Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance ALAMPUR NODAKHALI | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹3.6 L+₹6,322 (1.80%)Admitted-Finance BHAGIRATHIPUR DOMKAL MSD | DOMKAL | MURSHIDABAD | WEST BENGAL | 742101 | ₹3.6 L+₹6,322 (1.80%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 L+₹8,106 (2.31%)Admitted-Finance SANTINEKATAN ROAD BOLPUR | BOLPUR | ₹3.6 L+₹8,106 (2.31%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SINHA ELECTRICALS L3 | M/S.S.S.ENTERPRISE L2 | S. P. CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00All materials supply as per sample | ||||||
| 1.01 | Fixed Contact Connected with HT taping of
Transformer as per sample. | 27 | Each | 5,448 ₹1,47,096 | 5,421 ₹1,46,367 | 5,325 ₹1,43,775 Lowest |
| 1.02 | Main Moving Contact Assly connected with HT taping
of Transformer. | 3 | Each | 12,870 ₹38,610 | 12,806 ₹38,418 | 12,580 ₹37,740 Lowest |
| 1.03 | Resistor Moving Contact Assly connected with HT
taping of Transformer. | 3 | Each | 12,870 ₹38,610 | 12,806 ₹38,418 | 12,580 ₹37,740 Lowest |
| 1.04 | Transition Resistance Assly for protecting transformer
open ckt. at the time of changing tap position from
one tap to another tap. | 1 | Each | 24,600 ₹24,600 | 24,478 ₹24,478 | 24,045 ₹24,045 Lowest |
| 1.05 | Energy Accumulator for force tap changing if spring
energized. | 1 | Each | 18,866 ₹18,866 | 18,772 ₹18,772 | 18,440 ₹18,440 Lowest |
| 1.06 | Bearing Plate Assly Supply (standard). | 1 | Each | 23,419 ₹23,419 | 23,302 ₹23,302 | 22,890 ₹22,890 Lowest |
| 1.07 | Gasket for OLTC Top Cover. | 1 | /Set | 14,167 ₹14,167 | 14,097 ₹14,097 | 13,848 ₹13,848 Lowest |
| 1.08 | Gasket for OLTC bottom portion. | 1 | /Set | 7,085 ₹7,085 | 7,050 ₹7,050 | 6,925 ₹6,925 Lowest |
| 1.09 | Oil Seal washer for OLTC. | 1 | /Set | 1,770 ₹1,770 | 1,761 ₹1,761 | 1,730 ₹1,730 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,700
Closing Date
29 Aug 2026, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Supply and delivery of different Spare Parts and rectification of CTR make OLTC Sl. no. 1428350,Type EN16, Yr of Manufac2015 at INTAKE under Falta-Mathurapur Surface water supply scheme, South 24 Paraganas Dist.
2026_PHED_1036370_10
WBPHE/EE/SMD/NIeT-19 of 2026-27
Open Tender
Electrical Work/ Equipment
Item Rate
60 days
Falta Mathurapur
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,700
24 Sept 2026
5 Aug 2026
31 Aug 2026
5 Aug 2026
29 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1All materials supply as per sample | |||||
| 1.01 | Fixed Contact Connected with HT taping of
Transformer as per sample. | - | Each | - | - |
| 1.02 | Main Moving Contact Assly connected with HT taping
of Transformer. | - | Each | - | - |
| 1.03 | Resistor Moving Contact Assly connected with HT
taping of Transformer. | - | Each | - | - |
| 1.04 | Transition Resistance Assly for protecting transformer
open ckt. at the time of changing tap position from
one tap to another tap. | - | Each | - | - |
| 1.05 | Energy Accumulator for force tap changing if spring
energized. | - | Each | - | - |
| 1.06 | Bearing Plate Assly Supply (standard). | - | Each | - | - |
| 1.07 | Gasket for OLTC Top Cover. | - | /Set | - | - |
| 1.08 | Gasket for OLTC bottom portion. | - | /Set | - | - |
| 1.09 | Oil Seal washer for OLTC. | - | /Set | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.25 MB
BOQ_2545924.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .