Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC Rates are below estimated rates. rates of Ist lowest. | |
| 2 | L2₹2.9 L+₹43,452 (17.3%)Rejected-AOC | L2 | Rejected-AOC Rates are below estimated rates. rates of IInd lowest. | |
| 3 | L3₹3.0 L+₹48,869.06 (19.4%)Rejected-AOC | L3 | Rejected-AOC Rates are below estimated rates. rates of IIIrd lowest. | |
| 4 | L4₹3.0 L+₹53,074 (21.1%)Rejected-Finance | L4 | Rejected-Finance Rates are IV Lowest | |
| 5 | L5₹3.4 L+₹93,044 (37.0%)Rejected-Finance | L5 | Rejected-Finance Rates are V Lowest |
Tender Value
₹4.3 L
EMD Value
₹8,700
Closing Date
22 Feb 2018, 12:00 pmClosed
EXECUTIVE ENGINNER
HEAD WORKS DIVISION SHARDA CANAL, BAREILLY
SHARDA MAIN CANAL KE LEFT BANK PER ESTIHT SILT EJECTER KE SAMEEP PARK KE SUDHAR , MARRAMMAT EVM SAUNDRYEKARAN KE KARYA
2018_UPIDC_150859_1
03/EE/2017-18
Open Tender
Civil Works - Canal
Item Wise
30 days
BANBASSA
Please refer Tender documents.
2 documents required · 2 mandatory
₹177
EXECUTIVE ENGINEER HEAD WORKS DIVISION SHARDACANAL
₹8,700
Yes
8 Mar 2021
16 Feb 2018
22 Feb 2018
16 Feb 2018
22 Feb 2018
16 Feb 2018
Amount
Cleaning Thick bushes and thorny Jungle without uprooting with its proper disposal.
Earth work for levelling of park by power transport for a lead beyond 200 m upto 3.00 km including excavation loading unloading mannual compaction and dressing including all lift.
Scraping old white wash i/c disposal of refuse with in distance of 60 M as per direction of Engineer in charge including cost of all material, labour and T&P etc. complete work as per required
finishing walls with water proofing cement paints of approved make such as super snowcem, durrocem, robiacem guttucem, superment quality of required shade on uncoated wall surface (one coat) over one coat wite cement primer to give even shades after thoroughty brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all material, labour and T&P etc. complete work.
Cement Plaster 12.50 MM thick with 1:4 cement, coarse sand including cost of all material, labour charges & T&P etc. required for proper completion of work.
Painting on steel sruface including cleaning the surface of all dust including all cost of labour, material, T&P etc. complete for proper completion of work.
C.C. 1:1.5:3 in cement, coarse sand & shingle in Floor repair cost of all material, labour charges & T&P etc. required for proper completion of work.
Providing banbed iron with fencing including fixing in to post after staching including all material fo banbed with labour, T&P etc. complete of proper completion of work.
Girish kishore
ALI AND BROTHER
FEROZ KHAN CONRACTOR
M/s Purnagiri Construction Co. Pvt. Ltd.
M/S HUSNEN AHAMD CONTRACTOR
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .