| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹39.9 L (22.2%)Admitted-Finance | ₹2.2 Cr+₹39.9 L (22.2%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical C 145 1 S F TAYYAB LANE SHAHEEN BAGH JAMIA NAGAR OKHLA NEW DELHI 110025 | SOUTH EAST DELHI | DELHI | 110025 | - | - | Not Admitted-Fee/PreQual/Technical Others-Physical documents not received before due date |
| Sl No | Description | Qty | Unit | Square Associates L1 | THOPPIL CONTRACTORS INDIA PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00 | Schedule - I- Dismantling & Reconstructing of western side jetty Approach at Kadmath:- Phase I
Dismantling of existing damaged concretes of slab, longitudinal beams, cross beams, hand rails, electric posts, low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy machineries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete. | 169.76 | Cum | 3,700 ₹6,28,112 Lowest | 4,000 ₹6,79,040 |
| 2.00 | RCC 1:0.9:1.80 using 20mm graded stone jelly for RCC pile cap mid tide bracings, short columns, diagonal bracings, stiffening walls, deck beams, and slab RCC slab or bollard blocks, low level landing platform etc., excluding fabrication charges which will be paid separately , including cost of cement, granite jelly, river sand, all labour charges for screening and washing of both the aggregates, providing all shuttering, including cost of shuttering materials, centering, proping wherever required mixing concrete, conveying and placing consolidation with vibrator curing, and transportation charges of all other materials to work site, hire charges and running expenses of concrete mixer machine and vibrator, etc., complete. | 132.46 | Cum | 32,200 ₹42,65,212 Lowest | 36,000 ₹47,68,560 |
| 3.00 | Providing and laying RCC with 1:11/2:3 mix (1cement 11/2 Msand,3 20mmchips) for Hand railposts, handrails and lightpost etc as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete. | 9.82 | Cum | 27,600 ₹2,71,032 Lowest | 36,000 ₹3,53,520 |
| 4.00 | Centering and shuttering for Hand railposts, handrails and lightpost etc including cost of all materials , form work, transportation charge of materials to the site, hire charge of woodcutting tools, vibrator and minor tools as per the direction of EIC etc complete. | 205.77 | Sqm | 1,500 ₹3,08,655 Lowest | 2,200 ₹4,52,694 |
| 5.00 | Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of Nodal Officer, including cost of material, fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Kadmath, cost of binding wires, all T&P required for the work and minor tools etc. complete. | 241 | Qtls | 15,600 ₹37,59,600 Lowest | 21,000 ₹50,61,000 |
| 6.00 | Providing and laying PCC with 1:2:4 mix (1cement 2 Msand,4 20mmchips) for wearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete. | 45.3 | Cum | 21,000 ₹9,51,300 Lowest | 27,000 ₹12,23,100 |
| 7.00 | Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials and labour charges etc complete. | 290.09 | Sqm | 250 ₹72,522.5 Lowest | 450 ₹1,30,540.5 |
| 8.00Fixing 10T and 20T bollards on the both side of the jetty for arresting the vessels, boat with ropes for embarkation/disembarkation of passenger and cargoes excluding the cost of bollard with its fittings, including transportation charges, minor tools, labour charges etc complete. | |||||
| 8.10 | 10 T | 6 | Nos | 10,000 ₹60,000 | 5,000 ₹30,000 Lowest |
| 8.20 | 20 T | 6 | Nos | 10,000 ₹60,000 | 5,000 ₹30,000 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
29 Aug 2024, 3:00 pmClosed
Executive Engineer(c) ALHW,Kavaratti
OFFICE OF THE DEPUTY CHIEF ENGINEER(LD),U.T OF LAKSHADWEEP,KAVARATTI ISLAND
RENOVATION OF KATCHERY JETTY AT KADMATH
2024_ALHW_818213_1
DCE/KVT/DB/T-34/2024-25/1203 Date-25.7.2024
Open Tender
Civil Works
Item Rate
180 days
Kadmath Island, U.T of Lakshadweep
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹3.6 L
Yes
30 Oct 2024
25 Jul 2024
30 Aug 2024
25 Jul 2024
29 Aug 2024
25 Jul 2024
25 Jul 2024 - 6 Aug 2024
Amount
Schedule - I- Dismantling & Reconstructing of western side jetty Approach at Kadmath:- Phase I Dismantling of existing damaged concretes of slab, longitudinal beams, cross beams, hand rails, electric posts, low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy machineries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete.
RCC 1:0.9:1.80 using 20mm graded stone jelly for RCC pile cap mid tide bracings, short columns, diagonal bracings, stiffening walls, deck beams, and slab RCC slab or bollard blocks, low level landing platform etc., excluding fabrication charges which will be paid separately , including cost of cement, granite jelly, river sand, all labour charges for screening and washing of both the aggregates, providing all shuttering, including cost of shuttering materials, centering, proping wherever required mixing concrete, conveying and placing consolidation with vibrator curing, and transportation charges of all other materials to work site, hire charges and running expenses of concrete mixer machine and vibrator, etc., complete.
Providing and laying RCC with 1:11/2:3 mix (1cement 11/2 Msand,3 20mmchips) for Hand railposts, handrails and lightpost etc as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete.
Centering and shuttering for Hand railposts, handrails and lightpost etc including cost of all materials , form work, transportation charge of materials to the site, hire charge of woodcutting tools, vibrator and minor tools as per the direction of EIC etc complete.
Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of Nodal Officer, including cost of material, fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Kadmath, cost of binding wires, all T&P required for the work and minor tools etc. complete.
Providing and laying PCC with 1:2:4 mix (1cement 2 Msand,4 20mmchips) for wearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete.
Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials and labour charges etc complete.
Fixing 10T and 20T bollards on the both side of the jetty for arresting the vessels, boat with ropes for embarkation/disembarkation of passenger and cargoes excluding the cost of bollard with its fittings, including transportation charges, minor tools, labour charges etc complete.
SCHEDULE - II - Dismantling & Reconstructing of western side jetty B/HEAD at Kadmath:- Phase I Dismantling of existing damaged concretes of slab, longitudinal beams,cross beams, hand rails, electric posts, low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy mechinaries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete.
Providing & laying RCC 1:0.9:1.80 using 20mm graded stone agregate for RCC pile cap mid tide bracings, short columns, diagonal bracings, stiffening walls, deck beams, and slab RCC slab or bollard blocks, low level landing platform etc., excluding fabrication charges which will be paid separately , including cost of cement, granite stone, river sand, all labour charges for screening and washing of both the aggregates, providing all shuttering, including cost of shuttering materials, centering, proping wherever required mixing concrete, conveying and placing consolidation with vibrator curing, and transportation charges of all other materials to work site, hire charges and running expenses of concrete mixer machine and vibrator, etc., complete.
Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of Nodal Officer, including cost of material, fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Chetlath, cost of binding wires, all T&P required for the work and minor tools etc. complete.
Providing and laying PCC with 1:2:4 mix (1cement 2 Msand,4 20mmchips) for wearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete.
Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials and labour charges etc complete.
Fixing 10T and 20T bollards on the both side of the jetty for arresting the vessels, boat with ropes for embarkation/disembarkation of passenger and cargoes excluding the cost of bollard with its fittings, including transportation charges, minor tools, labour charges etc complete.
20 T Bollard
THOPPIL CONTRACTORS INDIA PVT LTD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BID34.pdf
Tender Documents • 1.27 MB
BOQ_859886.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .