Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.4 Laccepted-finance | ₹8.4 L | accepted-finance |
Tender Value
₹8.5 L
EMD Value
₹10,000
Closing Date
16 May 2026, 9:30 pmClosed
Rural Development and Panchayat Raj Department
BUILDING
292036
RDPR/2025-26/BD/WORK_INDENT24528
Reserved
Buildings
RDPR Division Office Chikkodi
6 documents required · 6 mandatory
₹500
₹10,000
16 May 2026
30 Apr 2026
15 May 2026
CONSTRUCTION OF COMMUNITY HALL NEAR SHEDULED CASTE COLONY IN KERUR VILLAGE TQ CHIKKODI BELAGAVI DISTRICT (SC)
Earth work excavation by manual means for drains,canals, waste weir draft,approach channels, key trench, foundation of Bridges and such similar works,as per drawing and technical specifications, inclu...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m heigh...
The cost of steel reinforcement & formwork to be paid separately) Centering / Scaffolding (Add 5% on Rate) Foundation, Sub structure of Cross drainages. complete as per direction of the Engineer-in-c...
The cost of steel reinforcement & formwork to be paid separately) Centering / Scaffolding (Add 70% on Rate) RCC Columns / Shaft (Slip Centering) . complete as per direction of the Engineer-in-charge ...
Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) i...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift u...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
The cost of steel reinforcement & formwork to be paid separately) Centering / Scaffolding (Add 70% on Rate) RCC Columns / Shaft (Slip Centering). complete as per direction of the Engineer-in-charge of...
The cost of steel reinforcement & formwork to be paid separately) Centering / Scaffolding (Add 50% on Rate) Plinth beam. complete as per direction of the Engineer-in-charge of the work
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
The cost of steel reinforcement & formwork to be paid separately) Centering / Scaffolding (Add 60% on Rate) RCC Beams, Lintels. complete as per direction of the Engineer-in-charge of the work
The cost of steel reinforcement & formwork to be paid separately) Centering / Scaffolding (Add 50% on Rate) Slab. complete as per direction of the Engineer-in-charge of the work
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-1 NEW SC ST _ FINAL.docx
Tender Document • 0.12 MB
Download all tender documents and submit your bid