| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.1 LAccepted-AOC | L1 | Accepted-AOC Quoted rate found Lowest (L1) | |
| 2 | L2₹20.3 L+₹27,623.95 (1.38%)Rejected-Finance NEW BANSBARI NH 34 PO JHALJHALIA DIST MALDA PIN 732 102 | MALDAH | WEST BENGAL | 732102 | L2 | Rejected-Finance Quoted rate found 2nd Lowest (L2) | |
| 3 | L3₹20.1 L+₹3,463.96 (0.17%)Rejected-Finance RAJA SARAT CHANDRA ROAD PURATULI ENGLISHBAZAR DIST MALDA PIN 732101 | MALDAH | WEST BENGAL | 732101 | L3 | Rejected-Finance Quoted rate found 3rd Lowest (L3) |
Tender Value
Refer Docs
EMD Value
₹40,876
Closing Date
22 Mar 2021, 11:00 amClosed
EXECUTIVE ENGINEER PWD MALDA ELECTRICAL DIVISION
O/O THE EXECUTIVE ENGINEER PWD MALDA ELECTRICAL DIVISION Singatala Malda PIN 732101
Temporary Electrification work with Providing DG sets for preparedness of accommodation centres for CAPF/state Police forces in connection with Assembly Election 2021-for 6 Nos Schools under Harishchandrapur, Chanchal and Bhutni PS as per Annexure-A
2021_WBPWD_330042_1
WBPWD/MED/e-NIQ-40/2021-21
Open Tender
ELECTRICAL WORKS ORG
Item Rate
5 days
Malda
Please refer Tender documents.
6 documents required · 6 mandatory
₹40,876
30 Apr 2021
10 Mar 2021
24 Mar 2021
10 Mar 2021
22 Mar 2021
11 Mar 2021
Amount
(i) Up to 3 days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 18 Nos x 27 No of Days = 486 Nos)
S & providing on hire basis 500V/220V, 32A / way, 6 way PDB with isolator on wooden plank board or suitable angle iron frame incl. providing inter coonection, socketing, earthing attachment etc. & dismantling the same at the end of the function (With PWD approve materials).
(i) Up to 3 days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.). (Qty = 36 Nos x 27 No of Days = 972 Nos)
S & providing on hire basis Main Switch with 1.1 KV grade PVC / A Al cable of folllowing sizes incl. laying in trench / wall with shadding arrangement dismantling the same & mending good the damage at the end of the program (With PWD approve materials).
(a) 4 core 16 sq. mm. PVC / A cable.
(i) Up to 3 days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 450 Mtrs x 27 No of Days = 12150 Nos)
(b) 2 core 4 to10 sq. mm. PVC / A cable.
(i) Up to 3 days -
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 1950 Mtrs x 27 No of Days = 52650 Nos)
S & drawing on hire basis 2x1.5 sq. mm. / 4 sq. mm PVC Cu. wire incl. dismantling the same at the end of function.
(i) Upto 3 Days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 3000 Mtrs x 27 No of Days = 81000 Mtrs)
Distribution wiring with 2 x 1.5 sq.mm. PVC Cu. Wire to light / fan points in alkathine pipe on hire basis & dismantling the same at the end of the program (Without individual control switch).
(i) Upto 3 Days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 540 Pts x 27 No of Days = 14580 Pts)
S & providing on hire basis 250 watt Metal Hallide fitings with necessary clamping arrangemnt to be fixed on existing wooden / bamboo or on wall incl. gear box & replacement of fuse lamp.
(i) Upto 3 Days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 37 Nos x 27 No of Days = 3727 Nos)
S & providing on hire basis 4 Ft. 40 watt Single Tube Light (commercial type) fitings with necessary Tube lamp & replacement of fuse lamp.
(i) Upto 3 Days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 279 Nos x 27 No of Days = 7533 Nos)
Supplying & Providing on hire basis 200 V AC 1400 mm sweep ceiling fan with down rod as reqd. incl. dismantling the same.
(i) Upto 3 Days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 261 Nos x 27 No of Days = 7047 Nos)
Supplying & Providing on 600 mm sweep Air Circulator.
(i) Upto 3 Days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 32 Nos x 27 No of Days = 864 Nos)
Supplying & Providing on hire basis (3 Nos.) 5 amp plug point on casing board with earthing attachment. (For Mobile Charger and Stand Fan)
(i) Upto 3 Days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 307 Pcs x 27 No of Days = 8289 Pcs.)
Earthing the installation with 50 mm. dia G. I. pipe 2.5 Mtr. to 3 Mtr. long & 6 / 8 SWG G. I. wire with bolts, nuts etc.below the GL on hire basis & dismantling the same at the end of the program.
(i) Upto 3 Days.
(ii) Next 27 Days after 3 Days. (@ 2% of the rate of first 3 days per day.) (Qty = 74 Nos x 27 No of Days = 1998 Nos)
Hiring & Installation charges for the following capacity DG Sets. incl. All accessories.
(i) 5 KVA DG (Single phase) for Harishchandrapur High School for 30 days. (No of Days 30 x no. of DG 3 = 90 Nos.)
(ii) 30 KVA DG (Three phase) for 5 School for 30 days. (No of Days 30 x no. of DG 9) = 270 Nos.
To and fro Transportation charges incl. loading & unloading.
(i) 30 KVA DG sets and electrical equipments for 5 Nos School.
(ii) 5 KVA DG sets and electrical equipments for Harishchandrapur High School.
Charge of Electrical Supervisor 01 No. for each shift x 3 shift per day for 30 days for each of 6 Nos School. (Qty. = No of shift 3 x No of days 30 x no of School 6 = 540)
Fuel consumption for DG Set with during consumption.
(i) For 5 KVA DG Set. @ 2 Ltr./DG/Hr. (Qty. = No. of DG 3 x no of days 30 x no of working hours 4 = 360 Hrs.).
(ii) For 30 KVA DG Set. @ 8 Ltr./DG/Hr. (Qty. = No. of DG 9 x no of days 30 x no of working hours 4 = 1080 Hrs.).
N.B.: 1) Rate should be inclusive of all taxes, duties & CESS etc including GST which will not be paid extra (on Item No. 01.00 to 14.00). 2) The bidder is bound to quote exact unit rate maximum upto 2% of the base rate of 1st 3 days per day calculated upto 2nd decimal value as required against Item Sl. Nos. 01.02, 02.02, 03.03, 3.06, 04.02, 05.02, 06.02, 07.02, 08.02, 09.02, 10.02 & 11.02 as spelt out in the BOQ, deviation from which will cause the regection of the bid. 3)The bidder will have to quote the fuel rate based on the market rate on the date of bidding. 4) The cost of fuel may be charged depending on the actual cost of fuel during the time of execution of work. Log book to be maintained strictly on daily basis.
M/S EASTERN ENGINEERING
ARGHYA BHATTACHARYA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .