ₹65,904 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 33.16 | cum | 5,250 ₹1,74,090 Lowest | 5,300 ₹1,75,748 |
| 5.00 | Supply and erection of steel centering for RCC works Including cost and conveyance of materials and all labour charges etc complete | 133 | sqm | 517 ₹68,761 Lowest | 520 ₹69,160 |
| 6.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 15.3 | cum | 5,983 ₹91,539.9 Lowest | 6,000 ₹91,800 |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 23.87 | cum | 6,636 ₹1,58,401.32 Lowest | 6,650 ₹1,58,735.5 |
| 8.00 | Provision for Bitumen Tar pad charges etc complete | 8.04 | sqm | 233 ₹1,873.32 Lowest | 250 ₹2,010 |
| 9.00 | Provision for Name board charges | 1 | Nos | 3,000 ₹3,000 Lowest | 5,000 ₹5,000 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package} | 1 | GST Amount | 1,01,860.78 ₹1,01,860.78 Lowest | 1,02,945.6 ₹1,02,945.6 |
Tender Value
₹6.8 L
EMD Value
₹6,780
Closing Date
17 Apr 2025, 3:00 pmClosed
Block Development Officer (V.P), Bhavani
Block Development Officer (V.P), Bhavani
Providing Cement Concrete Pavement at Goundanpudur KK nagar 1st street H/O ORICHERI
2025_RDTN_539193_1
5518/2025/A4
Open Tender
Civil Works - Others
Item Rate
105 days
Block Development Officer (V.P), Bhavani
Providing Cement Concrete Pavement at Goundanpudur KK nagar 1st street H/O ORICHERI
6 documents required · 6 mandatory
₹0
₹6,780
Yes
21 Jan 2026
7 Apr 2025
17 Apr 2025
7 Apr 2025
17 Apr 2025
7 Apr 2025
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply and erection of steel centering for RCC works Including cost and conveyance of materials and all labour charges etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Bitumen Tar pad charges etc complete
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
Sri mayura construction (BID ID -1304624)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_642077.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .