Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹5.8 L+₹5,268.65 (0.91%)Accepted-Finance | L2 | Accepted-Finance Admitted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RAJNI INFRA L1 | VK CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds from Internal and External Portion of Canal Section including all cost of labour, T&P, disposal of uprooted Jhund etc complete in all respect. | 1,206 | Nos | 33.75 ₹40,702.5 Lowest | 40 ₹48,240 |
| 2.00 | Earthwork in Silt Clearance from the internal Section of canal by hydraulic excavator (JCB), capacity of 25 cum/hour including lift up to 1.5M and lead up to 6.0 M. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by engineer-in-charge. | 4,434 | Cum | 38.6 ₹1,71,152.4 Lowest | 45 ₹1,99,530 |
| 3.00 | Full dressing of Earth/Silt after digging the silt from the Internal section of Canal including all cost of labour, T&P, compaction etc. required for proper completion of work. | 4,434 | Cum | 5.8 ₹25,717.2 Lowest | 7 ₹31,038 |
| 4.00 | Earthwork in Silt Clearance from the internal section of canal by manual labour including lift up to 1.5M and lead upto 30 M .The earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by engineer-in-charge. | 2,107 | Cum | 62 ₹1,30,634 | 45 ₹94,815 Lowest |
| 5.00 | Earthwork in Silt Clearance from the internal Section of canal by hydraulic excavator (JCB), capacity of 25 cum/hour including lift up to 1.5M and lead up to 1.0 Km by power transport. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by engineer-in-charge. | 608 | Cum | 145 ₹88,160 | 45 ₹27,360 Lowest |
| 6.00 | Scrapping internal section of existing canal i.e bed and slope with silt up to 5cm including all cost of labour, T&P, compaction etc. required for proper completion of work. | 28,849 | Sqm | 4.25 ₹1,22,608.25 Lowest | 5 ₹1,44,245 |
| 7.00 | Cleaning thick bushes and thorny jungle without uprooting. | 85 | %Sqm | 1 ₹85 Lowest | 460 ₹39,100 |
Tender Value
₹6.1 L
EMD Value
₹12,200
Closing Date
3 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex. Eng., Meerut Division Ganga Canal, Meerut
Office of the Ex. Eng., Meerut Division Ganga Canal, Meerut
TN 08/EE/2026-27 Silt Clearance Internal Section of Ujheda Minor from km. 0.000 to km. 12.000 (Lot-27)
2026_UPIDC_1190485_27
TN 08/EE/2026-27
Open Tender
Civil Works - Canal
Piece-work
15 days
As per Tender Notice
As per Tender Notice
2 documents required · 2 mandatory
₹766
₹12,200
28 Oct 2026
28 Sept 2026
3 Oct 2026
28 Sept 2026
3 Oct 2026
28 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds from Internal and External Portion of Canal Section including all cost of labour, T&P, disposal of uprooted Jhund etc complete in all respect. | 1,206 | Nos | - | - |
| 2 | Earthwork in Silt Clearance from the internal Section of canal by hydraulic excavator (JCB), capacity of 25 cum/hour including lift up to 1.5M and lead up to 6.0 M. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by engineer-in-charge. | 4,434 | Cum | - | - |
| 3 | Full dressing of Earth/Silt after digging the silt from the Internal section of Canal including all cost of labour, T&P, compaction etc. required for proper completion of work. | 4,434 | Cum | - | - |
| 4 | Earthwork in Silt Clearance from the internal section of canal by manual labour including lift up to 1.5M and lead upto 30 M .The earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by engineer-in-charge. | 2,107 | Cum | - | - |
| 5 | Earthwork in Silt Clearance from the internal Section of canal by hydraulic excavator (JCB), capacity of 25 cum/hour including lift up to 1.5M and lead up to 1.0 Km by power transport. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by engineer-in-charge. | 608 | Cum | - | - |
| 6 | Scrapping internal section of existing canal i.e bed and slope with silt up to 5cm including all cost of labour, T&P, compaction etc. required for proper completion of work. | 28,849 | Sqm | - | - |
| 7 | Cleaning thick bushes and thorny jungle without uprooting. | 85 | %Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.13 MB
Tendernotice_2.pdf
PDF • 0.32 MB
Tendernotice_3.pdf
PDF • 1.01 MB
Tendernotice_4.pdf
PDF • 0.24 MB
BOQ_2244108.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .